86,901 Matching Results

Results open in a new window/tab.

1.8.2.1.2 Site system engineering implementation Fiscal Year 1998 multi-year work plan (open access)

1.8.2.1.2 Site system engineering implementation Fiscal Year 1998 multi-year work plan

Manage the Site Systems Engineering process to provide a traceable, integrated, requirements-driven, and technically defensible baseline., Through the Site Integration Group, Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering`s primary interfaces are with the Project Direction Office and with the projects, as well as with the Planning organization.
Date: October 3, 1997
Creator: Ferguson, J. E.
Object Type: Report
System: The UNT Digital Library

E-1-Boardman (2-3-19)

Photograph of Apache FD Engine 1. Ford/Boardman pumper.
Date: February 3, 2019
Creator: unknown
Object Type: Photograph
System: The Gateway to Oklahoma History

E-1 Pioneer II pumper

Photograph of Guthrie FD Engine 1. Lime green American LaFrance Pioneer II series rig.
Date: November 3, 2017
Creator: unknown
Object Type: Photograph
System: The Gateway to Oklahoma History

1" Standard Drain Cock 300 Lbs. Pressure [Boiler]

Blueprint depicting technical details of Battleship Texas.
Date: July 3, 1930
Creator: unknown
Object Type: Technical Drawing
System: The Portal to Texas History
(2,2-Bipyridyl)bis(eta5-1,2,3,4,5-pentamethylcyclopentadienyl)Strontium(II) (open access)

(2,2-Bipyridyl)bis(eta5-1,2,3,4,5-pentamethylcyclopentadienyl)Strontium(II)

In the title compound, the Sr-N distances are 2.624 (3) and 2.676 (3) Angstroms. The Sr-centroid distances are 2.571 and 2.561 Angstroms. The N-C-C-N torsion angle in the bipyridine ligand is 2.2 (4){sup o}. Interestingly, the bipyridine ligand is tilted. The angle between the plane defined by Sr1, N1 and N2 and the plane defined by the 12 atoms of the bipyridine ligand is 10.7{sup o}.
Date: July 3, 2008
Creator: Kazhdan, Daniel; Kazhdan, Daniel; Hu, Yung-Jin; Kokai, Akos; Levi, Zerubba & Rozenel, Sergio
Object Type: Article
System: The UNT Digital Library
A 2.53 NEF 8-bit 10 kS/s 0.5 µm CMOS Neural Recording Read-Out Circuit with High Linearity for Neuromodulation Implants (open access)

A 2.53 NEF 8-bit 10 kS/s 0.5 µm CMOS Neural Recording Read-Out Circuit with High Linearity for Neuromodulation Implants

This article presents a power-efficient complementary metal-oxide-semiconductor (CMOS) neural signal-recording read-out circuit for multichannel neuromodulation implants.
Date: March 3, 2021
Creator: Tasneem, Nishat Tarannum & Mahbub, Ifana
Object Type: Article
System: The UNT Digital Library

E-2 (Q-32) (12-3-12)

Photograph of Norman FD E-2. American LaFrance quint.
Date: December 3, 2012
Creator: unknown
Object Type: Photograph
System: The Gateway to Oklahoma History

E-3 1951 ALF

Photograph of Guthrie FD E-3. A 1951 American LaFrance.
Date: November 3, 2017
Creator: unknown
Object Type: Photograph
System: The Gateway to Oklahoma History
The 4-County News Bulletin (Castroville, Tex.), Vol. 19, No. 26, Ed. 1 Monday, October 3, 1977 (open access)

The 4-County News Bulletin (Castroville, Tex.), Vol. 19, No. 26, Ed. 1 Monday, October 3, 1977

Weekly newspaper from Castroville, Texas that includes local, state, and national news along with extensive advertising.
Date: October 3, 1977
Creator: Schott, Bobbie
Object Type: Newspaper
System: The Portal to Texas History
The 4-County News Bulletin (Castroville, Tex.), Vol. 19, No. 52, Ed. 1 Monday, April 3, 1978 (open access)

The 4-County News Bulletin (Castroville, Tex.), Vol. 19, No. 52, Ed. 1 Monday, April 3, 1978

Weekly newspaper from Castroville, Texas that includes local, state, and national news along with extensive advertising.
Date: April 3, 1978
Creator: Schott, Bobbie
Object Type: Newspaper
System: The Portal to Texas History
The 4-County News Bulletin (Castroville, Tex.), Vol. 20, No. 13, Ed. 1 Monday, July 3, 1978 (open access)

The 4-County News Bulletin (Castroville, Tex.), Vol. 20, No. 13, Ed. 1 Monday, July 3, 1978

Weekly newspaper from Castroville, Texas that includes local, state, and national news along with extensive advertising.
Date: July 3, 1978
Creator: Schott, Bobbie
Object Type: Newspaper
System: The Portal to Texas History

5.5" low pressure valve

Blueprint depicting technical details of Battleship Texas.
Date: February 3, 1914
Creator: unknown
Object Type: Technical Drawing
System: The Portal to Texas History

5.5" low pressure valve

Blueprint depicting technical details of Battleship Texas.
Date: February 3, 1914
Creator: unknown
Object Type: Technical Drawing
System: The Portal to Texas History

.5",.75" X 1" Cylinder Relief Valves - American Steam Gauge & Valve Mfg. Co.

