Resource Type

Degree Department

3,915 Matching Results

Results open in a new window/tab.

6 GeV light source project cost estimating procedure (open access)

6 GeV light source project cost estimating procedure

To maintain uniformity in estimating the cost requirements of the various components of the 6 GeV Light Source, the following procedure will be used by all the task groups. The procedure uses a Work Breakdown Structure (VBS) to break down the project into manageable, easy to estimate, components. The project is first broken down into major tasks or categories. Then each major division is continuously subdivided until the desired level of detail is achieved. This can be shown best by using the example of the WBS of the Aladdin Upgrade Project, excerpts of which are included in Appendix A.
Date: October 23, 1985
Creator: unknown
System: The UNT Digital Library
An 8-Foot Axisymmetrical Fixed Nozzle for Subsonic Mach Numbers Up to 0.99 and for a Supersonic Mach Number of 1.2 (open access)

An 8-Foot Axisymmetrical Fixed Nozzle for Subsonic Mach Numbers Up to 0.99 and for a Supersonic Mach Number of 1.2

From Introduction: "This paper, which should be of interest to those concerned with transonic wind tunnels, covers the design and operating characteristics of the nozzle."
Date: February 23, 1950
Creator: Ritchie, Virgil S.; Wright, Ray H. & Tulin, Marshall P.
System: The UNT Digital Library
9/11 Commission Recommendations: Intelligence Budget (open access)

9/11 Commission Recommendations: Intelligence Budget

This report describes recommendations of the 9/11 Commission as pertains to the intelligence budget.
Date: October 23, 2004
Creator: Nicola, Thomas J.
System: The UNT Digital Library
9/11 Commission Recommendations: The Senate Confirmation Process for Presidential Nominees (open access)

9/11 Commission Recommendations: The Senate Confirmation Process for Presidential Nominees

On July 22, 2004, the National Commission on Terrorist Attacks Upon the United States, known as the 9/11 Commission, issued its final report, detailing the events up to and including the September 11, 2001 terrorist attacks upon the United States. The 9/11 Commission recommended that the Senate adopt rules requiring hearings and votes to confirm or reject national security nominees within 30 days of their submission at the start of each new presidential administration. Implementing the commission's proposal would involve imposing new restrictions on both the power of committee chairs to control the agenda of their committees and the rights of Senators to delay or block nominations through holds and extended debate. This report discusses in detail this proposal, how it could be implemented, and the potential effects of its implementation.
Date: March 23, 2005
Creator: Palmer, Betsy
System: The UNT Digital Library
25 Process Assistance. For Period of May 2, 1955 to May 13, 1955 (open access)

25 Process Assistance. For Period of May 2, 1955 to May 13, 1955

None
Date: May 23, 1955
Creator: Culler, F L
System: The UNT Digital Library
100 Area electrical distribution fault and coordination report (open access)

100 Area electrical distribution fault and coordination report

This report documents three-phase and line-to-ground fault values and time overcurrent coordination curves for the electrical utility distribution system located in the 100 Areas. Activities that may improve the coordination of the distribution system have also been identified. An evaluation of system coordination was performed. The results of this evaluation are listed in Appendix B. There are protective devices within the 100 Area distribution system that do not coordinate with one another throughout the Areas. There is also a mis-application of reclosing relays at the 100B Area. The impact of the mis-coordination and incorrect application of reclosing relays is that system selectivity is reduced. Equipment will still be protected against damaging currents, however more equipment will be de-energized than necessary during fault conditions. It is the opinion of the author of this report that the cases of mis-coordination listed above, and in Appendix B, do not significantly degrade the system protection system nor the reliability of the 100 Area distribution system. Therefore, immediate response to correct these problems is not recommended. However, a planned methodology, outlined in an Activity Plan, to correct these problems should be developed and implemented in the near future.
Date: September 23, 1994
Creator: Webber, J. J.
System: The UNT Digital Library
100 Area Water Study (open access)

100 Area Water Study

This paper gives a cost breakdown of all the water facilities in the 100-F area for the month of January, 1948. Also given is the cost of chlorine for addition to the process water system along with where it is added and in what amounts. Lastly, the average figure for the hardness for the Columbia River water at Hanford.
Date: September 23, 1948
Creator: Beekman, S. W.
System: The UNT Digital Library
100 Areas: (For technical progress letter No. 111), August 13--August 19 (open access)

100 Areas: (For technical progress letter No. 111), August 13--August 19

This technical progress report details 100 Area activities for the time period of August 13 through August 19, 1946.
Date: August 23, 1946
Creator: Jordan, W. E.
System: The UNT Digital Library
105-DR Large sodium fire facility soil sampling data evaluation report (open access)

