Partner
8 Matching Results
Results open in a new window/tab.
Results:
1 - 8 of
8
Cutoff Trench
Caption says, "A-238 Lugert Dike taken from rock point north of cutoff trench, Station 44. Construction 54 percent completed. Progress picture."
Date:
August 1, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
East Dike
Caption says, "A-236 East Dike taken from Station 16+00, 50 feet downstream from toe, from top of waste pile looking north."
Date:
August 1, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Inside of Field Laboratory
Caption says, "A-240 Field Laboratory - Interior view showing west section of laboratory."
Date:
August 1, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Carryall Units
Caption says, "A-235 Carryalls in Borrow Area west of Stations 16+00 to 20+00. East Dike embankment in background."
Date:
August 1, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Crews Hand Tamping
Caption says, "A-237 Hand tamping in cutoff trench, Station 42 on Lugert Dike."
Date:
August 1, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Picture of Progress
Caption says, "A-239 Downstream toe of Lugert Dike, 150 feet downstream from Station 41. Construction 54 percent completed. Progress picture."
Date:
August 1, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Inside of Field Laboratory
Caption says, "A-242 Field Laboratory - Interior view showing south side of east section."
Date:
August 1, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Inside of Field Laboratory
Caption says, "A-241 Field Laboratory - Interior view showing north side and part of east end."
Date:
August 1, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History