Redox Equipment Testing Report No. 4 (open access)

Redox Equipment Testing Report No. 4

A report which covers progress on the testing of the General Engineering and Consulting Laboratory Turbine Pump No. 1 from June 16, 1948, to July 31, 1948.
Date: August 9, 1948
Creator: Cooper, V. R. & Allen, A. W.
System: The UNT Digital Library
Parian and Teflon in 1A Redox Solutions (open access)

Parian and Teflon in 1A Redox Solutions

This report analyzes Parian and Teflon that were exposed to solutions of 1AX, 1AS, and 1AF, ANL June 1, 1948 Flowsheet, under conditions described in the following report.
Date: May 9, 1949
Creator: Koenig, W. W.
System: The UNT Digital Library