Serial/Series Title

Month

1 Matching Results

Results open in a new window/tab.

Office for Analysis and Evaluation of Operational Data. Annual report, 1994-FY 95 (open access)

Office for Analysis and Evaluation of Operational Data. Annual report, 1994-FY 95

The United States Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) has published reports of its activities since 1984. The first report covered January through June of 1984, and the second report covered July through December 1984. Since those first two semiannual reports, AEOD has published annual reports of its activities from 1985 through 1993. Beginning with the report for 1986, AEOD Annual Reports have been published as NUREG-1272. Beginning with the report for 1987, NUREG-1272 has been published in two parts, No. 1 covering power reactors and No. 2 covering nonreactors (changed to {open_quotes}nuclear materials{close_quotes} with the 1993 report). The 1993 AEOD Annual Report was NUREG-1272, Volume 8. AEOD has changed its annual report from a calendar year to a fiscal year report to be consistent with the NRC Annual Report and to conserve staff resources. NUREG-1272, Volume 9, No. 1 and No. 2, therefore, are combined calendar year 1994 (1994) and fiscal year 1995 (FY 95) reports which describe activities conducted between January 1, 1994, and September 30, 1995. Certain data which have historically been reported on a calendar year basis, however, are complete through calendar year 1995. Throughout this report, whenever information is …
Date: July 1, 1996
Creator: unknown
System: The UNT Digital Library