82 Matching Results

Results open in a new window/tab.

Altus Canal

Caption says, "5-AL-534. Finished lined and rolled section of the Altus Canal. View taken from bridge, looking downstream from Station 323-00."
Date: March 5, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

Altus Canal

Caption says, "5-AL-839. Specifications No. 1374. View of city lake turnout, parshall flume and inlet to 30" siphon, Station 757+70, Altus Canal."
Date: December 5, 1947
Creator: George, P. W.
System: The Gateway to Oklahoma History

Altus Canal

Caption says, "5-AL-504. Altus Canal. Compacting clay-lining material in seepage area of the Altus Canal by means of a D-8 Caterpillar tractor. Photograph taken near Station 339-00."
Date: February 5, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

Altus Dam

Caption says, "5-AL-814. View of Altus Dam and adjacent areas during the dedication ceremonies for the W. C. Austin Project. Photograph was taken from top of near-by mountain with wide-angle lens."
Date: September 5, 1947
Creator: George, P. W.
System: The Gateway to Oklahoma History

Backfilling

Caption says, "5-AL-526. Specifications No. 1133. View looking downstream from Station 411-00, showing backfilling of overexcavated portion of Altus Canal."
Date: March 5, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

Backfilling Operations

Caption says, "5-AL-525. Specifications no. 1374. General view showing backfilling operations on inlet end of siphon at Station 971-26, Altus Canal."
Date: March 5, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

Backfilling Operations

Caption says, "5-AL-524. Specifications No. 1374. Backfilling operations on inlet end of siphon at Station 971-26, Altus Canal."
Date: March 5, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

Backfilling Turnout

Caption says, "5-AL-407. Specifications No. 1133. Backfilling combination turnout from Altus Canal to Altus City Pipe Line and Altus 11.1 Lateral. View taken at Station 588+00."
Date: November 5, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Central Batching Plant

Caption says, "5-AL-409. Specifications No. 1179. View of central batching plant assembled by Stebbins Construction Company at Blair, Oklahoma."
Date: November 5, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Chattin Ditcher Excavating

Caption says, "5-AL-528. Specifications No. 1133. Three-quarter front view of Chattin Ditcher excavating Altus 4.1a lateral at Station 11-00."
Date: March 5, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

Chattin Ditcher Excavating

Caption says, "5-AL-529. Specifications No. 1133. Rear view of Chattin Ditcher excavating Altus 4.1a lateral at Station 11-00."
Date: March 5, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

Completed Canal Section

Caption says, "5-AL-530. Specifications No. 1133. View of completed section of the Altus Canal, looking downstream from Station 594-00."
Date: March 5, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

Completed Inlet

Caption says, "5-AL-527. Specifications No. 1179. Completed inlet of siphon at Station 1-85.17, West Canal."
Date: March 5, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

Concrete Placing

Caption says, "5-AL-457. Specification 1374. General view showing concrete placing operation on partially completed check at Station 789+50, Altus Canal."
Date: December 5, 1946
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

Concrete Placing

Caption says. "A-822 View of first concrete placing operations. Concrete is hauled from mixing plant in 2 c. y. bottom-dump buckets and placed by means of a Lima Crane."
Date: February 5, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Concrete Placing

Caption says, "5-AL-840. Specifications No. 1811. View of 18" turnout, lt., Station 10-00 on Ozark 1.5 lateral, after completion of concrete placing."
Date: December 5, 1947
Creator: George, P. W.
System: The Gateway to Oklahoma History

Concrete Placing

Caption says, "A-821 View of first concrete placing operations looking north from area excavated for the south abutment."
Date: February 5, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Concrete Placing Operations

Caption says, "5-AL-456. Specification No. 1374. General view showing concrete placing operations on partially completed check at Station 789+50, Altus Canal. Portable batching and mixing equipment in background."
Date: December 5, 1946
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

Concrete Work Completed

Caption says, "-AL-531. Specifications No. 1180. Check at Station 431-75, Altus 9.9 Lateral, with concrete work completed."
Date: March 5, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

Cores from Drain Holes

Caption says, "5-AL-1240. Cores from additional drain holes in gallery of Altus Dam. D-80.5 indicates location of hole. Box is 5' long."
Date: December 5, 1949
Creator: George, P. W.
System: The Gateway to Oklahoma History

Cores from Drain Holes

Caption says, "5-AL-1241. Cores from additional drain holes in gallery of Altus Dam. D-45.5 indicates location of hole. Box is 5' long."
Date: December 5, 1949
Creator: George, P. W.
System: The Gateway to Oklahoma History

Cores from Drain Holes

Caption says, "5-AL-1242. Cores from additional drain holes in gallery of Altus Dam. D-81.5 indicates location of hole. Box is 5' long."
Date: December 5, 1949
Creator: George, P. W.
System: The Gateway to Oklahoma History

CRI&P Railway Bridge

Caption says, "5-AL-521. Specifications No. 1510. Temporary railway trestle (foreground) converted for use as a highway detour bridge where State Highway No. 9 crosses the North Fork of the Red River near Granite, Oklahoma. View also shows relative elevation of C R I & P railroad bridge on which construction has been completed."
Date: March 5, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

CRI&P Railway Bridge

Caption says, "5-AL-520. Specifications No. 1510. General view looking west of elevated C R I & P railway bridge (right) temporary trestle in center which has been converted for use as a one-way highway bridge while State Highway No. 9 bridge (far left) is being elevated."
Date: March 5, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History