Field Handling Study of Heavy Aggregate Concrete (open access)

Field Handling Study of Heavy Aggregate Concrete

Purpose: "This test was conducted to gain information and experience in the handling of heavy aggregate concrete. The results from this test were to establish procedures for a subsequent program -- "Construction Test of High Density Concrete Shielding.""
Date: December 7, 1951
Creator: Emmons, C. D.
System: The UNT Digital Library
Rear Face Monitoring by Television:  Supplementary Report (open access)

Rear Face Monitoring by Television: Supplementary Report

Supervision and coordination of shutdown work are often made difficult by lack of visual contact between the front face, rear face and control room. Examples of such conditions are: Removal of process tubes, where close co-separation between front and rear elevator crews is required; Locating freshly discharged slugs accidently lodged on discharge face obstructions where radiation levels are high and optical viewing equipment inadequate; Monitoring of the transfer of hot samples from a process tube into a cask, where permissible exposure time is short and oral briefing of personnel who must perform subsequent operations is inadequate.
Date: December 7, 1953
Creator: Morris, W. J.
System: The UNT Digital Library