Derrick Moving Stone

Caption says, "A-403 Rock quarry. Portable derrick moving face stone in stoneyard below quarry."
Date: October 20, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Unloading Materials

Caption says, "A-955 Unloading ties and track materials for C.R.I. F. Ry. shoofly track. This shoofly will be used for railroad traffic during the raising of the main line track and bridge. Completion of the random fill and shoofly grade may be seen in the background."
Date: October 20, 1944
Creator: George, P. W.
System: The Gateway to Oklahoma History

Cores from Drain Holes

Caption says, "5-AL-1196. Cores from additional drain holes in gallery of Altus Dam. D-61.5 indicates location of hole. Box is 5' long."
Date: October 20, 1949
Creator: George, P. W.
System: The Gateway to Oklahoma History

Cores from Drain Holes

Caption says, "5-AL-1197. Cores from additional drain holes in gallery of Altus Dam. D-62.5 indicates location of hole. Box is 5' long."
Date: October 20, 1949
Creator: George, P. W.
System: The Gateway to Oklahoma History

Northwest Shovel and Euclid Truck

Caption says, "A-402 Dike, North. Northwest shovel and Euclid truck in Barrow Area "N" excavating material for North Dike."
Date: October 20, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Derrick Moving Stone

Caption says, "A-404 Rock quarry. Portable derrick moving face stone in stoneyard below quarry."
Date: October 20, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Main Canal Progress

Caption says, "A-954 View of progress of work on Main Canal siphon and bench flume under specifications 1078, taken from about station 115. Contractor's shop and office buildings are seen to the left."
Date: October 20, 1944
Creator: George, P. W.
System: The Gateway to Oklahoma History

Main Canal Excavation

Caption says, "A-952 Excavation for the Main Canal about station 170. The shovel is operating at approximately water surface elevation."
Date: October 20, 1944
Creator: George, P. W.
System: The Gateway to Oklahoma History

Dam Spillway

Caption says, "A-950 View of spillway section of Altus Dam. Elevation of uncontrolled spillway is 1559 and of controlled spillway is 1537. The balance of the concrete in the controlled spillway awaits completion of the work on the C.R.I. & P. Ry. reconstruction."
Date: October 20, 1944
Creator: George, P. W.
System: The Gateway to Oklahoma History

Highway 44 and Main Canal Bridge

Caption says, "A-953 Progress on Highway No. 44 crossing over the Main Canal. The bridge deck is complete and fabrication of guard rail and posts is in progress."
Date: October 20, 1944
Creator: George, P. W.
System: The Gateway to Oklahoma History

Installing Canal Pipes

Caption says, "A-951 Installing the canal outlet pipes and the bellmouth castings in Altus Dam. Excavation for the stilling basin is 95 percent complete."
Date: October 20, 1944
Creator: George, P. W.
System: The Gateway to Oklahoma History