Resource Type

Theory of Asymmetric Arrays of Control Rods in Nuclear Reactors (open access)

Theory of Asymmetric Arrays of Control Rods in Nuclear Reactors

Introduction: Seldom does the actual arrangement of control elements in a nuclear reactor confers to the ideal and convenient mathematical array. In order to achieve shim control. safety and regulation, it is desirable to design with rods of different sizes and materials. With given fuel element arrangement, typically in square or hexagonal lattice spacing, there will be rods located at different distances form the center of the core and from each other. As the reactor operates, absorbers will be withdrawn, leaving further asymmetries in the location of those remaining. It is the purpose of this report to develop in detail a two-group diffusion theory with as complete generality as possible. The method is as yet restricted to the unreflected core, or to the reflected core by use of reflector savings and bare equivalent geometries.
Date: April 25, 1959
Creator: Murray, Raymond L.
System: The UNT Digital Library
SM-1 Research and Development Program : Final Report on Fission Product Activity in the SM-1 Primary Coolant, Task XIII (open access)

SM-1 Research and Development Program : Final Report on Fission Product Activity in the SM-1 Primary Coolant, Task XIII

Abstract: Fission product measurements were made on the SM-1 primary coolant. The airborne activity observed during the sampling of the primary system was identified. An analysis was made on the primary coolant for alpha activity and on the secondary water for fission production iodine.
Date: June 30, 1959
Creator: Hasse, Robert A.
System: The UNT Digital Library
SM-1 Research and Development Program, Activity Buildup Program Task 1 : final report February 1958 to June 1959 (open access)

SM-1 Research and Development Program, Activity Buildup Program Task 1 : final report February 1958 to June 1959

Abstract: The results of activity buildup studies in the SM-1 (APPR-1) performed from February 1958 to January 1959 are reported. Data are presented on the extent, nature, and mechanism of the buildup of long-lived gamma emitting nuclides in the reactor primary system. Mathematical equations to describe the activity buildup are derived. Radiation levels after reactor shutdown are presented, as well as the predicted radiation levels at the end of core life.
Date: August 10, 1959
Creator: Brown, William S.; Bergen, C. Richard.; Bergmann, Carl A.; Chupak, Julius.; Fitzsimmons, Susanne R. & Grant, Louis G.
System: The UNT Digital Library
SM-2 Critical Experiments : CE-1 (open access)

SM-2 Critical Experiments : CE-1

Abstract: Critical experiment studies were performed, varying the parameters U235, B10 and metal to water ratio, in the SM-2 7 x 7 core configuration with 38 stationary elements and seven control rods of the SM-1 (APPR-1) type. An experimental mock-up of the SM-1 was assembled using the basic SM-2 fuel plates. Excellent agreement between the SM-1 boron loading, determined by chemical analysis, and the SM-1 mock-up boron loading, for equivalent bank positions, was noted. Several SM-2 mock-ups, cold clean and midlife, were assembled and studied with regard to reflector effects, flow divider effects, relative control rod array worths, critical rod configurations, and relative power distributions. The results of these experiments indicate as satisfactory a U235 loading of 36.4 Kg and a B10 loading of 63.4 grams for the SM-2. Attention is drawn to numerous power peaks present in the active core. The open seven control rod array has a slight reactivity advantage over the closed seven array and consequent minor disadvantage with respect to "stuck rod" criteria.
Date: November 30, 1959
Creator: Noaks, J. W.; McCool, W. J.; Robinson, R. A.; Schrader, E. W. & Weiss, S. H.
System: The UNT Digital Library
Extended SM-2 Critical Experiments : CE-2 (open access)

