Collection
2 Matching Results
Results open in a new window/tab.
Results:
1 - 2 of
2
Fuels Preparation Department monthly report, September 1961
This document details activities of the Fuels Preparation Department during the month of September, 1961. (FI)
Date:
October 7, 1961
Creator:
unknown
System:
The UNT Digital Library
Hazards Report for SM-1 Core II Without the SM-1 Core I High Burnup Elements and With the PM-1-M-2 Element
Abstract: The removal of both SM-1 Core I high burnup elements from SM-1 Core II and the insertion of the PM-1-M-2 element and the SM-1 Core I spare element in SM-1 Core II is discussed. Nuclear and thermal characteristics of Core II with these changes are presented and conclusions related to the changes in the hazard potential are made. If the core change indicated by this report is made, local peaking factors will be decreased and burnout ratios will be increased. This, of course, in itself leads to a more conservative estimate of core safety. There is no conceivable reason why the perturbation may not be safely made in the SM-1 Core II.
Date:
October 7, 1961
Creator:
Coombe, J. R.; Lee, D. H. & Mathews, F. T.
System:
The UNT Digital Library