Month

Pacific Northwest National Laboratory Institutional Plan FY 2000-2004 (open access)

Pacific Northwest National Laboratory Institutional Plan FY 2000-2004

The Pacific Northwest National Laboratory Institutional Plan for FY 2000-2004 sets forth the laboratory's mission, roles, technical capabilities, and laboratory strategic plan. In the plan, major initiatives also are proposed and the transitioning initiatives are discussed. The Programmatic Strategy section details our strategic intent, roles, and research thrusts in each of the U.S. Department of Energy's mission areas. The Operations/Infrastructure Strategic Plan section includes information on the laboratory's human resources; environment, safety, and health management; safeguards and security; site and facilities management; information resources management; management practices and standards; and communications and trust.
Date: March 1, 2000
Creator: Pearson, Erik W.
System: The UNT Digital Library
Hanford Site Groundwater Monitoring for Fiscal Year 2000 (open access)

Hanford Site Groundwater Monitoring for Fiscal Year 2000

This report presents the results of groundwater and vadose zone monitoring and remediation for fiscal year 2000 on the U.S. Department of Energy's Hanford Site, Washington. The most extensive contaminant plumes are tritium, iodine-129, and nitrate, which all had multiple sources and are very mobile in groundwater. Carbon tetrachloride and associated organic constituents form a relatively large plume beneath the central part of the Site. Hexavalent chromium is present in smaller plumes beneath the reactor areas along the river and beneath the central part of the site. Strontium-90 exceeds standards beneath each of the reactor areas, and technetium-99 and uranium are present in the 200 Areas. RCRA groundwater monitoring continued during fiscal year 2000. Vadose zone monitoring, characterization, remediation, and several technical demonstrations were conducted in fiscal year 2000. Soil gas monitoring at the 618-11 burial ground provided a preliminary indication of the location of tritium in the vadose zone and in groundwater. Groundwater modeling efforts focused on 1) identifying and characterizing major uncertainties in the current conceptual model and 2) performing a transient inverse calibration of the existing site-wide model. Specific model applications were conducted in support of the Hanford Site carbon tetrachloride Innovative Treatment Remediation Technology; to support …
Date: March 1, 2001
Creator: Hartman, Mary J.; Morasch, Launa F. & Webber, William D.
System: The UNT Digital Library
Annual Report - FY 2000, Radioactive Waste Shipments to and from the Nevada Test Site, March 2001 (open access)

Annual Report - FY 2000, Radioactive Waste Shipments to and from the Nevada Test Site, March 2001

This document reports the low-level radioactive waste, mixed low-level radioactive waste, and Polychlorinated Biphenyl contaminated low-level waste transported to or from the Nevada Test Site during fiscal year 2000.
Date: March 1, 2001
Creator: U.S. Department of Energy, Nevada Operations Office
System: The UNT Digital Library