Extended SM-2 Critical Experiments : CE-2

Abstract: This technical report contains a description and results of a second series of critical experiments performed on the SM-2 core mock-up, as additional to the first series of experiments reported in APAE No. 54. The SM-2 core mock-up contains 36.4 kg U-235 and and estimated 67.9 gm B-10. The equivalent diameter and the active height are about 22 in.; the metal-to-water volume ration is 0.344. Data is presented on activation, reactivity, and stuck rod measurements. All measurements were conducted on the open seven control rod array employing 38 stationary fuel elements. Activation measurements consisted of neutron flux measurements using uranium fission foils for relative power distribution studies, the effect of flux suppressors on reducing power peaks, blocked coolant channel measurements, and gamma ray dose distribution. Reactivity measurements were performed to determine the effect f flow divider, flux suppressors and stimulated high temperature and pressure operation; b-10 loading in the SM-2 core; and core material coefficients. For the later, the worth in cents per gm or cents per cc was determined at simulated temperature of 510 degree F for B-10, U-235, stainless steel, and void. Stuck rod measurements were made to obtain an indication of the criticality margin in the …
Date: June 30, 1961
Creator: McCool, W. J.; Robinson, R. A.; Weiss, S. H.; Raby, T. M.; Schrader, E. W. & Walthousen, L. D.
System: The UNT Digital Library
SM-1 Reactor Core Inspection at 2/3 Core Life : March 7, 1959 to May 17, 1959 (open access)

SM-1 Reactor Core Inspection at 2/3 Core Life : March 7, 1959 to May 17, 1959

Abstract: This technical report is concerned with the program and results of the SM-1 reactor vessel head removal and core inspection at Fort Belvoir, Virginia from the period March 7, 1969 to May 17, 1959. It covers the operating procedures in detail and records the conditions found and problems encountered in order to make a record for reference in future work of this nature. The major objective of the program, to obtain irradiation data on the SM-1 type core, has been met. The boron control rod elements were found unsatisfactory for full core life, and europium oxide elements were placed in the core for future irradiation stability data. A major problem was experienced with the cracked pressure vessel head studs. The methods developed for the removal of the broken studs are presented. The complete metallurgical study of the stud failure from stress corrosion is included as Appendix B.
Date: January 13, 1960
Creator: Obrist, C. H.; Byrne, B. J.; Connolly, T. F.; Foley, D. D.; Lichtenberger, R. V.; Mackay, S. D. et al.
System: The UNT Digital Library
DuPont Prototype Safety and Control Rod Drive Testing (open access)

DuPont Prototype Safety and Control Rod Drive Testing

Summary: Prototype testing of the safety and control rod drives indicated that both units functioned properly. No major problems were encountered during testing. Seal leakage data collected indicated that the seal units were performing satisfactorily. Scram times during both cold and hot testing were excellent and actually better than expected.
Date: April 25, 1960
Creator: VandeMark, G. M. & Krause, P. S.
System: The UNT Digital Library
A Survey of the Effects of Neutron Irradiation on the Impact and Other Mechanical Properties of Pressure Vessel Steels for the SM-2 Reactor (open access)

A Survey of the Effects of Neutron Irradiation on the Impact and Other Mechanical Properties of Pressure Vessel Steels for the SM-2 Reactor

Abstract: This technical report summarizes the data obtained in a recent literature survey conducted to determine the effects of neutron irradiation on the impact and other mechanical properties of both ferritic steels and austenitic stainless steels. The survey was primarily aimed at obtaining sufficient data on the behavior of pressure vessel steels at high integrated neutron flux levels in order that a reference material of construction could be selected for the SM-2 (APPR-1B) reactor vessel. Materials studied in this literature survey included carbon and low alloy steels such as: ASTM A-212B, ASTM A-201, ASTM A-301B (CR-Mo), ASTM A-106 (coarse and fine grained), ASTM A-285, ASTM A-302B (Mn-Mo), ASTM A-353, ASTM A-203 Grade D, E-7016 carbon steel weld metal, USS Carilloy T-1, HY-65 and HY-80. In addition, Types 304 and 347 stainless steels were also investigated as representative austenitic materials which might be used in pressure vessel construction. A careful evaluation was made of the irradiation induced changes in the mechanical properties of the above materials. The ferritic steels were evaluated primarily on the basis of increases in transition temperature due to irradiation and decreases in the amount of maximum energy absorbed prior to ductile failure. Factors such as industrial experience, …
Date: April 1, 1960
Creator: Kelleman, Richard William.
System: The UNT Digital Library
Control and Dynamics Performance of a Sodium Cooled Reactor Power System (open access)

