Completed Railroad Line

Caption says, "A-831 View of the completed line at north end of rock cut. A.T. & S.F. Railroad Relocation."
Date: February 22, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Concrete Placing

Caption says, "A-884 Concrete placing activities on right abutment. Concrete buckets are lifted from trucks near the downstream face."
Date: July 22, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Concrete Plants

Caption says, "A-883 View of concrete mixing and batching plants. Cement storage house on the right. Note 13 c.y. Euclid trucks being used to haul two 2-c.y. concrete buckets from plant to dam."
Date: July 22, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Dry Reservoir

Caption says, "A-895 View of Altus Dam taken from reservoir after completion of initial construction. Reservoir has been dry since August 5, 1943."
Date: September 22, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Effect of Water on Dam Foundation

Caption says, "A-813 View of main portion of dam foundation showing effect of wear due to water course before present dam was built. This picture was taken before final cleanup, Altus Dam - Altus Project."
Date: January 22, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Fissure Extending Through Foundation

Caption says, "A-812 Large fissure extending upstream through foundation of Altus Dam and connecting to large hole in Photo A-819 - Altus Project."
Date: January 22, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Form-Building

Captions says, "A-829 Completion of intermediate training wall footing and apron slab on left face of wall. Form-building is in progress on slab in controlled spillway."
Date: February 22, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Foundation Rock

Caption says, "A-811 View of foundation rock before final clean up in main portion of Dam - Altus Project."
Date: January 22, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Foundation Rock

Caption says, "A-810 Condition of foundation rock in right portion of spillway after blasting to grade, Altus Dam - Altus Project."
Date: January 22, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Foundation Rock

Caption says, "A-809 View of foundation rock at the edge of large water worn hole in spillway. See A-819, Altus Dam - Altus Project."
Date: January 22, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Hole Worn in Foundation

Caption says, "A-814 Closeup view of hole worn in rock spillway foundation. Altus Dam - Altus Project."
Date: January 22, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

A-line Grouting

Caption says, "A-826 A-line grouting and drainage nipples set in place along gallery location before covering this portion of foundation with concrete. At right may be seen upstream edge of concrete placed to date."
Date: February 22, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Masonry

Caption says, "A-827 First granite masonry placed in Altus Dam. Because of rough rock foundation concrete pedestals were placed to start first course of rubble masonry in upstream face."
Date: February 22, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

New Station Facilities Location

Caption says, "A-832 New location for station facilities and siding for Lugert, Oklahoma. Ballast has been windrowed in preparation to laying track for siding. A.T. & S.F. Railroad Relocation."
Date: February 22, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Placing Operations

Caption says, "A-830 View of completed portion of downstream toe of dam and showing placing operations in the footing for the intermediate training wall."
Date: February 22, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Progress of Concrete

Caption says, "A-828 View from right abutment showing progress of concrete on downstream toe of dam. Timber mats are used under crane moving over concrete."