10 Matching Results

Results open in a new window/tab.

Transition Boiling Heat Transfer Program; Fifth Quarterly Progress Report, January - March 1964 (open access)

Transition Boiling Heat Transfer Program; Fifth Quarterly Progress Report, January - March 1964

Summary: Tests with the two-rod assembly were performed with liquid film trippers attached to the unheated wall, and a variation in rod spacing. Experimental data and improved high-speed motion pictures have been obtained of transition boiling behavior. The changes of the local heat transfer process between nucleate and film boiling can be readily distinguished i the motion pictures. Observational test performed with very short fins on the heated surface resulted in essentially eliminating transition boiling temperature fluctuations and doubling the film boiling coefficient. These gains were attained without reduction of the critical heat flux
Date: April 1, 1964
Creator: Quinn, E. P.
System: The UNT Digital Library
Transition Boiling Heat Transfer Program; Fourth Quarterly Progress Report, October - December 1963 (open access)

Transition Boiling Heat Transfer Program; Fourth Quarterly Progress Report, October - December 1963

Summary: Heat transfer tests employing the two-rod test section without film tripping devices have been completed. Representations defining critical heat flux, transition boiling and film boiling behavior at high pressures and over a steam quality range of 25 to 90 percent are shown. Fabrication of a new observational test section was completed and initial test results with high-speed motion pictures were obtained. A test loop instability which was found to affect transition boiling behavior was detected and partially eliminated.
Date: January 1, 1964
Creator: Quinn, E. P.
System: The UNT Digital Library
Transition Boiling Heat Transfer Program; Sixth Quarterly Progress Report, April - June 1964 (open access)

Transition Boiling Heat Transfer Program; Sixth Quarterly Progress Report, April - June 1964

Summary: Transition boiling data was taken with an improved flow loop, to explore the influence of loop characteristics on rod temperature fluctuations the transition region was found to be much smaller than for comparable conditions with a different loop. Also the amplitude, and frequency of the temperature oscillations, were significantly less than before. These results indicate that loop characteristic and flow disturbance parameters play a prominent part in governing the transition temperature fluctuations. Additional two-rod transition boiling data are presented. The results include data taken at high wall temperature levels during a demonstration test at low steam qualities, and the effect of a change in rod spacing on heat transfer performance.
Date: July 1, 1964
Creator: Quinn, E. P.
System: The UNT Digital Library
Two-Phase Pressure Losses Quarterly Progress Report: Eighth Quarter, November 12, 1963 - February 11, 1964 (open access)

Two-Phase Pressure Losses Quarterly Progress Report: Eighth Quarter, November 12, 1963 - February 11, 1964

Technical report describing that voids were measured in a ½-inch by 1-3/4-inch channel with the S-1 insert (B(0)/B(1) = 0.4, L(0) = 0.1 inch), at 2 inches ahead of the insert (position A), ½-inch past the insert (position B), 5 inches past (position C), and 12 inches past (position D). The conditions were: P – 1000 psia, G = 1.00 x 10(6) lb/h-ft(2), and x = 18.8 percent. Average void and void distribution at position A are the same as for flow in a straight channel. Void distribution at position B shows that the stagnation region downstream of the inserts contains a high fraction of voids. Average void and void distribution at positions C and d show that the two-phase mixture becomes strongly mixed (homogenized) as a result of passing through he contraction-expansion inserts. Distribution at position D approaches the distribution at position A; i.e., the straight channel distribution.
Date: March 1, 1964
Creator: Janssen, E. (Engineer) & Kervinen, J. A.
System: The UNT Digital Library
High Power Density Development Project: Sixteenth Quarterly Progress Report, January-March 1964 (open access)

High Power Density Development Project: Sixteenth Quarterly Progress Report, January-March 1964

Development of nuclear reactor cores having high power density, long fuel life, and low fabrication costs is the objective of this program sponsored by the AEC. Five tasks are in progress: (1) Task 1A-High Power Density Fuel Development, (2) Task 1B-Fuel Fabrication Development. Assembly, (3) Task II-Stability, Heat Transfer and Fluid Flow, (4) Task III-Physics Development, and (5) Task IV-Co-Ordination and Test Planning.
Date: April 1, 1964
Creator: Holladay, R. L.
System: The UNT Digital Library
Accurate Nuclear Fuel Burnup Analyses; Ninth Quarterly Progress Report, (December 1963 - February 1964) (open access)

Accurate Nuclear Fuel Burnup Analyses; Ninth Quarterly Progress Report, (December 1963 - February 1964)

