33 Matching Results

Results open in a new window/tab.

Accurate Nuclear Fuel Burnup Analyses: Fourth Quarterly Progress Report September-November, 1962 (open access)

Accurate Nuclear Fuel Burnup Analyses: Fourth Quarterly Progress Report September-November, 1962

Work has continued on the development of accurate nuclear fuel burnup analysis. Work performed during the fourth quarter is summarized here.
Date: December 1, 1962
Creator: Rider, B. F.; Ruiz, C. P. & Peterson, J. P.
System: The UNT Digital Library
High Power Density Development Project Tenth Quarterly Progress Report July-September 1962 (open access)

High Power Density Development Project Tenth Quarterly Progress Report July-September 1962

The Big Rock Point Reactor of the Consumers Power Company went critical for the first time on September 27, 1962. Summarized here are objectives and accomplishments of the pre-operational period as well as an indication of work scope remaining.
Date: October 1, 1962
Creator: Holladay, R. L.
System: The UNT Digital Library
Accurate Nuclear Fuel Burnup Analyses: Third Quarterly Progress Report June - August, 1962 (open access)

Accurate Nuclear Fuel Burnup Analyses: Third Quarterly Progress Report June - August, 1962

Work has continued on the development of accurate nuclear fuel burnup analysis. Work performed by the third quarter of 1962 is summarized.
Date: October 1, 1962
Creator: Rider, B. F.
System: The UNT Digital Library
High Power Density Development Project Eighth Quarterly Progress Report January - March 1962 (open access)

High Power Density Development Project Eighth Quarterly Progress Report January - March 1962

During the eighth quarter the instrumented assemblies were removed from VBWR and examined for effects of the exposure to reactor conditions. Also during this period the Big Rock developmental fuel assembly design was completed and a topical report was issued. A summary of progress by task is presented here.
Date: April 1, 1962
Creator: Holladay, R. L.
System: The UNT Digital Library
High Performance UO2 Program Fourth Quarterly Progress Report (open access)

High Performance UO2 Program Fourth Quarterly Progress Report

This phase of the program is concerned with irradiation of fuel assemblies to determine central temperature limitations.
Date: April 1, 1962
Creator: Weidenbaum, B.
System: The UNT Digital Library
High Performance UO2 Program Quarterly Progress Report Number 2: July-September 1961 (open access)

High Performance UO2 Program Quarterly Progress Report Number 2: July-September 1961

The primary purpose of this joint USAEC-Euratom program is to obtain a better understanding if the maximum achievable operating characteristics of UO2 as a reactor fuel. During the program work will be performed in two areas that have been of concern to reactor core designers for a long time, namely fission gas release and central melting in fuel rods.
Date: October 1, 1961
Creator: Weidenbaum, B.
System: The UNT Digital Library
High Performance UO2 Program First Quarterly Progress Report: April-June 1961 (open access)

High Performance UO2 Program First Quarterly Progress Report: April-June 1961

A better understanding of the maximum operating characteristics that can be achieved with the use of UO2 as a reactor fuel is the primary purpose of this program for Euratom and the Atomic Energy Commission. During this program work will be undertaken in two areas that have been of concern to the reactor core designer for a long time, viz. fission gas release and central melting in fuel rods.
Date: July 1, 1961
Creator: Weidenbaum, B
System: The UNT Digital Library
High Power Density Development Project Fourth Quarterly Progress Report : January - March 1961 (open access)

High Power Density Development Project Fourth Quarterly Progress Report : January - March 1961

The fourth quarter of effort applied to the Consumers R & D Program is summarized in the following: high power density fuel development, fuel fabrication development, stability, heat transfer and fluid flow, physics development, operation planning and test coordination.
Date: April 1, 1961
Creator: Holland, L. K.
System: The UNT Digital Library
Preliminary Hazards Summary Report For The Vallecitos Superheat Reactor (open access)

Preliminary Hazards Summary Report For The Vallecitos Superheat Reactor

This Preliminary Hazards Summary Report has been prepared for submission to the United States Atomic Energy Commission in compliance with Part 50 of the regulations governing the licensing of production or utilization facilities, pursuant to the Atomic Energy Act of 1954, as amended, and contains the general information required by 10 CFR 50.34.
Date: February 1, 1961
Creator: General Electric Company
System: The UNT Digital Library
High Power Density Development Project (Contract Pending) Advance Requisition 474-49976 - Second Quarterly Progress Report, July-September, 1960 (open access)