105-DR Large sodium fire facility soil sampling data evaluation report

This report evaluates the soil sampling activities, soil sample analysis, and soil sample data associated with the closure activities at the 105-DR Large Sodium Fire Facility. The evaluation compares these activities to the regulatory requirements for meeting clean closure. The report concludes that there is no soil contamination from the waste treatment activities.
Date: January 23, 1996
Creator: Adler, J. G.
System: The UNT Digital Library
222-S Analytical services final results for Tank 241-U-101, grab samples 1U-96-1 through 1U-96-4 (open access)

222-S Analytical services final results for Tank 241-U-101, grab samples 1U-96-1 through 1U-96-4

This document is the final, format IV, laboratory report for characterization of tank 241-U-101 (U-101) grab samples from risers 1 and 7. It transmits additional analytical data for specific gravity (Sp.G.), and all raw analytical data which were not provided in the 45-day report. The 45-day report is attached to this final report as Part II. Secondary analyses were not performed on any of the U-101 samples. This is because none of the primary analyte limits, which trigger the performance of secondary analyses, were exceeded. Grab samples were taken on May 29, 1996 and May 30, 1996 from risers 1 and 7, respectively, and were received at the 222-S Laboratory on the same days that they were collected. Analyses were performed in accordance with the Tank Sampling and Analysis Plan (TSAP) for this tank and the Safety Screening Data Quality Objective (DQO). The samples were analyzed for differential scanning calorimetry (DSC), thermogravimetric analysis (TGA), total alpha activity (AT), visual appearance, bulk density, and specific gravity. A sample data summary table, includes sample analytical data accompanied by quality control data (for example, duplicate, spike, blank and standard results and detection limits and counting efforts). The table includes data for DSC, TGA, …
Date: August 23, 1996
Creator: Miller, G. L.
System: The UNT Digital Library
234-5 project specification letter 235-41 Chemical Development Laboratory (open access)

234-5 project specification letter 235-41 Chemical Development Laboratory

This document presents details of the specifications for the chemical development laboratory, in accordance with project 234-5.
Date: December 23, 1947
Creator: Work, J.B.
System: The UNT Digital Library
241-AZ-101 Waste Tank Color Video Camera System Shop Acceptance Test Report (open access)

241-AZ-101 Waste Tank Color Video Camera System Shop Acceptance Test Report

This report includes shop acceptance test results. The test was performed prior to installation at tank AZ-101. Both the camera system and camera purge system were originally sought and procured as a part of initial waste retrieval project W-151.
Date: March 23, 2000
Creator: Werry, S. M.
System: The UNT Digital Library
242-A Evaporator Condensate Tank (TK-C-100) tie down evaluation (open access)

242-A Evaporator Condensate Tank (TK-C-100) tie down evaluation

The existing Condensate Tank (TK-C-100) in the 242-A Evaporator building is not anchored to the floor slab. This tank is a Safety Class 3 sitting in a Safety Class 2 building. The tank needed to be evaluated to withstand the seismic loads. Anchor bolts have been designed to hold the tank during the seismic event.
Date: January 23, 1995
Creator: Hundal, T. S.
System: The UNT Digital Library
242-A Evaporator ion exchange column (IX-D-1) tie down evaluation (open access)

242-A Evaporator ion exchange column (IX-D-1) tie down evaluation

The existing ion exchange column in the 242-A evaporator building is not anchored to the floor slab. This equipment is a Safety Class 3 sitting in a Safety Class 2 building. The column needed to be evaluated to withstand the seismic loads. Anchor bolts have been designed to hold the column during the seismic event.
Date: January 23, 1995
Creator: Hundal, T. S.
System: The UNT Digital Library
242-A/LERF programmable Logic Controller Ladder. Revision 1 (open access)

242-A/LERF programmable Logic Controller Ladder. Revision 1

This document defines and describes the user-generated application software written to transmit digital and analog signals from the Liquid Effluent Retention Facility (LERF) to the 242-A Evaporator Distributed Control System (DCS). PLCs and modems were installed in the 242-A Evaporator by Project W-105 (LERF) to transmit 6 analog liquid level signals, 6 range alarms based on the analog signals, and 6 leak detection and pump status signals to the 242-A Distributive Control System (DCS) from LERF. Communications between the two facilities are also monitored and alarm on the DCS. Following the Project W-105 completion, the communications and signal mix were modified by Project C-018H (ETF). The current PLC software (including ladder logic and data tables), PLC hardware settings, and modern option settings to transmit the signals and monitor communications are documented and described in this document.
Date: May 23, 1995
Creator: Teats, M.C.
System: The UNT Digital Library
1706-KER Coolant Test Facility Operations Manual (open access)

