Wheat Crop on Mr. George Wickers Farm

Caption says, "A-3 Altus Project. Wheat crop on farm owned by Mr. George Wickers, one and one-half miles west of Blair, Oklahoma. , Section 25, T. 4N. , R. 21W. Jack McMillin in wheat 26 inches high. Average height of wheat raised was about 20 inches. Crop yield about 12 bushels to the acre. Bill Chaney on tractor."
Date: July 25, 1940
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Carryall Unit

Caption says, "A-290 Borrow areas E35, E34-a, and E2, respectively, from immediate foreground to line of trees in background."
Date: August 25, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Carryall Unit

Caption says, "A-289 East Dike, upstream toe of main of "B" section, 15 feet upstream from upstream toe. Looking north."
Date: August 25, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Cutoff Trench

Caption says, "A-285 Cutoff trench area indicated by white lines at south end of proposed dam (upper right hand corner of picture) from Station 2+62.5."
Date: August 25, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Cutoff Trench

Caption says, "A-286 Cutoff trench enclosed by white lines (upper left portion of picture). Looking north from Station 0+25."
Date: August 25, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Rock Ridge and Cutoff Trench

Caption says, "A-287 Telephoto from Station 0+25 showing north end of cutoff trench from lowest point in low area of rock ridge."
Date: August 25, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Rocky Surface in Cutoff Trench

Caption says, "A-288 Detail photograph from Station 1+00 showing rocky surface in lowest point in low area in cutoff trench."
Date: August 25, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Carryall Equipment on Road

Carryall equipment working on the Altus highway and railroad relocation project. Caption says, "A-601 Carryall on Highway No. 44 relocation fill, Station No. 50."
Date: February 25, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Construction Crew Excavating

Large shovel and dump truck with several laborers working on the Altus highway and railroad relocation project. Caption says, "A-603 Northwest shovel No. 2 excavating drain on Highway No. 44 relocation, Station No. 59."
Date: February 25, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Construction Equipment

Construction equipment working on the Altus highway and railroad relocation project. Caption says, "A-600 Looking west along Highway No. 44 relocation fill, Station No. 46."
Date: February 25, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Excavating relocation area

Construction equipment working on the Altus highway and railroad relocation project. Caption says, "A-599 Excavating relocation area of Santa Fe Railroad west of Station No. 45"
Date: February 25, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Rock cut out for relocation

Rock cut out for the Altus highway and railroad relocation project. Caption says, "A-598 East toward rock cut on Santa Fe Railroad relocation from Station No. 45."
Date: February 25, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Wagon Crew Drilling

Laborers drilling rock for the Altus highway and railroad relocation project. Caption says, "A-602 Wagon drilling on Station No. 60 west of rock cut, Santa Fe Railroad relocation."
Date: February 25, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Large Bulldozer Moving Rock

Large bulldozer moving rock for the Altus highway and railroad relocation project. Caption says, "A-643 Large Caterpillar bulldozer sloping highway 44, vicinity of Station 70. Caterpillar is suspended over side of slope by cable attached to large tractor on highway above."
Date: March 25, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Large Bulldozer Moving Rock

Large bulldozer moving rock for the Altus highway and railroad relocation project. Caption says, "A-644 Large Caterpillar bulldozer, sloping side of highway 44, vicinity of Station 70."
Date: March 25, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Small Bulldozer Moving Rock

Large bulldozer moving rock for the Altus highway railroad relocation project. Caption says, "A-645 Small Caterpillar bulldozer sloping side of Highway 44, vicinity of Station 70."
Date: March 25, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Panorama of Then Present Altus Reservoir

Caption says, "A-718 Panorama. A view of the present Altus reservoir taken from the walkup on the gate structure showing the area next to the dam one hour after the gates had been closed. The dam spilled eight hours later."
Date: June 25, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Panorama of Then Present Altus Reservoir

Caption says, "A-716 Panorama. A view of the present Altus reservoir taken from a point upstream from the south abutment showing the aggravated condition of the present storage system. This picture was taken during a heavy runoff with all sluice gates open. The silt banks in the background are within a few inches of the elevation of the top of the dam."
Date: June 25, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Panorama of Then Present Altus Reservoir

Caption says, "A-719 Panorama. A view of the present Altus reservoir taken from the walkway on the gate structure showing area next to the dam one hour after the gates had been closed. The dam spilled eight hours later."
Date: June 25, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Panorama of Then Present Altus Reservoir

Caption says, "A-717 Panorama. A view of the present Altus reservoir taken from a point upstream from the south abutment showing the aggravated condition of the present storage system. This picture was taken during a heavy runoff with all sluice gates open. The silt banks in the background are within a few inches of the elevation of the top of the dam."
Date: June 25, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Silt Deposits

Caption says, "A-720 Close-up view of silt deposit in the present Altus reservoir taken during sluicing operations. A great deal of the area next to the upstream face of the dam was cleared of silt before this picture was taken. Two streams from the river runoff may be seen entering the area at the base of the dam."
Date: June 25, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Aggregate Stock Pile

Depicts the aggregate stock pile area for the Altus project. Caption says, "A-787 View of aggregate stock pile area. Note Euclid bottom dump truck unloading 3" - 6" size of aggregate from crushing and screening plant and small dump truck unloading #4 - 3/4" size aggregate from sand plant."
Date: November 25, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Closeup of Sand Plant Layout

Close up view of the sand plant for the Altus Project. Caption says, "A-782 Close-up view of sand plant. A portion of the processed sand stockpile is visible in the foreground."
Date: November 25, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Rock Crushing Plant in Operation

Rock crushing plant in operation for the Altus highway and railroad relocation project. Caption says, "A-786 View of crushing and screening plant showing belt conveyor arrangement and loading bunkers. Note Euclid bottom dump truck loading 1 1/2" - 3" size aggregate."
Date: November 25, 1942
Creator: Breitenstein, Frank C.