Process modifications 202-S building (open access)

Process modifications 202-S building

A scheme was proposed whereby the third and second uranium cycle salt wastes in the Redox plant are combined, stripped, evaporated, and then returned as scrub to the first (and possibly second) cycles as scrub, operating as a dual scrub column. It is the purpose of this report to study this proposed method of back-cycling, and to investigate other methods of reducing chemical and waste storage costs.
Date: May 5, 1953
Creator: Rohrmann, C. A. & Ludloy, J. O.
System: The UNT Digital Library