94 Matching Results

Results open in a new window/tab.

Stakes set for Rock Drilling

Caption says, "A-512 Stakes set for rock drilling at Station 66-50, on Santa Fe relocation."
Date: December 19, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Laborers Working in Rock Cut

Caption says, "A-514 Laborers at work in rock cut, Station 62-50 on Santa Fe Railroad relocation."
Date: December 19, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Drilling Rig

Caption says, "Official photograph. Drilling Rig No. 2 of the J. E. Gray Construction Company in the southeast part of the project. This well is three miles south of Altus and contract calls for a well completed at 3300 feet."
Date: May 19, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

WPA Laborers Digging Holes

Caption says, "A-478 W.P.A. laborers digging grout holes with auger in dike on east side of city of Altus Reservoir."
Date: November 19, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Surveyor's Hub and Camera Case in Barley Crop

Caption says, "A-82 Official photograph. Barley crop, in the southeast section of the project, two and one-half miles south of the city of Altus, Oklahoma, forty-four inches tall. An 18" surveyor's hub and a Commercial 5 X 7 Eastman View Camera Case are used for comparison."
Date: May 19, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Power Shovel Loading Material

Caption says, "A-1056 Specifications No. 1084. Power shovel loading riprap material at State Reformatory quarry near Granite, Oklahoma. Morrison-Knudsen Co., Inc., Contractors."
Date: July 19, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Placing Embankment Material and Riprapping

Caption says, "A-1058 Specifications No. 1084. View showing progress on placing embankment material and riprapping C.R.I. & P.Ry. across Altus reservoir. Morrison-Knudsen Co., Inc., contractor."
Date: July 19, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Outlet Flume and Transitions

Caption says, "5-AL-25. View showing outlet flume and transitions at Station 126+60, looking downstream."
Date: June 19, 1945
Creator: Hovey, D. A.
System: The Gateway to Oklahoma History

Outlet Flume

Caption says, "5-AL-24. View showing outlet flume and transitions at Station 126+60, looking downstream."
Date: June 19, 1945
Creator: Hovey, D. A.
System: The Gateway to Oklahoma History

End of Siphon

Caption says, "5-AL-26. View looking across Red River from downstream end of siphon. View looking upstream."
Date: June 19, 1945
Creator: Hovey, D. A.
System: The Gateway to Oklahoma History

Lining Main Canal

Caption says, "5-AL-18. View in the operations of lining Main Canal with soil cement."
Date: June 19, 1945
Creator: Hovey, D. A.
System: The Gateway to Oklahoma History

Interior of Gatehouse

Caption says, "5-AL-8. View of interior of gatehouse. Photo shows outlet gates control."
Date: June 19, 1945
Creator: Hovey, D. A.
System: The Gateway to Oklahoma History

Men Fishing

Caption says, "5-AL-9. View showing fishing on the downstream side of low bridge approximately one-half mile below Altus Dam on the North Fork of the Red River."
Date: June 19, 1945
Creator: Hovey, D. A.
System: The Gateway to Oklahoma History

Masonry

Caption says, "A-1000 View showing progress on masonry walls of canal outlet gatehouse and placing of concrete in Main Canal check."
Date: March 19, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Method for Mixing Concrete

Caption says, "5-AL-463. Specifications No. 1133. Method used to heat concrete mixer in cold weather to maintain proper temperature of concrete used for bridge deck. Station 486+88, Altus Canal."
Date: December 19, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Caterpillar Working in Main Canal

Caption says, "5-AL-13. View showing caterpillar working in Main Canal near Station 39+50. Caterpillar is tamping down blanket material prior to the lining of soil cement."
Date: June 19, 1945
Creator: Hovey, D. A.
System: The Gateway to Oklahoma History

End of Siphon

Caption says, "5-AL-27. View looking across Red River from downstream end of siphon. View looking upstream."
Date: June 19, 1945
Creator: Hovey, D. A.
System: The Gateway to Oklahoma History

Land Slide

Caption says, "5-AL-28. View showing land slide on the Main Canal approximately one mile below Station 126+60. Slide was caused by heavy rains. View looking downstream."
Date: June 19, 1945
Creator: Finch, F. S.
System: The Gateway to Oklahoma History

Lining Main Canal

Caption says, "5-AL-16. View in the operations of lining Main Canal with soil cement."
Date: June 19, 1945
Creator: Hovey, D. A.
System: The Gateway to Oklahoma History

Lining Main Canal

Caption says, "5-AL-19. View in the operations of lining Main Canal with soil cement."
Date: June 19, 1945
Creator: Hovey, D. A.
System: The Gateway to Oklahoma History

Caterpillar Working in Main Canal

Caption says, "5-AL-12. View showing caterpillar working in Main Canal near Station 39+50. Caterpillar is tamping down blanket material prior to the lining of soil cement."
Date: June 19, 1945
Creator: Hovey, D. A.
System: The Gateway to Oklahoma History

Interior of Gatehouse

Caption says, "5-AL-7. View of interior of gatehouse. Photo shows outlet gates control."
Date: June 19, 1945
Creator: Hovey, D. A.
System: The Gateway to Oklahoma History

Lining Main Canal

Caption says, "5-AL-14. View in the operations of lining Main Canal with soil cement."
Date: June 19, 1945
Creator: Hovey, D. A.
System: The Gateway to Oklahoma History

Lining Main Canal

Caption says, "5-AL-17. View in the operations of lining Main Canal with soil cement."
Date: June 19, 1945
Creator: Hovey, D. A.
System: The Gateway to Oklahoma History