Transition Boiling Heat Transfer Program; Second Quarterly Progress Report, April - June 1963 (open access)

Transition Boiling Heat Transfer Program; Second Quarterly Progress Report, April - June 1963

Introduction: The Transition Boiling Heat Transfer Program is sponsored jointly by the USAEC and Euroatom and is being conducted by the General Electric Company. The work commenced on this program February 11, 1963. The objective of this program is to perform basic investigation and measurement of the transition boiling regime in high pressure bulk boiling water flows, with particular emphasis i the high range of steam qualities.
Date: July 1, 1963
Creator: Quinn, E. P.
System: The UNT Digital Library
High Power Density Development Project: Thirteenth Quarterly Progress Report, April-June 1963 (open access)

High Power Density Development Project: Thirteenth Quarterly Progress Report, April-June 1963

From introduction: "Development of nuclear reactor cores having high power density, long fuel life, and low fabrication costs is the objective of this program sponsored by the AEC."
Date: July 1, 1963
Creator: Holladay, R. L.
System: The UNT Digital Library
Nuclear Superheat Quarterly Project Report: First Quarter, July-September 1959 (open access)

Nuclear Superheat Quarterly Project Report: First Quarter, July-September 1959

From introduction: "The purpose of the report is to set forth the development philosophy, objectives and expected results of the AEC-GE Nuclear Superheat Project."
Date: December 1, 1959
Creator: U.S. Atomic Energy Commission
System: The UNT Digital Library
Nuclear Superheat Quarterly Project Report: Third Quarter, January-March 1960 (open access)

Nuclear Superheat Quarterly Project Report: Third Quarter, January-March 1960

From introduction: "This is the third of a series of quarterly reports which will cover the progress and results from the conceptual design, economic evaluations and research and development work performed by the General Electric Company as part of the Nuclear Superheat Project."
Date: July 1, 1960
Creator: Pennington, R. T.
System: The UNT Digital Library
Automatic Control of T7 Tanker Boiling Water Reactor Propulsion System: Preliminary Design and Economic Evaluation (open access)

Automatic Control of T7 Tanker Boiling Water Reactor Propulsion System: Preliminary Design and Economic Evaluation

From introduction: "This report sets forth the results of a technical and economic analysis of automatic propulsion system control as a possible design improvement in the direct cycle boiling water reactor propulsion system in a T7 tanker."
Date: September 1, 1960
Creator: U.S. Atomic Energy Commission
System: The UNT Digital Library
High Power Density Development Project: Third Quarterly Progress Report, October - December, 1960 (open access)

High Power Density Development Project: Third Quarterly Progress Report, October - December, 1960

From introduction: "Development of nuclear reactor cores having high power density, long fuel life, and low fabrication costs is the objective of this program sponsored by the AEC."
Date: January 1, 1961
Creator: Holland, L. K.
System: The UNT Digital Library
EVESR Nuclear Superheat Fuel Development Project: Third Quarterly Report, December 1962-February 1963 (open access)

EVESR Nuclear Superheat Fuel Development Project: Third Quarterly Report, December 1962-February 1963

Quarterly report describing progress on the EVESR Nuclear Superheat Fuel Development Project.
Date: March 1, 1963
Creator: Pennington, R. T.
System: The UNT Digital Library
Development Program for Increased Output in the Garigliano Nuclear Reactor. Quarterly Report No. 5 (open access)

Development Program for Increased Output in the Garigliano Nuclear Reactor. Quarterly Report No. 5

The United States and the European Atomic Energy Community (Euratom), on May 29, and June 18, 1958, signed an agreement which provides a basis for co-operation in programs for the advancement of the peaceful applications of atomic energy. The work described in this report represents the Joint U.S.-Euratom effort. The over-all development program is designed to obtain the test data and operating experience necessary to eventually realize a 50 percent increase in the output of the Garigliano Nuclear Power Station located at Sessa Aurunca (Campania, Italy). Two tasks are in progress: Task III-F involves the preparation of test specimens of reactor vessel material for irradiation; Task IV consists of the formulation of specification for a complete data logging and computer system.
Date: January 1, 1964
Creator: Sorlie, T.
System: The UNT Digital Library
Development Program for Increased Output in the Garigliano Nuclear Reactor. Quarterly Report No. 6 (open access)

Development Program for Increased Output in the Garigliano Nuclear Reactor. Quarterly Report No. 6

The United States and the European Atomic Energy Community (Euratom), on May 29, and June 18, 1958, signed an agreement which provides a basis for co-operation in programs for the advancement of the peaceful applications of atomic energy. The work described in this report represents the Joint U.S.-Euratom effort. The over-all development program is designed to obtain the test data and operating experience necessary to eventually realize a 50 percent increase in the output of the Garigliano Nuclear Power Station located at Sessa Aurunca (Campania, Italy). Two tasks are in progress: Task III-F involves the preparation of test specimens of reactor vessel material for irradiation; Task IV consists of the formulation of specification for a complete data logging and computer system.
Date: April 1, 1964
Creator: Howard, C. L.
System: The UNT Digital Library
Development Program for Increased Output in the Garigliano Nuclear Reactor. Quarterly Report No. 7 (open access)