The objective of the Accurate Nuclear Fuel Burnup Analyses program is to develop more accurate methods for burnup analysis for general use than the current method of analysis of Ca-137 or Sr-90. The program will require from three to five years of effort.
Date: March 1, 1964
Creator: Rider, B. F.; Peterson, J. P., Jr.; Ruiz, C. P. & Smith, F. R.
System: The UNT Digital Library
Development Program for Increased Output in the Garigliano Nuclear Reactor. Quarterly Report No. 5 (open access)

Development Program for Increased Output in the Garigliano Nuclear Reactor. Quarterly Report No. 5

The United States and the European Atomic Energy Community (Euratom), on May 29, and June 18, 1958, signed an agreement which provides a basis for co-operation in programs for the advancement of the peaceful applications of atomic energy. The work described in this report represents the Joint U.S.-Euratom effort. The over-all development program is designed to obtain the test data and operating experience necessary to eventually realize a 50 percent increase in the output of the Garigliano Nuclear Power Station located at Sessa Aurunca (Campania, Italy). Two tasks are in progress: Task III-F involves the preparation of test specimens of reactor vessel material for irradiation; Task IV consists of the formulation of specification for a complete data logging and computer system.
Date: January 1, 1964
Creator: Sorlie, T.
System: The UNT Digital Library
Development Program for Increased Output in the Garigliano Nuclear Reactor. Quarterly Report No. 6 (open access)

Development Program for Increased Output in the Garigliano Nuclear Reactor. Quarterly Report No. 6

The United States and the European Atomic Energy Community (Euratom), on May 29, and June 18, 1958, signed an agreement which provides a basis for co-operation in programs for the advancement of the peaceful applications of atomic energy. The work described in this report represents the Joint U.S.-Euratom effort. The over-all development program is designed to obtain the test data and operating experience necessary to eventually realize a 50 percent increase in the output of the Garigliano Nuclear Power Station located at Sessa Aurunca (Campania, Italy). Two tasks are in progress: Task III-F involves the preparation of test specimens of reactor vessel material for irradiation; Task IV consists of the formulation of specification for a complete data logging and computer system.
Date: April 1, 1964
Creator: Howard, C. L.
System: The UNT Digital Library
Development Program for Increased Output in the Garigliano Nuclear Reactor. Quarterly Report No. 7 (open access)

Development Program for Increased Output in the Garigliano Nuclear Reactor. Quarterly Report No. 7

The United States and the European Atomic Energy Community (Euratom), on May 29, and June 18, 1958, signed an agreement which provides a basis for co-operation in programs for the advancement of the peaceful applications of atomic energy. The work described in this report represents the Joint U.S.-Euratom effort. The over-all development program is designed to obtain the test data and operating experience necessary to eventually realize a 50 percent increase in the output of the Garigliano Nuclear Power Station located at Sessa Aurunca (Campania, Italy). One task is in progress: Task I - Data Logging and Computer System. The work on the other tasks is being planned and initiated.
Date: July 1, 1964
Creator: Howard, C. L.
System: The UNT Digital Library
High Power Density Development Project: Fifteenth Quarterly Progress Report, October-December 1963 (open access)

High Power Density Development Project: Fifteenth Quarterly Progress Report, October-December 1963

Development of nuclear reactor cores having high power density, long fuel life, and low fabrication costs is the objective of this program sponsored by the AEC. Five tasks are in progress: (1) Task 1A-High Power Density Fuel Development. All fuel irradiation has been terminated with the final shutdown of the VBWR. The high burnup average achieved by a single assembly in the group is 10,000 MWD/T (assembly 1F). Twenty-one of the original 24 assemblies have failed or are suspected of failure. Profilometer tests rung on HPD assembly 2E, Rod B, indicate that localized clad deformation occurs during operation. (2) Task 1B-Fuel Fabrication Development. Assembly. All fuel irradiation has been terminated with the final shutdown of the VBWR. The highest average burnup achieved by a single assembly in the group was assembly 4S with 8400 MWD/T. All assemblies in the group have failed or are suspected of failure. The Phase I developmental fuel continues to be irradiated in the Big rock Point reactor with the lead assembly having reached 1500 MWD/T. Fifteen phase II developmental assemblies are being construction for insertion at Big Rock Point in March. Engineering is underway to provide one instrumented assembly probe and two spare flowmeters for …
Date: January 1, 1964
Creator: Holladay, R. L.
System: The UNT Digital Library