100-D unit purge (open access)

100-D unit purge

None
Date: August 5, 1945
Creator: Dahlen, P. A.
System: The UNT Digital Library
Coating of tubealloy slugs (open access)

Coating of tubealloy slugs

None
Date: August 5, 1944
Creator: Boller, E. R.
System: The UNT Digital Library
Events of importance for week ending August 3, 1949 (open access)

Events of importance for week ending August 3, 1949

The redox and pile operations are reported on. Construction in 100 (Pile), 200 (Separation), and 300 (Metal Fabrication) areas is described. General work in the Richland commercial areas and on the Southern Railroad connection is also described. Personnel information is disclosed.
Date: August 5, 1949
Creator: Schlemmer, F. C.
System: The UNT Digital Library
P Division monthly report, July 1949 (open access)

P Division monthly report, July 1949

The progress report discusses activities of the P Division for the month of July, 1949. The B and F piles operated at 275 megawatts and the D pile at 305 megawatts throughout the month except for outages listed under Area Activities. A total of 57.5 tons of metal, at an average concentration of 363 megawatt days/ton (MWD/ton) was discharged from the piles during the month. This included 41.9 tons of Class V (alpha-rolled, triple-dipped, completely transformed) metal at an average concentration of 397 MWD/ton which was discharged without difficulty. A portion of this material was inspected and appears to be satisfactory for exposures at this concentration.
Date: August 5, 1949
Creator: Lee, Edward P.
System: The UNT Digital Library