Blueprint depicting technical details of Battleship Texas.
Date: March 3, 1914
Creator: unknown
Object Type: Technical Drawing
System: The Portal to Texas History

5 new engines (12-3-1992)

None
Date: December 3, 1992
Creator: unknown
Object Type: Photograph
System: The Gateway to Oklahoma History

E-6 (6-3-13)

Photograph of Norman FD E-6.
Date: June 3, 2013
Creator: unknown
Object Type: Photograph
System: The Gateway to Oklahoma History

E-7 at sta. 2

Photograph of GFD E-7 at station 2.
Date: November 3, 2017
Creator: unknown
Object Type: Photograph
System: The Gateway to Oklahoma History
8(a) Program: The Importance of Effective Fraud Prevention Controls (open access)

8(a) Program: The Importance of Effective Fraud Prevention Controls

Testimony issued by the Government Accountability Office with an abstract that begins "This testimony discusses the results of our prior investigation of the Small Business Administration's (SBA) 8(a) Business Development Program. SBA's 8(a) program, named for a section of the Small Business Act, is a development program created to help small, disadvantaged businesses compete in the American economy and access the federal procurement market. To participate in the program, a firm must be certified as meeting several criteria, including: be a small business as defined by SBA; be unconditionally owned and controlled by one or more socially and economically disadvantaged individuals who are of good character and citizens of the United States; and show potential for success. Upon certification, firms can obtain federal contracts without competing fully and openly for the work. For example, agencies are permitted to enter into sole-source contracts after soliciting and negotiating with only one 8(a) company. They also can participate in restricted competitions for federal contracts, known as set-asides, open to only 8(a) companies. In March 2010, GAO issued two companion reports on the 8(a) program, one focused on internal control procedures and processes that SBA has implemented to ensure that only eligible firms participate …
Date: March 3, 2011
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library

8" Heavy Pressure Valve, Cast Steel (8" Auxiliary Steam Stop)

Blueprint depicting technical details of Battleship Texas.
Date: December 3, 1913
Creator: unknown
Object Type: Technical Drawing
System: The Portal to Texas History
9/11 Commission Report: Reorganization, Transformation, and Information Sharing (open access)

9/11 Commission Report: Reorganization, Transformation, and Information Sharing

Testimony issued by the Government Accountability Office with an abstract that begins "The sorrow, loss, anger, and resolve so evident immediately following the September 11, 2001, attacks have been combined in an effort to help assure that our country will never again be caught unprepared. As the 9/11 Commission notes, we are safer today but we are not safe, and much work remains. Although in today's world we can never be 100 percent secure, and we can never do everything everywhere, we concur with the Commission's conclusion that the American people should expect their government to do its very best. GAO's mission is to help the Congress improve the performance and ensure the accountability of the federal government for the benefit of the American people. GAO has been actively involved in improving government's performance in the critically important homeland security area both before and after the September 11 attacks. In its request, the House Committee on Government Reform have asked GAO to address two issues: the lack of effective information sharing and analysis and the need for executive branch reorganization in response to the 9/11 Commission recommendations. Further, the Committee has asked GAO to address how to remedy problems in …
Date: August 3, 2004
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library

9" low pressure valve

Blueprint depicting technical details of Battleship Texas.
Date: February 3, 1914
Creator: unknown
Object Type: Technical Drawing
System: The Portal to Texas History

10" auxilliary injection sea chest in engine room (port only)

Blueprint depicting technical details of Battleship Texas.
Date: February 3, 1914
Creator: unknown
Object Type: Technical Drawing
System: The Portal to Texas History

10" low pressure valve

Blueprint depicting technical details of Battleship Texas.
Date: February 3, 1914
Creator: unknown
Object Type: Technical Drawing
System: The Portal to Texas History
A 12 GHz RF Power Source for the CLIC Study (open access)

A 12 GHz RF Power Source for the CLIC Study

The CLIC RF frequency has been changed in 2008 from the initial 30 GHz to the European X-band 11.9942 GHz permitting beam independent power production using klystrons for CLIC accelerating structure testing. A design and fabrication contract for five klystrons at that frequency has been signed by different parties with SLAC. France (IRFU, CEA Saclay) is contributing a solid state modulator purchased in industry and specific 12 GHz RF network components to the CLIC study. RF pulses over 120 MW peak at 230 ns length will be obtained by using a novel SLED-I type pulse compression scheme designed and fabricated by IAP, Nizhny Novgorod, Russia. The X-band power test stand is being installed in the CLIC Test Facility CTF3 for independent structure and component testing in a bunker, but allowing, in a later stage, for powering RF components in the CTF3 beam lines. The design of the facility, results from commissioning of the RF power source and the expected performance of the Test Facility are reported.
Date: July 3, 2012
Creator: Schirm, Karl; Curt, Stephane; Dobert, Steffen; McMonagle, Gerard; Rossat, Ghislain; Syratchev, Igor et al.
Object Type: Article
System: The UNT Digital Library