Tank waste remediation system retrieval and disposal mission initial updated baseline summary (open access)

Tank waste remediation system retrieval and disposal mission initial updated baseline summary

This document provides a summary of the proposed Tank Waste Remediation System Retrieval and Disposal Mission Initial Updated Baseline (scope, schedule, and cost) developed to demonstrate the Tank Waste Remediation System contractor`s Readiness-to-Proceed in support of the Phase 1B mission.
Date: January 5, 1998
Creator: Swita, W.R.
Object Type: Report
System: The UNT Digital Library
Tank waste remediation system retrieval and disposal mission key enabling assumptions (open access)

Tank waste remediation system retrieval and disposal mission key enabling assumptions

An overall systems approach has been applied to develop action plans to support the retrieval and immobilization waste disposal mission. The review concluded that the systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. The review showed that since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farm structure and configurations and work scope and costs has been established itself as part of the culture within TWRS. An analysis of the programmatic, management and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, people and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and immobilized waste disposal mission requirements and evaluating the readiness of the TWRS contractor to supply waste feed to the private contractors in June 2OO2. The Phase 1 feed delivery requirements from the Private Contractor Request for Proposals were reviewed. Transfer piping routes were mapped out, existing systems were evaluated, and upgrade requirements were defined. Technical Basis Reviews were completed to define …
Date: January 5, 1998
Creator: Baldwin, J.H.
Object Type: Report
System: The UNT Digital Library