High Performance UO2 Program Quarterly Progress Report No. 12 January-March 1964 (open access)

High Performance UO2 Program Quarterly Progress Report No. 12 January-March 1964

Work performed during the quarter is summarized by: direct measurement of fission gas pressure, loop operations, performance of UO2 fuel, UO2 grain growth and melting studies.
Date: April 15, 1964
Creator: Weidenbaum, B.
System: The UNT Digital Library
High Performance UO2 Program Quarterly Progress Report No. 11 October-December 1963 (open access)

High Performance UO2 Program Quarterly Progress Report No. 11 October-December 1963

Work performed during the quarter is summarized by: direct measurement of fission gas pressure, loop operations, performance of UO2 fuel, UO2 grain growth and melting studies.
Date: January 15, 1964
Creator: Weidenbaum, B.
System: The UNT Digital Library
High Performance UO2 Program Quarterly Progress Report No. 10 July-September 1963 (open access)

High Performance UO2 Program Quarterly Progress Report No. 10 July-September 1963

Work performed during the quarter is summarized by; direct measurement of fission gas pressure, loop operations, performance of UO2 fuel, UO2 grain growth and melting studies.
Date: October 15, 1963
Creator: Weidenbaum, B.
System: The UNT Digital Library
High Performance UO2 Program Quarterly Progress Report No. 9 April-June 1963 (open access)

High Performance UO2 Program Quarterly Progress Report No. 9 April-June 1963

Work performed during the quarter is summarized by: direct measurement of fission gas pressure, loop operations, performance of UO2 fuel, UO2 grain growth and melting studies.
Date: July 15, 1963
Creator: Weidenbaum, B.
System: The UNT Digital Library
Nuclear Superheat Quarterly Project Report: Fifteenth Quarter, January-March 1963 (open access)

Nuclear Superheat Quarterly Project Report: Fifteenth Quarter, January-March 1963

From introduction: "This is the fifteenth in a series of quarterly reports which cover the progress and results from the conceptual designs, economic evaluations and research and development work performed by the General Electric Company as part of Contract AT(01-3)-189, Project Agreement No. 13."
Date: May 15, 1963
Creator: Flock, W. L.
System: The UNT Digital Library
High Performance UO2 Program Quarterly Progress Report No.8 : January-March 1963 (open access)

High Performance UO2 Program Quarterly Progress Report No.8 : January-March 1963

Work performed during the quarter is summarized by direct measurement of fission gas pressure, loop operations, performance of UO2 fuel.
Date: April 15, 1963
Creator: Weidenbaum, B.
System: The UNT Digital Library
High Performance UO2 Program Quarterly Progress Report No.7 : October-December 1962 (open access)

High Performance UO2 Program Quarterly Progress Report No.7 : October-December 1962

Work performed during the quarter is summarized by direct measurement of fission gas pressure, loop operations, performance of UO2 fuel.
Date: January 15, 1963
Creator: Weidenbaum, B.
System: The UNT Digital Library
Program For The Development of Plutonium Recycle For Use In Light Water Moderated Reactors Program Summary and Sixth Quarterly Report, July 1 - September 30, 1962 (open access)

Program For The Development of Plutonium Recycle For Use In Light Water Moderated Reactors Program Summary and Sixth Quarterly Report, July 1 - September 30, 1962

The work described in this report represents progress toward an agreement signed by the United States and the European Atomic Energy Community which provides a basis for cooperation in programs for the advancement of peaceful applications of atomic energy.
Date: October 15, 1962
Creator: Carver, J. G.; Lagache, M. P. & Morgan, W. R.
System: The UNT Digital Library
Program For The Development of Plutonium Recycle For Use In Light Water Moderated Reactors Quarterly Report For Period April 1 - June 30, 1962 (open access)

Program For The Development of Plutonium Recycle For Use In Light Water Moderated Reactors Quarterly Report For Period April 1 - June 30, 1962

The Program fuel element has continued under irradiation in the Vallecitos Boiling Water Reactor, thermal energy group transfer cross sections for UO2 have been computed, and data have been reduced from the resonance wire activations performed last quarter. Future plans are included.
Date: July 15, 1962
Creator: Carver, J. G.; Morgan, W. R. & Robkin, M. A.
System: The UNT Digital Library
Program For the Development of Plutonium Recycle For Use in Light Water Moderated Reactors: Quarterly Report For Period January 1 - March 31, 1962 (open access)

Program For the Development of Plutonium Recycle For Use in Light Water Moderated Reactors: Quarterly Report For Period January 1 - March 31, 1962

This is a report of work completed during the period January 1, 1962, to March 31, 1962. Work was done on fuel irradiation, activation studies and UO2 scattering experiment
Date: April 15, 1962
Creator: Carver, J. G. & Robkin, M. A.
System: The UNT Digital Library
Bounce III (open access)

Bounce III

BOUNCE III is a program which was written for the IBM-704 as part of a study of the parameters of the neutron distribution in a large thermal column. The program calculates the eigenvalues and corresponding eigenvectors of the matrix resulting from a diffusion-theory, multigroup description of the thermal neutron spectrum.
Date: December 15, 1960
Creator: Kerr, B. A.
System: The UNT Digital Library
Final Report: 300 KWe Capsule Nuclear Power Plant Study (open access)

Final Report: 300 KWe Capsule Nuclear Power Plant Study

This document presents the results of investigations concerned with the conceptual design of a 300 KWe "Capsule" nuclear power plant.
Date: December 15, 1960
Creator: General Electric Company
System: The UNT Digital Library
VARI Solution of Simultaneous, First-Order, Ordinary, Differential Equations (open access)

VARI Solution of Simultaneous, First-Order, Ordinary, Differential Equations

VARI solves on the IBM-650 a system of simultaneous, first-order, ordinary, differential equations. The program was written so that a large number of calculations could be done in a reasonable length of time. The program permits the consideration of the production of the isotope by absorption and/or decay of one or more of any of the other isotopes in the chain.
Date: March 15, 1960
Creator: Kerr, B. A.
System: The UNT Digital Library