Serial/Series Title
Month
Day
2 Matching Results
Results open in a new window/tab.
Results:
1 - 2 of
2
Decontamination of the KER Rupture Experiment Loop Test Series B - Tests No. 1 and 2
The first series tests in the KER-REP-1 loop proved that a fisssion product contaminated loop could be decontaminated to a safe level for contact maintenance. The second series of tests ere scheduled for a more thorough evaluation of these processes includes specific decontamination factors, process corrosion rates, loop activity reduction factors (loop decontamination factors), and any preferential decontamination which may be present.
Date:
November 2, 1959
Creator:
Weed, R. D.
System:
The UNT Digital Library
A Simple Telephone Telemeter
When following the performance of automatic and semi-automatic equipment that is left unattended for extended periods of time, it is often desirable to be able to check this equipment by remote means. A convenient vehicle for such a check is the telephone since nearly all locations have or can have a telephone extension installed. The check of the equipment may be made as simple or extensive as desired, with the outcome of the check represented by a relay condition, for example. The condition of the relay is then transmitted to the interrogator over the telephone line by means of the presence or absence of a tone.
Date:
November 2, 1959
Creator:
Ratcliffe, C. A.
System:
The UNT Digital Library