Two-Phase Pressure Losses Quarterly Progress Report: Eighth Quarter, November 12, 1963 - February 11, 1964 (open access)

Two-Phase Pressure Losses Quarterly Progress Report: Eighth Quarter, November 12, 1963 - February 11, 1964

Technical report describing that voids were measured in a ½-inch by 1-3/4-inch channel with the S-1 insert (B(0)/B(1) = 0.4, L(0) = 0.1 inch), at 2 inches ahead of the insert (position A), ½-inch past the insert (position B), 5 inches past (position C), and 12 inches past (position D). The conditions were: P – 1000 psia, G = 1.00 x 10(6) lb/h-ft(2), and x = 18.8 percent. Average void and void distribution at position A are the same as for flow in a straight channel. Void distribution at position B shows that the stagnation region downstream of the inserts contains a high fraction of voids. Average void and void distribution at positions C and d show that the two-phase mixture becomes strongly mixed (homogenized) as a result of passing through he contraction-expansion inserts. Distribution at position D approaches the distribution at position A; i.e., the straight channel distribution.
Date: March 1, 1964
Creator: Janssen, E. (Engineer) & Kervinen, J. A.
System: The UNT Digital Library
High Power Density Development Project: Sixteenth Quarterly Progress Report, January-March 1964 (open access)

High Power Density Development Project: Sixteenth Quarterly Progress Report, January-March 1964

Development of nuclear reactor cores having high power density, long fuel life, and low fabrication costs is the objective of this program sponsored by the AEC. Five tasks are in progress: (1) Task 1A-High Power Density Fuel Development, (2) Task 1B-Fuel Fabrication Development. Assembly, (3) Task II-Stability, Heat Transfer and Fluid Flow, (4) Task III-Physics Development, and (5) Task IV-Co-Ordination and Test Planning.
Date: April 1, 1964
Creator: Holladay, R. L.
System: The UNT Digital Library
Accurate Nuclear Fuel Burnup Analyses; Eighth Quarterly Progress Report, (September - November 1963) (open access)

Accurate Nuclear Fuel Burnup Analyses; Eighth Quarterly Progress Report, (September - November 1963)

The objective of the Accurate Nuclear Fuel Burnup Analyses program is to develop more accurate methods for burnup analysis for general use than the current method of analysis of Ca-137 or Sr-90. The program will require from three to five years of effort.
Date: December 1, 1963
Creator: Rider, B. F.; Ruiz, C. P.; Luke, P. S., Jr.; Peterson, J. P., Jr. & Smith, F. R.
System: The UNT Digital Library
Accurate Nuclear Fuel Burnup Analyses; Ninth Quarterly Progress Report, (December 1963 - February 1964) (open access)

Accurate Nuclear Fuel Burnup Analyses; Ninth Quarterly Progress Report, (December 1963 - February 1964)

The objective of the Accurate Nuclear Fuel Burnup Analyses program is to develop more accurate methods for burnup analysis for general use than the current method of analysis of Ca-137 or Sr-90. The program will require from three to five years of effort.
Date: March 1, 1964
Creator: Rider, B. F.; Peterson, J. P., Jr.; Ruiz, C. P. & Smith, F. R.
System: The UNT Digital Library
Accurate Nuclear Fuel Burnup Analysis Quarterly Progress Report: Sixth Quarter, March 1963 - May 1963 (open access)

Accurate Nuclear Fuel Burnup Analysis Quarterly Progress Report: Sixth Quarter, March 1963 - May 1963

Quarterly progress report on Accurate Nuclear Fuel Burnup Analysis project.
Date: June 1, 1963
Creator: Rider, B. F.; Ruiz, C. P.; Peterson, J. P., Jr. & Luke, P. S., Jr.
System: The UNT Digital Library
Maritime Loop Irradiation Program, S-I-5-B-M Fuel Irradiation Water Chemistry, Final Report (open access)

Maritime Loop Irradiation Program, S-I-5-B-M Fuel Irradiation Water Chemistry, Final Report

Introduction: The purpose of this technical report is to review the water chemistry methods and equipment developed for use with the Maritime Loop Irradiation Program conducted in the General Electric Test Reactor (GETR) from December 2, 1960 to July 19, 1962. Special emphasis is given to areas having general application to other high purity water systems. The Appendix includes a discussion of specific conductivity and pH in high purity water systems. A major section of this report is devoted to a review of gross activity levels on coupons of two different surface finishes exposed in the loop coolant system for various time intervals. A major objective of the chemistry program was to select or develop analytical methods such that the analyses could be performed at the loop location by technical personnel who normally operate the loop. By this means, frequent samples were obtained and analyzed directly thus providing close monitoring and control of the loop water chemistry at minimum expense.
Date: August 1, 1963
Creator: Danielson, D. W.; Gilbert, R. S. & Panter, G. E.
System: The UNT Digital Library
High Power Density Development Project: Fifteenth Quarterly Progress Report, October-December 1963 (open access)

High Power Density Development Project: Fifteenth Quarterly Progress Report, October-December 1963

Development of nuclear reactor cores having high power density, long fuel life, and low fabrication costs is the objective of this program sponsored by the AEC. Five tasks are in progress: (1) Task 1A-High Power Density Fuel Development. All fuel irradiation has been terminated with the final shutdown of the VBWR. The high burnup average achieved by a single assembly in the group is 10,000 MWD/T (assembly 1F). Twenty-one of the original 24 assemblies have failed or are suspected of failure. Profilometer tests rung on HPD assembly 2E, Rod B, indicate that localized clad deformation occurs during operation. (2) Task 1B-Fuel Fabrication Development. Assembly. All fuel irradiation has been terminated with the final shutdown of the VBWR. The highest average burnup achieved by a single assembly in the group was assembly 4S with 8400 MWD/T. All assemblies in the group have failed or are suspected of failure. The Phase I developmental fuel continues to be irradiated in the Big rock Point reactor with the lead assembly having reached 1500 MWD/T. Fifteen phase II developmental assemblies are being construction for insertion at Big Rock Point in March. Engineering is underway to provide one instrumented assembly probe and two spare flowmeters for …
Date: January 1, 1964
Creator: Holladay, R. L.
System: The UNT Digital Library