Control and Dynamics Performance of a Sodium Cooled Reactor Power System

Introduction: Objectives and Method of Approach. High plant efficiencies can be realized without excessively high core temperatures and high coolant pressures by the use of liquid metal coolant. In an attempt to prove the feasibility of liquid sodium as a reactor coolant ALCO Products, Inc., under sponsorship of the Atomic Energy Commission, is undertaking a design study of three vital system components: the intermediate exchanger, the boiler, and the superheater. Since, in the past programs, the nuclear reactor had been the major focus of attention, the development of the sodium cooled reactor and sodium pumps for this application are thought to need the less development than the heat exchanger equipment. Consequently, parallel design studies of the reactor, pumps, and other system components have not yet been initiated.
Date: 1960
Creator: Alco Products (Firm).
System: The UNT Digital Library
Hazards Summary Report for the Army Package Power Reactor : SM-1, Task XVII (open access)

Hazards Summary Report for the Army Package Power Reactor : SM-1, Task XVII

Preface. This technical report is an updated and revised version of the original SM-1 (APPR-1) Hazards Summary Report. The original report was issued July 1955, almost two years before construction of the SM-1 plant was completed. During that time interval there were numerous design changes. Consequently, the original report does not accurately describe the plant as built. This revision is written after the SM-1 has been operated 3 years. It describes the as-build plant and includes plant modifications and experience obtained during the first 3 years of SM-1 operation.
Date: May 1960
Creator: Rosen, S. S.
System: The UNT Digital Library
Shielding Requirements for the Army Package Power Reactor (open access)

Shielding Requirements for the Army Package Power Reactor

Abstract. The design, selection, and calculation of the Army Package Power Reactor shielding are described. The APPR-1, a prototype of a package reactor for remote locations, has a primary shield of iron and water. this shield has been adopted to permit fast erection and to provide low transported weight. economically, including transportation cost, the iron water shield is better than a lead water shield and is competitive with a concrete shield for a remote site. Because of the location at Fort Belvoir,Va., the shielding requirements for the APR-1 are considerably more stringent than those for a reactor at a remote base. Since the secondary shielding which surrounds the entire primary system must provide protection for personnel at any location outside the vapor container, concrete is provided for this need.
Date: May 1, 1956
Creator: Meem, J. L. (James Lawrence). & Fairbanks, F. B.
System: The UNT Digital Library
Reactor Analysis for the Army Package Power Reactor No. 1 (open access)

Reactor Analysis for the Army Package Power Reactor No. 1

Abstract: The reactor analysis of the critical experiment and the APPR-1 resulted in a loading of the APPR-1 of 31.096 gm of B-10 with 22.5 kg U-335. This loading will result in adequate reactivity for a core life of 13 MWYR based on uniform burnup of U-335 and B-10. Calculations indicate that five of the seven control rods provided are more than adequate to shut the reactor down at any time. The temperature coefficient of reactivity should be at least -2 x 10-4 [delta] K/0F.
Date: May 29, 1956
Creator: Gallagher, J. G.; Giesler, H. W.; Johnson, W. R.; Fairbanks, F. B.; Oby, P. V. & Crouch, A. N.
System: The UNT Digital Library
Reactor Analysis for the Army Package Power Reactor No. 1 (open access)

Reactor Analysis for the Army Package Power Reactor No. 1

Abstract: The reactor analysis of the critical experiment and the APPR-1 resulted in a loading of the APPR-1 of 31.096 gm of B-10 with 22.5 kg U-335. This loading will result in adequate reactivity for a core life of 13 MWYR based on uniform burnup of U-335 and B-10. Calculations indicate that five of the seven control rods provided are more than adequate to shut the reactor down at any time. The temperature coefficient of reactivity should be at least -2 x 10-4 [delta] K/0F.
Date: May 29, 1956
Creator: Gallagher, J. G.; Giesler, H. W.; Johnson, W. R.; Fairbanks, F. B.; Oby, P. V. & Crouch, A. N.
System: The UNT Digital Library
Radiochemical Analysis of Crud from the Army Package Power Reactor (open access)

Radiochemical Analysis of Crud from the Army Package Power Reactor

Abstract: A study has been made of the radiochemical composition and the specific activity of insoluble corrosion products (crud) removed from the primary system of the APPR-1. This report presents the results of analysis of twelve crud samples collected during the interval from September 3, 1957 to December 1, 1957. The samples were radiochemically analyzed for long-lived gamma emitting nuclides only. Data are presented on the measured values of the specific activity of crud, the ratios of the nuclide specific activities, and the concentration of crud (crud level) in the circulating primary water. Also included in data, based on the analysis of a single sample, comparing the specific activity of the deposited and circulating corrosion products.
Date: February 15, 1958
Creator: Zegger, J. L.; Small, W. J. & Brown, W. S.
System: The UNT Digital Library
Stratospheric Air Concentrations of Plutonium Isotopes (open access)