High Power Density Development Project (Contract Pending) Advance Requisition 474-49976 - Second Quarterly Progress Report, July-September, 1960

Development of nuclear reactor cores having high power density, long fuel life, and low fabrication costs is the objective of this program sponsored by the AEC. It will be achieved by extensive development and testing carried out in conjunction with the design, construction and operation of the Big Rock Point plant of the Consumers Power Company in Michigan. This second quarterly report describes the progress achieved from July through September 1960.
Date: October 1, 1960
Creator: Holland, L. K.
System: The UNT Digital Library
Transition Boiling Heat Transfer Program; Fifth Quarterly Progress Report, January - March 1964 (open access)

Transition Boiling Heat Transfer Program; Fifth Quarterly Progress Report, January - March 1964

Summary: Tests with the two-rod assembly were performed with liquid film trippers attached to the unheated wall, and a variation in rod spacing. Experimental data and improved high-speed motion pictures have been obtained of transition boiling behavior. The changes of the local heat transfer process between nucleate and film boiling can be readily distinguished i the motion pictures. Observational test performed with very short fins on the heated surface resulted in essentially eliminating transition boiling temperature fluctuations and doubling the film boiling coefficient. These gains were attained without reduction of the critical heat flux
Date: April 1, 1964
Creator: Quinn, E. P.
System: The UNT Digital Library
Transition Boiling Heat Transfer Program; Fourth Quarterly Progress Report, October - December 1963 (open access)

Transition Boiling Heat Transfer Program; Fourth Quarterly Progress Report, October - December 1963

Summary: Heat transfer tests employing the two-rod test section without film tripping devices have been completed. Representations defining critical heat flux, transition boiling and film boiling behavior at high pressures and over a steam quality range of 25 to 90 percent are shown. Fabrication of a new observational test section was completed and initial test results with high-speed motion pictures were obtained. A test loop instability which was found to affect transition boiling behavior was detected and partially eliminated.
Date: January 1, 1964
Creator: Quinn, E. P.
System: The UNT Digital Library
Transition Boiling Heat Transfer Program; Sixth Quarterly Progress Report, April - June 1964 (open access)

Transition Boiling Heat Transfer Program; Sixth Quarterly Progress Report, April - June 1964

Summary: Transition boiling data was taken with an improved flow loop, to explore the influence of loop characteristics on rod temperature fluctuations the transition region was found to be much smaller than for comparable conditions with a different loop. Also the amplitude, and frequency of the temperature oscillations, were significantly less than before. These results indicate that loop characteristic and flow disturbance parameters play a prominent part in governing the transition temperature fluctuations. Additional two-rod transition boiling data are presented. The results include data taken at high wall temperature levels during a demonstration test at low steam qualities, and the effect of a change in rod spacing on heat transfer performance.
Date: July 1, 1964
Creator: Quinn, E. P.
System: The UNT Digital Library
Two-Phase Pressure Losses Quarterly Progress Report: Eighth Quarter, November 12, 1963 - February 11, 1964 (open access)

Two-Phase Pressure Losses Quarterly Progress Report: Eighth Quarter, November 12, 1963 - February 11, 1964

Technical report describing that voids were measured in a ½-inch by 1-3/4-inch channel with the S-1 insert (B(0)/B(1) = 0.4, L(0) = 0.1 inch), at 2 inches ahead of the insert (position A), ½-inch past the insert (position B), 5 inches past (position C), and 12 inches past (position D). The conditions were: P – 1000 psia, G = 1.00 x 10(6) lb/h-ft(2), and x = 18.8 percent. Average void and void distribution at position A are the same as for flow in a straight channel. Void distribution at position B shows that the stagnation region downstream of the inserts contains a high fraction of voids. Average void and void distribution at positions C and d show that the two-phase mixture becomes strongly mixed (homogenized) as a result of passing through he contraction-expansion inserts. Distribution at position D approaches the distribution at position A; i.e., the straight channel distribution.
Date: March 1, 1964
Creator: Janssen, E. (Engineer) & Kervinen, J. A.
System: The UNT Digital Library
High Power Density Development Project: Sixteenth Quarterly Progress Report, January-March 1964 (open access)

High Power Density Development Project: Sixteenth Quarterly Progress Report, January-March 1964