1706-KER Coolant Test Facility Operations Manual

This procedure is intended to be used as: 1. An instruction and guide for operation of the KER loops. 2. To aid in familiarization and understanding of the general operation of the loops. 3. To prevent lost time due to errors in loop operation. The procedure is not meant to be completely comprehensive in all details of loop operation.
Date: January 23, 1958
Creator: Dulin, R. V.
System: The UNT Digital Library
1999 Leak Detection and Monitoring and Mitigation Strategy Update (open access)

1999 Leak Detection and Monitoring and Mitigation Strategy Update

This document is a complete revision of WHC-SD-WM-ES-378, Rev 1. This update includes recent developments in Leak Detection, Leak Monitoring, and Leak Mitigation technologies, as well as, recent developments in single-shell tank retrieval technologies. In addition, a single-shell tank retrieval release protection strategy is presented.
Date: September 23, 1999
Creator: Ohl, Phil
System: The UNT Digital Library
The 2001 and 2003 Bush Tax Cuts and Deficit Reduction (open access)

The 2001 and 2003 Bush Tax Cuts and Deficit Reduction

This report uses the context of the current and long-term economic environment to examine the tax cuts implemented by the George W. Bush Administration, including the Economic Growth and Tax Relief Reconciliation Act of 2001 and the Jobs and Growth Tax Relief Reconciliation Act of 2003.
Date: July 23, 2012
Creator: Hungerford, Thomas L.
System: The UNT Digital Library
2003 East Tennessee Technology Park Annual Illness and Injury Surveillance Report (open access)

2003 East Tennessee Technology Park Annual Illness and Injury Surveillance Report

Annual Illness and Injury Surveillance Program report for 2003 for the East Tennessee Technology Park (K-25).The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. The Illness and Injury Surveillance Program monitors illnesses and health conditions that result in an absence of workdays, occupational injuries and illnesses, and disabilities and deaths among current workers.
Date: May 23, 2007
Creator: United States. Department of Energy. Office of Illness and Injury Prevention Programs.
System: The UNT Digital Library
2003 Idaho National Engineering and Environmental Laboratory Annual Illness and Injury Surveillance Report (open access)

2003 Idaho National Engineering and Environmental Laboratory Annual Illness and Injury Surveillance Report

Annual Illness and Injury Surveillance Program report for 2003 for Idaho National Lab. The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. The Illness and Injury Surveillance Program monitors illnesses and health conditions that result in an absence of workdays, occupational injuries and illnesses, and disabilities and deaths among current workers.
Date: May 23, 2007
Creator: United States. Department of Energy. Office of Illness and Injury Prevention Programs.
System: The UNT Digital Library
2003 Lawrence Livermore National Laboratory Annual Illness and Injury Surveillance Report (open access)

2003 Lawrence Livermore National Laboratory Annual Illness and Injury Surveillance Report

Annual Illness and Injury Surveillance Program report for 2003 for Lawrence Livermore National Lab. The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. The IISP monitors illnesses and health conditions that result in an absence of workdays, occupational injuries and illnesses, and disabilities and deaths among current workers.
Date: May 23, 2007
Creator: United States. Department of Energy. Office of Illness and Injury Prevention Programs.
System: The UNT Digital Library
2003 Nevada Test Site Annual Illness and Injury Surveillance Report (open access)

2003 Nevada Test Site Annual Illness and Injury Surveillance Report

Annual Illness and Injury Surveillance Program report for 2003 for the Nevada Test Site. The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. The Illness and Injury Surveillance Program monitors illnesses and health conditions that result in an absence of workdays, occupational injuries and illnesses, and disabilities and deaths among current workers.
Date: May 23, 2007
Creator: United States. Department of Energy. Office of Illness and Injury Prevention Programs.
System: The UNT Digital Library
2003 Oak Ridge National Laboratory Annual Illness and Injury Surveillance Report (open access)

2003 Oak Ridge National Laboratory Annual Illness and Injury Surveillance Report

Annual Illness and Injury Surveillance Program report for 2003 for ORNL. The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. The Illness and Injury Surveillance Program monitors illnesses and health conditions that result in an absence of workdays, occupational injuries and illnesses, and disabilities and deaths among current workers.
Date: May 23, 2007
Creator: United States. Department of Energy. Office of Illness and Injury Prevention Programs.
System: The UNT Digital Library
2003 Sandia National Laboratories--Albuquerque Annual Illness and Injury Surveillance Report (open access)

2003 Sandia National Laboratories--Albuquerque Annual Illness and Injury Surveillance Report

Annual Illness and Injury Surveillance Program report for 2003 for Sandia National Laboratories-Albuquerque. The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. The IISP monitors illnesses and health conditions that result in an absence of workdays, occupational injuries and illnesses, and disabilities and deaths among current workers.
Date: May 23, 2007
Creator: United States. Department of Energy. Office of Illness and Injury Prevention Programs.
System: The UNT Digital Library