Stratospheric Air Concentrations of Plutonium Isotopes

A report on stratospheric air concentrations of plutonium isotopes.
Date: June 11, 1965
Creator: Salter, Leonard P.
System: The UNT Digital Library
Health and Safety Laboratory Fallout Program Quarterly Summary Report: June 1, 1965 - September 1, 1965 (open access)

Health and Safety Laboratory Fallout Program Quarterly Summary Report: June 1, 1965 - September 1, 1965

Report documenting radioactive fallout across the world, including material in the atmosphere, on land, and that has deposited into food and water supplies.
Date: October 1, 1965
Creator: Hardy, Edward P., Jr. & Rivera, Joseph
System: The UNT Digital Library
Health and Safety Laboratory Fallout Program Quarterly Summary Report: September 1, 1971 - December 1, 1971, Appendix (open access)

Health and Safety Laboratory Fallout Program Quarterly Summary Report: September 1, 1971 - December 1, 1971, Appendix

Report documenting radioactive fallout across the world, including material in the atmosphere, on land, and that has deposited into food and water supplies.
Date: January 1, 1972
Creator: unknown
System: The UNT Digital Library
Application of Photogrammetric Techniques for Environmental Surveillance of Amchitka Island, Alaska, Annual Progress Report, July 1, 1969 - June 30, 1970 (open access)

Application of Photogrammetric Techniques for Environmental Surveillance of Amchitka Island, Alaska, Annual Progress Report, July 1, 1969 - June 30, 1970

Report concerning surveys made to determine the abundance and distribution of otters at Amchitka Island, Alaska, as well to document the effects of an underground nuclear reactor.
Date: March 1972
Creator: Stephan, Joachim G. & Mercier, Ian M.
System: The UNT Digital Library
The Recovery of Uranium from Chattanooga Shales (open access)

The Recovery of Uranium from Chattanooga Shales

Recovery of uranium from Chattanooga shales.
Date: January 14, 1954
Creator: Wilson, R. Q.; Ewing, R. A.; Hanway, J. E., Jr.; Meeley, W. A.; Bearse, A. E.; Filbert, R. B., Jr. et al.
System: The UNT Digital Library
Numerical Results for EGCR Moderator-Element Stress Problems (open access)

Numerical Results for EGCR Moderator-Element Stress Problems

From introduction: "A recent report describes the development of a general program for the IBM Type 7090 electronic computer for calculating plane thermal stresses."
Date: July 3, 1961
Creator: Hulbert, Lewis E. & Redmond, Robert F.
System: The UNT Digital Library
Thermal Expansion of Rare Earth Metals (open access)

Thermal Expansion of Rare Earth Metals

High temperature dilatometric investigation of the rare earth metals undertaken as part of a broad program of study of these elements, the ultimate goal being better understanding of metals in general.
Date: June 1956
Creator: Barson, Fred; Legvold, S. & Spedding, F. H.
System: The UNT Digital Library
A Method for Evaluation of Multiple Scattering Effects in Charged Particle Experiments (open access)

A Method for Evaluation of Multiple Scattering Effects in Charged Particle Experiments

Formulas, tables, graphs reviewing the multiple scattering theory of E. J. Williams.
Date: December 1, 1950
Creator: Dickinson, W. C. & Dodder, D. C.
System: The UNT Digital Library
Sample Collector and Counter (open access)

Sample Collector and Counter

From abstract: "An apparatus is described which automatically separates a flow of drops into a series of equal samples."
Date: July 27, 1954
Creator: Deal, James B., Jr. & Buchen, John F.
System: The UNT Digital Library
Installation of a Chemical Research Laboratory (open access)

Installation of a Chemical Research Laboratory

Installation of a chemical research laboratory.
Date: January 27, 1948
Creator: Sheinberg, H. & Thomas, R. L.
System: The UNT Digital Library