82 Matching Results

Results open in a new window/tab.

Soil and Moisture Conservation

Caption says, "5-AL-1111. Soil and Moisture Conservation Program, W. C. Austin Project. View of part of Diversion Terrace No. 1, which will spread water which goes down old road in foreground. Altus Reservoir beyond the terrace."
Date: January 5, 1949
Creator: George, P. W.
System: The Gateway to Oklahoma History

Soil and Moisture Conservation

Caption says, "5-AL-1114. Soil and Moisture Conservation Program, W. C. Austin Project. General view of Detention Dam No. 3, with dirt work completed. For a view of this area before work was started see photograph No. 5-AL-1103."
Date: January 5, 1949
Creator: George, P. W.
System: The Gateway to Oklahoma History

Soil and Moisture Conservation

Caption says, "5-AL-1113. Soil and Moisture Conservation Program, W. C. Austin Project. Close-up view of Diversion Terrace No. 2, on west side of Altus Reservoir."
Date: January 5, 1949
Creator: George, P. W.
System: The Gateway to Oklahoma History

Soil and Moisture Conservation

Caption says, "5-AL-1112. Soil and Moisture Conservation Program, W. C. Austin Project. General view of Diversion Terrace No. 2, which will spread water which runs off adjacent farm land so as to prevent erosion. Altus Reservation in distance."
Date: January 5, 1949
Creator: George, P. W.
System: The Gateway to Oklahoma History

Soil and Moisture Conservation

Caption says, "5-AL-1108. Soil and Moisture Conservation Program, W. C. Austin Project. Workmen placing rip-rap on Detention Dam No. 2."
Date: January 5, 1949
Creator: George, P. W.
System: The Gateway to Oklahoma History

Soil and Moisture Conservation

Caption says, "5-AL-1109. Soil and Moisture Conservation Program, W. C. Austin Project. General view of completed Detention Dam No. 2, located on west side of Altus Reservoir."
Date: January 5, 1949
Creator: George, P. W.
System: The Gateway to Oklahoma History

Soil and Moisture Conservation

Caption says, "5-AL-1110. Soil and Moisture Conservation Program, W. C. Austin Project. Broadside view of completed Detention Dam No. 2, looking upstream. Dam will catch silt which has been coming down the draw into the Altus Reservoir."
Date: January 5, 1949
Creator: George, P. W.
System: The Gateway to Oklahoma History

Soil and Moisture Conservation

Caption says, "5-AL-1107. Soil and Moisture Conservation Program, W. C. Austin Project. View of Detention Dam No. 1, complete except for rip-rapping located on west side of Altus Reservoir."
Date: January 5, 1949
Creator: George, P. W.
System: The Gateway to Oklahoma History

Line of Trucks

Caption says, "5-AL-941. Crops. Line of wheat trucks in Altus waiting to unload. At height of rush there was a total of six such lines in Altus. Most of the wheat marketed in Altus was raised by dry farming methods."
Date: June 5, 1948
Creator: George, P. W.
System: The Gateway to Oklahoma History

Trucks

Caption says, "5-AL-940. Crops. Truck line in Altus, waiting turn to unload wheat at Ledge Mill, seen in background. Two such lines converged on this mill and it was reported that a truck was being unloaded every 2 minutes."
Date: June 5, 1948
Creator: George, P. W.
System: The Gateway to Oklahoma History

Trucks

Caption says, "5-AL-939. Crops. Truck lines on street in Altus, waiting their turn to unload wheat at local elevator."
Date: June 5, 1948
Creator: George, P. W.
System: The Gateway to Oklahoma History

Cores from Drain Holes

Caption says, "5-AL-1240. Cores from additional drain holes in gallery of Altus Dam. D-80.5 indicates location of hole. Box is 5' long."
Date: December 5, 1949
Creator: George, P. W.
System: The Gateway to Oklahoma History

Cores from Drain Holes

Caption says, "5-AL-1241. Cores from additional drain holes in gallery of Altus Dam. D-45.5 indicates location of hole. Box is 5' long."
Date: December 5, 1949
Creator: George, P. W.
System: The Gateway to Oklahoma History

Cores from Drain Holes

Caption says, "5-AL-1242. Cores from additional drain holes in gallery of Altus Dam. D-81.5 indicates location of hole. Box is 5' long."
Date: December 5, 1949
Creator: George, P. W.
System: The Gateway to Oklahoma History

Altus Canal

Caption says, "5-AL-534. Finished lined and rolled section of the Altus Canal. View taken from bridge, looking downstream from Station 323-00."
Date: March 5, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

Altus Canal

Caption says, "5-AL-504. Altus Canal. Compacting clay-lining material in seepage area of the Altus Canal by means of a D-8 Caterpillar tractor. Photograph taken near Station 339-00."
Date: February 5, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

Altus Dam

Caption says, "5-AL-814. View of Altus Dam and adjacent areas during the dedication ceremonies for the W. C. Austin Project. Photograph was taken from top of near-by mountain with wide-angle lens."
Date: September 5, 1947
Creator: George, P. W.
System: The Gateway to Oklahoma History

Parshall Flume

Caption says, "5-AL-845. Specifications No. 1899. View of construction of parshall flume, Station 1-20, Altus 21.5 lateral. Turnout from Altus Canal into Altus 21.5 lateral in background."
Date: December 5, 1947
Creator: Vaughan, R. O.
System: The Gateway to Oklahoma History

Outlet Transition

Caption says, "5-AL-841. Specification No. 1811. View of outlet transition of 36" pipe siphon, Station 9-50."
Date: December 5, 1947
Creator: George, P. W.
System: The Gateway to Oklahoma History

Concrete Placing

Caption says, "5-AL-840. Specifications No. 1811. View of 18" turnout, lt., Station 10-00 on Ozark 1.5 lateral, after completion of concrete placing."
Date: December 5, 1947
Creator: George, P. W.
System: The Gateway to Oklahoma History

Temporary One-Way Highway Bridge

Caption says, "5-AL-522. Specifications No. 1510. General view looking west of completed temporary one-way highway bridge. Guards will be on duty to control traffic over the one-way structure during the time necessary to raise the present State Highway No. 9 bridge."
Date: March 5, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

CRI&P Railway Bridge

Caption says, "5-AL-521. Specifications No. 1510. Temporary railway trestle (foreground) converted for use as a highway detour bridge where State Highway No. 9 crosses the North Fork of the Red River near Granite, Oklahoma. View also shows relative elevation of C R I & P railroad bridge on which construction has been completed."
Date: March 5, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

North Fork Red River Bridge

Caption says, "5-AL-519. Specifications No. 1510. General view looking east across the North Fork of the Red River. Scene shows completed one-way bridge (left) which will be used while State Highway No. 9 bridge (at right) is being elevated."
Date: March 5, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

CRI&P Railway Bridge

Caption says, "5-AL-520. Specifications No. 1510. General view looking west of elevated C R I & P railway bridge (right) temporary trestle in center which has been converted for use as a one-way highway bridge while State Highway No. 9 bridge (far left) is being elevated."
Date: March 5, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History