High Heat Program, Thermal Hydraulic Computer Models (open access)

High Heat Program, Thermal Hydraulic Computer Models

The purpose of this report is to describe the thermal hydraulic computer models, the computer model benchmarking and methodology to be used in performing the analysis necessary for the resolution of the high heat safety issue for Tank 241-C, -106.
Date: March 5, 1998
Creator: Ogden, D.M.
System: The UNT Digital Library
Performance requirements for the double-shell tank system: Phase 1 (open access)

Performance requirements for the double-shell tank system: Phase 1

This document establishes performance requirements for the double-shell tank system. These requirements, in turn, will be incorporated in the System Specification for the Double-Shell Tank System (Grenard and Claghorn 1998). This version of the document establishes requirements that are applicable to the first phase (Phase 1) of the Tank Waste Remediation System (TWRS) mission described in the TWRS Mission Analysis Report (Acree 1998). It does not specify requirements for either the Phase 2 mission or the double-shell tank system closure period.
Date: March 5, 1998
Creator: Claghorn, R.D.
System: The UNT Digital Library
High priority tank sampling and analysis report (open access)

High priority tank sampling and analysis report

In July 1993, the Defense Nuclear Facilities Safety Board (DNFSB) transmitted Recommendation 93-5 (Conway 1993) to the US Department of Energy (DOE). Recommendation 93-5 noted that there was insufficient tank waste technical information and the pace to obtain it was too slow to ensure that Hanford Site wastes could be safely stored, that associated operations could be conducted safely, and that future disposal data requirements could be met. In May 1996, the DOE issued Revision 1 of the Recommendation 93-5 Implementation Plan (DOE-RL 1996). The Implementation Plan revision presented a modified approach to achieve the original plan`s objectives. The approach concentrated on actions necessary to ensure that wastes can be safely stored, that operations can be safely conducted, and that timely characterization information for the tank waste Disposal Program could be obtained. The Implementation Plan proposed 28 High Priority tanks, which, if sampled and analyzed, were expected to provide information to answer questions regarding safety and disposal issues. The High Priority tank list was originally developed in Section 9.0 of the Tank Waste Characterization Basis (Brown et al. 1995) by integrating the needs of the various safety and disposal programs. The High Priority tank list represents a set of tanks …
Date: March 5, 1998
Creator: Brown, T.M.
System: The UNT Digital Library
Replacement cross-site transfer system project W-058 safety class upgrade summary report (open access)

Replacement cross-site transfer system project W-058 safety class upgrade summary report

This report evaluates the design of the replacement cross-site transfer system structures, systems, and components for safety related applications as defined in the Tank Waste Remediation Systems Basis for Interim Operations.
Date: March 5, 1998
Creator: Schlosser, R. L.
System: The UNT Digital Library