Water Conservation; Water Erosion; Flooding and Prevention

Photograph of bay city crane placing key wall for the support of riprap. Crane is working on a bern at elevation 934.0. Note the depth of trench for key wall and size of rock. This view taken at Station 28 - 00. OK-8485.
Date: February 18, 1943
Creator: Blackart, F. E.
System: The Gateway to Oklahoma History

Water Conservation; Water Erosion; Flooding and Prevention

Photograph of dam construction, Lake Carl Blackwell. Looking north from station 21 showing berm construction at Elevation 934 and the construction of key wall for support of riprap. Rock crusher working on crown of dam in the upper right corner of the picture. OK-8483.
Date: February 18, 1943
Creator: Blackart, F. E.
System: The Gateway to Oklahoma History

Water Conservation; Water Erosion; Flooding and Prevention

Photograph looking south along the face of a dam. Kay wall for support of riprap being constructed. Wall in place from siphons about station 28 - 00 to about Station 39 - 00. OK-8488.
Date: February 18, 1943
Creator: Blackart, F. E.
System: The Gateway to Oklahoma History

Water Conservation; Water Erosion; Flooding and Prevention

Photograph of a Bay City crane placing a key wall for the support of riprap. The crane is working on berm at elevation 934.0. Note the depth of the trench for the key wall and the size of the rock. This view was taken at Station 28 of Lake Carl Blackwell, in Stillwater. OK-8485.
Date: February 18, 1943
Creator: Blackert, F. E.
System: The Gateway to Oklahoma History