Partner
9 Matching Results
Results open in a new window/tab.
Results:
1 - 9 of
9
Masonry
Caption says, "A-1000 View showing progress on masonry walls of canal outlet gatehouse and placing of concrete in Main Canal check."
Date:
March 19, 1945
Creator:
George, P. W.
System:
The Gateway to Oklahoma History
Pumicite Loading Operations
Caption says, "A-841 General view of pumicite loading operations. Material is dozed into feeder hopper and fed into 20 c.y. truck by means of a conveyor belt."
Date:
March 19, 1943
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Several Dump Trucks on Road
Several large dump trucks on road moving dirt for the Altus highway and railroad relocation project. Caption says, "A-632 Santa Fe Railroad relocation excavated to grade, vicinity of Station 82."
Date:
March 19, 1942
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Several Dump Trucks on Road
Several large dump trucks on road moving dirt for Altus highway and railroad relocation project. Caption says, "A-634 Hug dump trucks and Lima shovel excavating Santa Fe Railroad to grade. Excavation is 70% complete."
Date:
March 19, 1942
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Main Canal Progress
Caption says, "A-999 View showing progress on forming Main Canal check and wasteway at end of canal outlet stilling basin, Altus Dam."
Date:
March 19, 1945
Creator:
George, P. W.
System:
The Gateway to Oklahoma History
Dump Truck on Road
Large dump truck on road for Altus highway and railroad relocation project. Caption says, "A-633 Hug dump trucks on Santa Fe Railroad relocation, vicinity of Station 77. Railroad cut to grade."
Date:
March 19, 1942
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Completed Canal Bank
Caption says, "A-1001 Completed canal bank along highway between Stations 170 and 173 of Main Canal."
Date:
March 19, 1945
Creator:
George, P. W.
System:
The Gateway to Oklahoma History
Dam Spillway
Caption says, "A-998 View showing discharge from river outlet No. 2 of Altus Dam, opened March 17. Estimated discharge approximately 350 c.f.s. Forms are erected for final placing of concrete in controlled spillway before construction of radial gate piers."
Date:
March 19, 1945
Creator:
George, P. W.
System:
The Gateway to Oklahoma History
Pumicite Loading Operations
Caption says, "A-840 Close up of pumicite loading operations. Material in truck is covered with canvas and hauled 17 miles to the dam site."
Date:
March 19, 1943
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History