Development of nuclear reactor cores having high power density, long fuel life, and low fabrication costs is the objective of this program sponsored by the AEC. Five tasks are in progress: (1) Task 1A-High Power Density Fuel Development, (2) Task 1B-Fuel Fabrication Development. Assembly, (3) Task II-Stability, Heat Transfer and Fluid Flow, (4) Task III-Physics Development, and (5) Task IV-Co-Ordination and Test Planning.
Date: April 1, 1964
Creator: Holladay, R. L.
System: The UNT Digital Library
Accurate Nuclear Fuel Burnup Analyses; Eighth Quarterly Progress Report, (September - November 1963) (open access)

Accurate Nuclear Fuel Burnup Analyses; Eighth Quarterly Progress Report, (September - November 1963)

The objective of the Accurate Nuclear Fuel Burnup Analyses program is to develop more accurate methods for burnup analysis for general use than the current method of analysis of Ca-137 or Sr-90. The program will require from three to five years of effort.
Date: December 1, 1963
Creator: Rider, B. F.; Ruiz, C. P.; Luke, P. S., Jr.; Peterson, J. P., Jr. & Smith, F. R.
System: The UNT Digital Library
Accurate Nuclear Fuel Burnup Analyses; Ninth Quarterly Progress Report, (December 1963 - February 1964) (open access)

Accurate Nuclear Fuel Burnup Analyses; Ninth Quarterly Progress Report, (December 1963 - February 1964)

The objective of the Accurate Nuclear Fuel Burnup Analyses program is to develop more accurate methods for burnup analysis for general use than the current method of analysis of Ca-137 or Sr-90. The program will require from three to five years of effort.
Date: March 1, 1964
Creator: Rider, B. F.; Peterson, J. P., Jr.; Ruiz, C. P. & Smith, F. R.
System: The UNT Digital Library
Accurate Nuclear Fuel Burnup Analysis Quarterly Progress Report: Seventh Quarter, June 1963 - August 1963 (open access)

Accurate Nuclear Fuel Burnup Analysis Quarterly Progress Report: Seventh Quarter, June 1963 - August 1963

Quarterly progress report on Accurate Nuclear Fuel Burnup Analysis project.
Date: September 1, 1963
Creator: Rider, B. F.; Ruiz, C. P.; Peterson, J. P., Jr.; Luke, P. S., Jr. & Smith, F. R.
System: The UNT Digital Library
Two-Phase Pressure Losses Quarterly Progress Report: Sixth Quarter, May 12, 1963 - August 12, 1963 (open access)

Two-Phase Pressure Losses Quarterly Progress Report: Sixth Quarter, May 12, 1963 - August 12, 1963

Technical report describing that the pressure drops along 3/4-inch, 1-inch, and 1-1/4 inch straight pipes and across three contraction-expansion inserts in a 1-inch pipe have been measured under both single- and two-phase flow conditions. Pressure was varied from 600 to 1400 psia, flow from 0.25 x 10(6) to 1.66 x 10(6) lb/hr ft, and quality from zero to 90 percent. The single-phase pipe friction factor agrees with the Moody value for smooth pipe. The two-phase friction for horizontal flow shows no size effect in the range of pipe sizes from 3/4 inch to 1-1/4 inch. The values lie below the Martinelli curve at the lower qualities (x<0.6), but at high qualities tend to be above the Martinelli curve. The single-phase loss coefficient for the three contraction-expansion inserts show very little Reynolds number effect in the range of channel Reynolds numbers from 3 x 10(4) to 5 x 10(5). The two-phase data for insert number 1 has not yet been reduced. The two-phase loss for insert numbers 2 and 3 lies generally below the loss prediction based on a homogeneous flow model. The two-phase loss for insert number 2 shows excellent agreement with the corresponding loss for the S-1 insert in …
Date: September 1, 1963
Creator: Janssen, E. (Engineer) & Kervinen, J. A.
System: The UNT Digital Library
Specific Zirconium Alloy Design Program Quarterly Progress Report: Sixth Quarter, July - September, 1963 (open access)

Specific Zirconium Alloy Design Program Quarterly Progress Report: Sixth Quarter, July - September, 1963

