Resource Type

Month

2 Matching Results

Results open in a new window/tab.

Circumventing chloride ion trouble Columbia River water (open access)

Circumventing chloride ion trouble Columbia River water

This report contains data acquired during sampling of the Columbia River water on March 26, 1945. Topics of discussion include; the elevation of chlorine levels from 4 ppm to 20 ppm, what steps should be taken to remediate the problem, and the various processes that were taken into consideration for the clean up of this chlorine. Separation processes considered include; ion exchange, distillation, precipitation, heat exchange, and recirculation through a cooling tower.
Date: March 26, 1943
Creator: Worthington, H.
System: The UNT Digital Library
Water analyses: Project 9536 (open access)

Water analyses: Project 9536

None
Date: March 26, 1943
Creator: Daniels, H. T.
System: The UNT Digital Library