16 Matching Results

Results open in a new window/tab.

Concrete Operations

Laborers working on creating concrete for the Altus highway and railroad relocation project. Caption says, "A-740 Concrete batching operations downstream Transition Walls, Main Canal A.T. & S.F. Railroad Siphon, Main Canal Station 55+73."
Date: August 8, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Concrete Operations

Laboerers working on creating concrete for the Altus highway and railroad relocation project. Caption says, "A-741 Concrete Mixing and Placing Operations downstream Transition Walls Main Canal, A.T. & S.F. Railroad siphon. Main Canal Station 55+73."
Date: August 8, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Construction of Suspension Bridge

Construction site, Caption says, "A-742 Construction of suspension bridge for 24 inch wood pipe line furnishing the City of Altus with water. Partial excavation of the diversion channel in the background shows the intersection with pipeline location.
Date: August 8, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Construction of water diversion channel

Construction site for diversion channel. Caption says, "A-743 View of preparations for suspension of Altus City Water Line over the diversion Channel. Cable towers are being erected in the foreground."
Date: August 8, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Bars on Chattin Ditcher

Caption says, "5-AL-329. View showing spreader bars on Chattin 20-60 Ditcher."
Date: August 8, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Chattin Ditcher

Caption says, "5-AL-324. View showing Chattin 20-60 Ditcher. View shows manually operated hydraulic system for raising the cutting edge and mold-boards."
Date: August 8, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Chattin Ditcher

Caption says, "5-AL-326. View showing Chattin 20-60 Ditcher - detail of cutting edge and hydraulic cylinder for raising the cutting edge."
Date: August 8, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Chattin Ditcher

Caption says, "5-AL-323. Specifications No. 1180. View showing Chattin 20-60 Ditcher with maximum dirt load. Altus 9.9 lateral, Station 431+75."
Date: August 8, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Chattin Ditcher

Caption says, "5-AL-325. View showing Chattin 20-60 Ditcher bars for spreading adjustable wing."
Date: August 8, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Mold-Board on Chattin Ditcher

Caption says, "5-AL-328. View showing left mold-board completely raised on Chattin 20-60 Ditcher. Note position of wheel and hydraulic ram."
Date: August 8, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Mold-Board on Chattin Ditcher

Caption says, "5-AL-327. View showing mold-board completely down on Chattin 20-60 Ditcher. Note position of wheel and hydraulic ram."
Date: August 8, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Experimental Asphalt

Caption says, "5-AL-1266. Experimental asphalt membrane lining with no cover, appoximately 5 weeks after placing."
Date: August 8, 1950
Creator: George, P. W.
System: The Gateway to Oklahoma History

Experimental Asphalt

Caption says, "5-AL-1268. Experimental asphalt membrane lining with cut-back asphalt penetrated crushed stone cover, approximately 5 weeks after placing."
Date: August 8, 1950
Creator: George, P. W.
System: The Gateway to Oklahoma History

Experimental Asphalt

Caption says, "5-AL-1267. Experimental asphalt membrane lining with tack coat and stone chip cover, approximately 5 weeks after placing."
Date: August 8, 1950
Creator: George, P. W.
System: The Gateway to Oklahoma History

Experimental Asphalt

Caption says, "5-AL_1269. Experimental asphalt membrane lining with pit-run gravel blanket cover, approximately 5 weeks after placing."
Date: August 8, 1950
Creator: George, P. W.
System: The Gateway to Oklahoma History

Experimental Asphalt

Caption says, "5-AL-1270. Experimental asphalt membrane lining with earth blanket cover, approximately 5 weeks after placing."
Date: August 8, 1950
Creator: George, P. W.
System: The Gateway to Oklahoma History