ANALYSIS--GRAPHITE CORE STRUCTURE (open access)

ANALYSIS--GRAPHITE CORE STRUCTURE

A study was made to determine the structural and functional adequacy of the EGCR graphite core design. Maximum stress and distortion of the core and the probable operating time before graphite cracking were determined. The major cause of stress is non-uniform fast-neutron flux, which causes non-uniform shrinkage of graphite components. The critical stress was found to be tensile. The criterion for determining the time of cracking of graphite columns appears to be the point at which the creep strain results in rupture. Column life before cracking may also be related to the maximum allowable stress at rupture. It was concluded that non-uniform shrinkage is the major cause of distortion of graphite components of the core. In general the amount by which a column tends to bow during 20-year core life exceeds the available free space. The combined internally generated and bowing stresses result in an average period before cracking of all core columns of 14 years, with a minimum period of 6 years. (M.C.G.)
Date: December 14, 1960
Creator: Newton, R.R.
System: The UNT Digital Library
Evaluation of Mercury Cooled Breeder Reactors (open access)

Evaluation of Mercury Cooled Breeder Reactors

A technical and economic evaluation of a mercury-cooled fast breeder reactor is presented. The objectives of the program were to establish the technical feasibility of a fast breeder reactor cooled with boiling mercury and to evaluate the long-range potential of such a reactor power plant for production of economic power. Details of the conceptual design of a 100-Mw(e) reactor and system are discussed. The power cost from a mercury cooled fast breeder reactor was estimated as 21.4 mills/kwh which is competitive with the power cost for the initial Enrico Fermi plant. It was concluded that this reactor concept is technically feasible and has promising long-range economic potential. (M.C.G.)
Date: December 14, 1960
Creator: Battles, D.W.
System: The UNT Digital Library
Irradiation Processing Department monthly report, November 1960 (open access)

Irradiation Processing Department monthly report, November 1960

This document details activities of the irradiation processing department during the month of November, 1960. A general summary is included at the start of the report, after which the report is divided into the following sections: Research and Engineering Operation; Production and Reactor Operations; Facilities Engineering Operation; Employee Relations Operation; Financial Operation; and NPR Project.
Date: December 14, 1960
Creator: unknown
System: The UNT Digital Library