Collection
Counties
12 Matching Results
Results open in a new window/tab.
Results:
1 - 12 of
12
Overchute
Caption says, "5-AL-341. Specification No. 1133. View showing completed overchute at Station 506+80 on the Altus Canal. Guard rail has not been installed and canal excavation is not complete."
Date:
August 21, 1946
Creator:
Reynolds, R. M.
System:
The Gateway to Oklahoma History
Bituminous Test Panels
Caption says, "5-AL-344. Main Canal. View showing a closeup of bituminous test panels applied to soil cement in the Main Canal Test Section."
Date:
August 21, 1946
Creator:
Reynolds, R. M.
System:
The Gateway to Oklahoma History
Bituminous Test Panels
Caption says, "5-AL-346. Main Canal. View showing a closeup of bituminous test panels applied to soil cement in the Main Canal Test Section."
Date:
August 21, 1946
Creator:
Reynolds, R. M.
System:
The Gateway to Oklahoma History
Installing Concrete Pipe
Caption says, "5-AL-342. Specification No. 1180. View showing the installation of twenty-four inch pre-cast concrete pipe in a roadway siphon on the Altus 9.9j lateral at Station 130+35."
Date:
August 21, 1946
Creator:
Reynolds, R. M.
System:
The Gateway to Oklahoma History
Bituminous Test Panels
Caption says, "5-AL-345. Main Canal. View showing a closeup of bituminous test panels applied to soil cement in the Main Canal Test Section."
Date:
August 21, 1946
Creator:
Reynolds, R. M.
System:
The Gateway to Oklahoma History
Installing Concrete Pipe
Caption says, "5-AL-343. Specification No. 1180. View showing the installation of twenty-four inch pre-cast concrete pipe in a roadway siphon on the Altus 9.9 j lateral at Station 130+35."
Date:
August 21, 1946
Creator:
Reynolds, R. M.
System:
The Gateway to Oklahoma History
Buchanan Sand Pit
Caption says, "A-933 Near completed screening plant being erected at Buchanan Pit."
Date:
August 21, 1944
Creator:
George, P. W.
System:
The Gateway to Oklahoma History
Main Canal Excavation
Caption says, "A-940 Excavation of Main Canal in sand hill near Station 135+00."
Date:
August 21, 1944
Creator:
George, P. W.
System:
The Gateway to Oklahoma History
Concrete Placing
Caption says, "A-936 Method used in placing concrete on all abutment sections during final construction period of dam. Truck, fitted with special, heavy tires is lifted to top surface by crane and shuttles 2 c.y. batches of concrete from crane to point of placement."
Date:
August 21, 1944
Creator:
George, P. W.
System:
The Gateway to Oklahoma History
Construction Progress
Caption says, "A-931 View of progress on construction of dam during August 1944. Parapet stone being placed in foreground."
Date:
August 21, 1944
Creator:
George, P. W.
System:
The Gateway to Oklahoma History
Construction Progress
Caption says, "A-934 Progress on dam construction as viewed from right abutment."
Date:
August 21, 1944
Creator:
George, P. W.
System:
The Gateway to Oklahoma History
Highway 44 and Main Canal Bridge
Caption says, "A-937 Construction progress on State Highway No. 44 bridge over Main Canal at Station 59+36."
Date:
August 21, 1944
Creator:
George, P. W.
System:
The Gateway to Oklahoma History