199 Matching Results

Results open in a new window/tab.

Thomas Office Building, Midland, Texas: Plumbing Riser Diagram

Plumbing riser diagram for an office building commissioned by J. B. Thomas in Midland, Texas. It includes measurements, directional lines, floor level labels, and power lines.
Date: April 6, 1927
Creator: David S. Castle Co.
System: The Portal to Texas History

Haskell National Bank, Haskell, Texas: Window, Door, & Trim Renderings

Window, door, and trim renderings for a bank building commissioned by Haskell National Bank in Haskell, Texas. Sections include full size handrail bracket, section thru beams in banking room, elevation of typical corridor opening, typical door, typical toilet partition, toilet door, door frames in stud partitions, full size sticking for interior doors, full size sticking for toilet doors, detail of d.h. windows, full size details of trim, three inch details of corridor openings, and detail of wrought iron window guards.
Date: April 6, 1924
Creator: David S. Castle Co.
System: The Portal to Texas History

Thomas Office Building, Midland, Texas: Door & Window Details

Door and window details for an office building commissioned by J. B. Thomas in Midland, Texas. Sections include 3" detail of hollow metal windows, 3" detail of double hung window, diagram for typical office entrance, 3" detail of transom sash, 3" detail of outside door to stair tower, 3" details for typical office entrance, 3" detail of fire stair door number 7, 3" detail of typical interior doors, 3" detail of entrance doors to store number 1 & lobby, door number 6 for lobby entrance to store number 2, and 3" detail of plate glass front of store number 1 & lobby.
Date: April 6, 1927
Creator: David S. Castle Co.
System: The Portal to Texas History

Business Building, Abilene, Texas: Floor Plan

Floor plan for a business building commissioned by H. O. Wooten in Abilene, Texas. It includes measurements, wall boundary lines, labels, and room names. Other sections include plumbing and electrical symbols, and a section thru mud trap.
Date: November 6, 1939
Creator: David S. Castle Co.
System: The Portal to Texas History

Prairie Oil and Gas Company Office Building, Eastland, Texas: Second Floor Framing Plan

Second floor framing plan for an office building commissioned by the Prairie Oil and Gas Company in Eastland, Texas. It features wall edge lines, framing lines, measurements, and labels. Other sections include notes, typical slab section, detail wall beam showing blocking out for S. & S. windows, vault stair, stair from basement, and second floor beam schedule.
Date: August 6, 1919
Creator: Castle, David S.
System: The Portal to Texas History

Elementary School Building, Abilene, Texas: Foundation Plan - Administration Unit

Administration unit foundation plan for an elementary school building in Abilene, Texas. It features column base placement, wall edge lines, and measurements. Other sections include kitchen slab reinforcing details, roof beam schedule, typical roof beam steel placement diagram, roof beam notes, and footing schedule.
Date: July 6, 1956
Creator: David S. Castle Co.
System: The Portal to Texas History

Diagram Schematic, Power Supply, Bendix LEAM

Technical drawing showing the layout of diagram schematic, power supply, Bendix LEAM including labeled scale drawings, revisions and explanatory notes.
Date: February 6, 1971
Creator: unknown
System: The Portal to Texas History