High Performance UO2 Program Quarterly Progress Report Number 2: July-September 1961 (open access)

High Performance UO2 Program Quarterly Progress Report Number 2: July-September 1961

The primary purpose of this joint USAEC-Euratom program is to obtain a better understanding if the maximum achievable operating characteristics of UO2 as a reactor fuel. During the program work will be performed in two areas that have been of concern to reactor core designers for a long time, namely fission gas release and central melting in fuel rods.
Date: October 1, 1961
Creator: Weidenbaum, B.
System: The UNT Digital Library
High Performance UO2 Program Fourth Quarterly Progress Report (open access)

High Performance UO2 Program Fourth Quarterly Progress Report

This phase of the program is concerned with irradiation of fuel assemblies to determine central temperature limitations.
Date: April 1, 1962
Creator: Weidenbaum, B.
System: The UNT Digital Library
High Power Density Development Project Fourth Quarterly Progress Report : January - March 1961 (open access)

High Power Density Development Project Fourth Quarterly Progress Report : January - March 1961

The fourth quarter of effort applied to the Consumers R & D Program is summarized in the following: high power density fuel development, fuel fabrication development, stability, heat transfer and fluid flow, physics development, operation planning and test coordination.
Date: April 1, 1961
Creator: Holland, L. K.
System: The UNT Digital Library
High Performance UO2 Program First Quarterly Progress Report: April-June 1961 (open access)

High Performance UO2 Program First Quarterly Progress Report: April-June 1961

A better understanding of the maximum operating characteristics that can be achieved with the use of UO2 as a reactor fuel is the primary purpose of this program for Euratom and the Atomic Energy Commission. During this program work will be undertaken in two areas that have been of concern to the reactor core designer for a long time, viz. fission gas release and central melting in fuel rods.
Date: July 1, 1961
Creator: Weidenbaum, B
System: The UNT Digital Library
High Power Density Development Project (Contract Pending) Advance Requisition 474-49976 - Second Quarterly Progress Report, July-September, 1960 (open access)

High Power Density Development Project (Contract Pending) Advance Requisition 474-49976 - Second Quarterly Progress Report, July-September, 1960

Development of nuclear reactor cores having high power density, long fuel life, and low fabrication costs is the objective of this program sponsored by the AEC. It will be achieved by extensive development and testing carried out in conjunction with the design, construction and operation of the Big Rock Point plant of the Consumers Power Company in Michigan. This second quarterly report describes the progress achieved from July through September 1960.
Date: October 1, 1960
Creator: Holland, L. K.
System: The UNT Digital Library
Preliminary Hazards Summary Report For The Vallecitos Superheat Reactor (open access)

Preliminary Hazards Summary Report For The Vallecitos Superheat Reactor

This Preliminary Hazards Summary Report has been prepared for submission to the United States Atomic Energy Commission in compliance with Part 50 of the regulations governing the licensing of production or utilization facilities, pursuant to the Atomic Energy Act of 1954, as amended, and contains the general information required by 10 CFR 50.34.
Date: February 1, 1961
Creator: General Electric Company
System: The UNT Digital Library
High Power Density Development Project Eighth Quarterly Progress Report January - March 1962 (open access)

High Power Density Development Project Eighth Quarterly Progress Report January - March 1962

During the eighth quarter the instrumented assemblies were removed from VBWR and examined for effects of the exposure to reactor conditions. Also during this period the Big Rock developmental fuel assembly design was completed and a topical report was issued. A summary of progress by task is presented here.
Date: April 1, 1962
Creator: Holladay, R. L.
System: The UNT Digital Library
Accurate Nuclear Fuel Burnup Analyses: Third Quarterly Progress Report June - August, 1962 (open access)

Accurate Nuclear Fuel Burnup Analyses: Third Quarterly Progress Report June - August, 1962

Work has continued on the development of accurate nuclear fuel burnup analysis. Work performed by the third quarter of 1962 is summarized.
Date: October 1, 1962
Creator: Rider, B. F.
System: The UNT Digital Library
High Power Density Development Project Tenth Quarterly Progress Report July-September 1962 (open access)

High Power Density Development Project Tenth Quarterly Progress Report July-September 1962

The Big Rock Point Reactor of the Consumers Power Company went critical for the first time on September 27, 1962. Summarized here are objectives and accomplishments of the pre-operational period as well as an indication of work scope remaining.
Date: October 1, 1962
Creator: Holladay, R. L.
System: The UNT Digital Library
Accurate Nuclear Fuel Burnup Analyses: Fourth Quarterly Progress Report September-November, 1962 (open access)

Accurate Nuclear Fuel Burnup Analyses: Fourth Quarterly Progress Report September-November, 1962

Work has continued on the development of accurate nuclear fuel burnup analysis. Work performed during the fourth quarter is summarized here.
Date: December 1, 1962
Creator: Rider, B. F.; Ruiz, C. P. & Peterson, J. P.
System: The UNT Digital Library