Development Program for Increased Output in the Garigliano Nuclear Reactor. Quarterly Report No. 7

The United States and the European Atomic Energy Community (Euratom), on May 29, and June 18, 1958, signed an agreement which provides a basis for co-operation in programs for the advancement of the peaceful applications of atomic energy. The work described in this report represents the Joint U.S.-Euratom effort. The over-all development program is designed to obtain the test data and operating experience necessary to eventually realize a 50 percent increase in the output of the Garigliano Nuclear Power Station located at Sessa Aurunca (Campania, Italy). One task is in progress: Task I - Data Logging and Computer System. The work on the other tasks is being planned and initiated.
Date: July 1, 1964
Creator: Howard, C. L.
System: The UNT Digital Library
High Power Density Development Project: Fifteenth Quarterly Progress Report, October-December 1963 (open access)

High Power Density Development Project: Fifteenth Quarterly Progress Report, October-December 1963

Development of nuclear reactor cores having high power density, long fuel life, and low fabrication costs is the objective of this program sponsored by the AEC. Five tasks are in progress: (1) Task 1A-High Power Density Fuel Development. All fuel irradiation has been terminated with the final shutdown of the VBWR. The high burnup average achieved by a single assembly in the group is 10,000 MWD/T (assembly 1F). Twenty-one of the original 24 assemblies have failed or are suspected of failure. Profilometer tests rung on HPD assembly 2E, Rod B, indicate that localized clad deformation occurs during operation. (2) Task 1B-Fuel Fabrication Development. Assembly. All fuel irradiation has been terminated with the final shutdown of the VBWR. The highest average burnup achieved by a single assembly in the group was assembly 4S with 8400 MWD/T. All assemblies in the group have failed or are suspected of failure. The Phase I developmental fuel continues to be irradiated in the Big rock Point reactor with the lead assembly having reached 1500 MWD/T. Fifteen phase II developmental assemblies are being construction for insertion at Big Rock Point in March. Engineering is underway to provide one instrumented assembly probe and two spare flowmeters for …
Date: January 1, 1964
Creator: Holladay, R. L.
System: The UNT Digital Library
High Power Density Development Project (Contract Pending) Advance Requisition 474-49976 - Second Quarterly Progress Report, July-September, 1960 (open access)

High Power Density Development Project (Contract Pending) Advance Requisition 474-49976 - Second Quarterly Progress Report, July-September, 1960

Development of nuclear reactor cores having high power density, long fuel life, and low fabrication costs is the objective of this program sponsored by the AEC. It will be achieved by extensive development and testing carried out in conjunction with the design, construction and operation of the Big Rock Point plant of the Consumers Power Company in Michigan. This second quarterly report describes the progress achieved from July through September 1960.
Date: October 1, 1960
Creator: Holland, L. K.
System: The UNT Digital Library
Preliminary Hazards Summary Report For The Vallecitos Superheat Reactor (open access)

Preliminary Hazards Summary Report For The Vallecitos Superheat Reactor

This Preliminary Hazards Summary Report has been prepared for submission to the United States Atomic Energy Commission in compliance with Part 50 of the regulations governing the licensing of production or utilization facilities, pursuant to the Atomic Energy Act of 1954, as amended, and contains the general information required by 10 CFR 50.34.
Date: February 1, 1961
Creator: General Electric Company
System: The UNT Digital Library
High Power Density Development Project Eighth Quarterly Progress Report January - March 1962 (open access)

High Power Density Development Project Eighth Quarterly Progress Report January - March 1962

During the eighth quarter the instrumented assemblies were removed from VBWR and examined for effects of the exposure to reactor conditions. Also during this period the Big Rock developmental fuel assembly design was completed and a topical report was issued. A summary of progress by task is presented here.
Date: April 1, 1962
Creator: Holladay, R. L.
System: The UNT Digital Library
Accurate Nuclear Fuel Burnup Analyses: Third Quarterly Progress Report June - August, 1962 (open access)

Accurate Nuclear Fuel Burnup Analyses: Third Quarterly Progress Report June - August, 1962

Work has continued on the development of accurate nuclear fuel burnup analysis. Work performed by the third quarter of 1962 is summarized.
Date: October 1, 1962
Creator: Rider, B. F.
System: The UNT Digital Library
High Power Density Development Project Tenth Quarterly Progress Report July-September 1962 (open access)

High Power Density Development Project Tenth Quarterly Progress Report July-September 1962

The Big Rock Point Reactor of the Consumers Power Company went critical for the first time on September 27, 1962. Summarized here are objectives and accomplishments of the pre-operational period as well as an indication of work scope remaining.
Date: October 1, 1962
Creator: Holladay, R. L.
System: The UNT Digital Library
Accurate Nuclear Fuel Burnup Analyses: Fourth Quarterly Progress Report September-November, 1962 (open access)

Accurate Nuclear Fuel Burnup Analyses: Fourth Quarterly Progress Report September-November, 1962

Work has continued on the development of accurate nuclear fuel burnup analysis. Work performed during the fourth quarter is summarized here.
Date: December 1, 1962
Creator: Rider, B. F.; Ruiz, C. P. & Peterson, J. P.
System: The UNT Digital Library