8 Matching Results

Results open in a new window/tab.

Cutoff Trench

Caption says, "A-238 Lugert Dike taken from rock point north of cutoff trench, Station 44. Construction 54 percent completed. Progress picture."
Date: August 1, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

East Dike

Caption says, "A-236 East Dike taken from Station 16+00, 50 feet downstream from toe, from top of waste pile looking north."
Date: August 1, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Inside of Field Laboratory

Caption says, "A-240 Field Laboratory - Interior view showing west section of laboratory."
Date: August 1, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Carryall Units

Caption says, "A-235 Carryalls in Borrow Area west of Stations 16+00 to 20+00. East Dike embankment in background."
Date: August 1, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Crews Hand Tamping

Caption says, "A-237 Hand tamping in cutoff trench, Station 42 on Lugert Dike."
Date: August 1, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Picture of Progress

Caption says, "A-239 Downstream toe of Lugert Dike, 150 feet downstream from Station 41. Construction 54 percent completed. Progress picture."
Date: August 1, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Inside of Field Laboratory

Caption says, "A-242 Field Laboratory - Interior view showing south side of east section."
Date: August 1, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Inside of Field Laboratory

Caption says, "A-241 Field Laboratory - Interior view showing north side and part of east end."
Date: August 1, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History