100 Matching Results

Results open in a new window/tab.

Bitter Creek Flood

Caption says, "A-410 Bitter Creek Flood. Section line road three-fourths mile east of Bitter Creek Bridge; west of Altus on Highway #62. Cotton field on left, alfalfa field on right. In left background is a stack of newly cut alfalfa hay in flooded area."
Date: October 23, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Bitter Creek Flooding Alfalfa Field

Caption says, "A-411 Bitter Creek Flood. Flooded alfalfa field west of Altus on Highway #62. Photograph taken from east bank of Bitter Creek south of highway."
Date: October 23, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Bitter Creek Flooding Cotton Field

Caption says, "A-412 Bitter Creek Flood. Flooded cotton field, one-half mile east of Bitter Creek Bridge, west of Altus on Highway #62."
Date: October 23, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Carryall Equipment near Water

View of construction equipment moving dirt near water for the Altus highway and railroad relocation project. Caption says, "A-549 Carryall sloping shoofly on Rock Island Railroad vicinity Station No. 4513. Photograph was taken from Highway No. 9 bridge."
Date: January 23, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Completed mixing plants

Wooden buildings which make up the completed mixing and batching cement plants for the Altus Dam project. Caption says, "A-793 View of completed mixing and batching plants. Two steel bins at left are for aggregates and bin on right for pumicite. The 135 ft. conveyor connecting the batching and mixing plant has been covered to protect the cement and pumicite both of which will be batched on the belt at the batching plant. A portion of the aggregate stockpiles is shown in the foreground."
Date: December 23, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Completed mixing plants

Wooden structures where the cement is mixed for the Altus dam project. Caption says, "A-794 View of completed batching plant with mixing plant in right background."
Date: December 23, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Compressor Units

Laborers working with compressor units to continue jackhammer work. Caption says, "A-105 Official Photograph. Two compressor units supplying air for jackhammers for drilling operations on Lugert Butte."
Date: May 23, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Downstream Face

Caption says, "A-642 East Dike, section A. Downstream face, 15 feet downstream from downstream toe."
Date: March 23, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Excavation on Lugert Butte

Two small rock piles in center of image with laborers standing on them. Caption says, "A-104 Official Photograph. Rock excavation on Lugert Butte. Highway # 44 will be re-routed through rock outcrops of the butte."
Date: May 23, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Foundation Clean Up

View of the foundation of the new Altus Dam for the Altus Dam project. Caption says, "A-796 Clean up operations in foundation of Altus Dam showing progress on demolition of old dam."
Date: December 23, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Foundation of Altus Dam

Foundation for the Altus Dam project. Caption says, "A-795 View of foundation for Altus Dam showing partial excavation for uncontrolled spillway apron in right background."
Date: December 23, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Laborers Spacing Ties

Caption says, "A-799 Tie spacing operations at Station 101 on Santa Fe Relocation. Men in background are plugging holes in used ties."
Date: December 23, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Laborers Track laying

Caption says, "A-797 A.T. & S.F. tracklaying gang at the entrance to the rock cut about Station 55+00. Ties were hauled and spaced ahead by Government forces."
Date: December 23, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Laborers with Diesel Truck

Caption says, "A-106 Official Photograph. Diesel oil supply truck used for transporting fuel oil for carryall tractors in the field. The truck is a ton International. All remodeling was done in the shops of the Bureau of Reclamation."
Date: May 23, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Large Shovel Digging

Large shovel digging away at granite rocks. Caption says, "A-21 Altus Project. The large shovel at work cutting the earth and rocks away from the foot of the mountains for the rock quarry. The type of engine used in the Northwest Drag line and dual crowd shovel. It has a caterpillar Diesel 100 horse power engine."
Date: October 23, 1940
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Masonry

Caption says, "A-842 Placing of first masonry on left abutment. Forms for contraction joint under construction."
Date: March 23, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Panorama 1 of 4

Caption says, "A-638 East Dike, section C from rock point west of Section A. Panorama No. 1 of 4."
Date: March 23, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Panorama 2 of 4

Caption says, "A-639 East Dike, sections C and B. Panorama No. 2 of 4."
Date: March 23, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Panorama 3 of 4

Caption says, "A-640 East Dike, section B. Panorama No. 3 of 4."
Date: March 23, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Panorama 4 of 4

Caption says, "A-641 East Dike, section A looking east. Panorama No. 4 of 4."
Date: March 23, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Shovel Moving Rock

Large shovel in foreground moving granite rocks. Caption says, "A-22 Altus Project. Northwest Shovel moving rock and dirt from side of Rattlesnake Mountain. Slabs of rock will cut from the solid face of granite and hewn into square and rectangular blocks for masonry material in the construction of Altus Dam. Photograph taken from photo station #3 on west side of quarry. Wagon drilling outfit above cab of shovel."
Date: October 23, 1940
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Spacing and Hauling Railroad Ties

Caption says, "A-798 Hauling and spacing ties ahead of Santa Fe tracklaying crew. Trackfittings had been previously spaced by the roadbed by Government forces."
Date: December 23, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Standing under Railroad Bridge

View from under a newly constructed railroad bridge for the Altus highway and railroad relocation project. Caption says, "A-548 Carryall sloping shoofly on Rock Island Railroad relocation vicinity of Station No. 4513."
Date: January 23, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

View of Construction Site

High angle view of Altus highway and railroad relocation project site. Caption says, "A-635 Wide angle photograph of area between Santa Fe Railroad, left, and Highway 44, right; vicinity of Station 82, being filled in with waste from rock cut."
Date: March 23, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History