Summary: Fundamental studies in support of the alloy design work are complete except for the experimental determination of the diffusion of oxygen in alloy-doped non-stoichiometric ZrO2. Over 100 oxidation runs have now been made on samples of ZrO2 doped with 1 mole percent of the oxides of Al, Y, Fe, Cr, and Ni. The first round testing of 31 alloys is now essentially complete. Analysis of the steam corrosion rate and hydriding raw data taken at 300, 400, and 500 degrees C indicates that Zr-Cr and Zr-Cu-Fe alloys show the most promise for development for service in steam over the entire temperature range 300-500 degrees C. Maximum resistance to corrosion hydrogen embrittlement requires high initial ductility and thus low, perhaps less than ~2.5 a/o total alloy content. For any composition, susceptibility to hydrogen embrittlement depends on crystallographic texture of the component; under certain circumstances hydrogen embrittlement may be high anisotropic. The second-round testing of 10 selected Zr-Cr and Zr-Cu base alloys is now about 50% complete. Three alternate fabrication schedules were evaluated; and the preliminary results indicate that the Zr-Cu alloy tested is less sensitive to heat treatment than is the Zr-Cr alloy tested. Raising the final alpha annealing temperature …
Date: October 1, 1963
Creator: Klepfer, H. H.; Jaech, John L.; Douglass, D. L. (David Leslie), 1931-; Blood, R. E. & Perrine, H. E.
System: The UNT Digital Library
Development Program for Increased Output in the Garigliano Nuclear Reactor. Quarterly Report No. 4 (open access)

Development Program for Increased Output in the Garigliano Nuclear Reactor. Quarterly Report No. 4

The United States and the European Atomic Energy Community (Euratom), on May 29, and June 18, 1958, signed an agreement which provides a basis for co-operation in programs for the advancement of the peaceful applications of atomic energy. The work described in this report represents the Joint U.S.-Euratom effort. The over-all development program is designed to obtain the test data and operating experience necessary to eventually realize a 50 percent increase in the output of the Garigliano Nuclear Power Station located at Sessa Aurunca (Campania, Italy). Two tasks are in progress: Task III-F involves the preparation of test specimens of reactor vessel material for irradiation; Task IV consists of the formulation of specification for a complete data logging and computer system.
Date: October 1, 1963
Creator: Sorlie, T.
System: The UNT Digital Library
Transition Boiling Heat Transfer Program; Third Quarterly Progress Report, July - September 1963 (open access)

Transition Boiling Heat Transfer Program; Third Quarterly Progress Report, July - September 1963

Summary: Initial critical heat flux, transition boiling temperature fluctuation, and film boiling coefficient data have been obtained on a two-rod cluster assembly at 1000 psia and 25 to 90 percent steam qualities. A representation showing the range of critical heat flux data is presented. Typical temperature recordings which indicate transition and film boiling behavior are shown. Fabrication of a new high pressure observational test section is nearly complete. An optical table and illumination system has been build and operationally tested for photographic use on the new observational section.
Date: October 1, 1963
Creator: Quinn, E. P.
System: The UNT Digital Library
Two-Phase Pressure Losses Quarterly Progress Report: Fifth Quarter, February 12, 1963 - May 12, 1963 (open access)

Two-Phase Pressure Losses Quarterly Progress Report: Fifth Quarter, February 12, 1963 - May 12, 1963

Technical report describing that void measurements were made in the 1/2-inch by 1-3/4-inch rectangular channel, for both flow up and flow down, at pressures of 600, 1000, and 1400 psia, and at various flows and quantities. Results at 1000 psia and 20 percent quality show that for the lowest flow both the void distribution and the average void are much different for flow down than for flow up, the void fraction for flow down being much higher. However, when the flow is increased both the void distribution and average void for flow down tend to approach the corresponding values for flow up. At 1000 psia, both flow up and flow down, the void fraction for 5 percent quality increases gradually from the wall to the center of the channel, and peaks at the center. At 20 percent quality, the void fraction increases abruptly from the wall and tends to be constant over the middle 65 percent of the channel. the void fraction for flow down is always greater than for flow up, other things being equal.
Date: June 1, 1963
Creator: Janssen, E. (Engineer) & Kervinen, J. A.
System: The UNT Digital Library
Accurate Nuclear Fuel Burnup Analysis Quarterly Progress Report: Sixth Quarter, March 1963 - May 1963 (open access)

Accurate Nuclear Fuel Burnup Analysis Quarterly Progress Report: Sixth Quarter, March 1963 - May 1963

Quarterly progress report on Accurate Nuclear Fuel Burnup Analysis project.
Date: June 1, 1963
Creator: Rider, B. F.; Ruiz, C. P.; Peterson, J. P., Jr. & Luke, P. S., Jr.
System: The UNT Digital Library