High SO{sub 2} removal efficiency testing. Quarterly report, July - September 1996 (open access)

High SO{sub 2} removal efficiency testing. Quarterly report, July - September 1996

This document provides a discussion of the technical progress on DOE/PETC project number DE-AC22-92PC91338, ``High Efficiency SO{sub 2} Removal Testing,`` for the time period 1 July through 30 September 1996. The project involves testing at six full-scale utility flue gas desulfurization (FGD) systems, to evaluate low capital cost upgrades that may allow these systems to achieve up to 98% SO{sub 2} removal efficiency. The upgrades being evaluated mostly involve using performance additives in the FGD systems. The ``base`` project involved testing at the Tampa Electric Company`s Big Bend Station. All five potential options to the base program have been exercised by DOE, involving testing at Hoosier Energy`s Merom Station (Option I), Southwestern Electric Power Company`s Pirkey Station (Option II), PSI Energy`s Gibson Station (Option III), Duquesne Light`s Elrama Station (Option IV), and New York State Electric and Gas Corporation`s Kintigh Station (Option V). The originally planned testing has been completed for all six sites. The remainder of this document provides a brief overview of the status of technical efforts on this project, including those efforts anticipated for the first quarter of calendar year 1996, summarizes results from prior quarters, and contains a brief acknowledgment. 13 refs.
Date: July 1, 1996
Creator: Blythe, G.
System: The UNT Digital Library
High efficiency SO{sub 2} removal testing. Quarterly report, 1 January--31 March 1995 (open access)

High efficiency SO{sub 2} removal testing. Quarterly report, 1 January--31 March 1995

This project involves testing at six full-scale utility flue gas desulfurization (FGD) systems, to evaluate low capital cost upgrades that may allow these systems to achieve up to 98% SO{sub 2} removal efficiency. The upgrades being evaluated mostly involve using additives in the FGD systems. The ``base`` project involved testing at the Tampa Electric Company Big Bend station. All five potential options to the base program have been exercised by DOE, involving testing at the Hoosier Energy Merom Station (Option 1), the Southwestern Electric Power Company Pirkey Station (Option 11), the PSI Energy Gibson Station (Option III), the Duquesne Light Elrama Station (Option IV), and the New York State Electric and Gas Corporation`s (NYSEG) Kintigh Station (Option V). Testing has been completed for all six sites. Following the introduction, this document divided into four sections. Section 2, Project Summary, provides a brief overview of the status of technical efforts on this project. Section 3, Results, summarizes the outcome from these technical efforts during the quarter. In Section 4, Plans for the Next Reporting Period, an overview is provided of the technical efforts that are anticipated for the second quarter of calendar year 1995. Section 5 contains a brief acknowledgement.
Date: April 11, 1995
Creator: unknown
System: The UNT Digital Library
High SO{sub 2} removal efficiency testing. Quarterly status report, October 1994--December 1994 (open access)

High SO{sub 2} removal efficiency testing. Quarterly status report, October 1994--December 1994

This document provides a discussion of the technical progress on DOE/PETC project number DE-AC22-92PC91338, {open_quotes}High Efficiency SO{sub 2} Removal Testing{close_quotes}, for the time period 1 October through 31 December 1994. The project involves testing at six full-scale utility flue gas desulfurization (FGD) systems, to evaluate low-capital cost upgrades that may allow these systems to achieve up to 98% SO{sub 2} removal efficiency. The upgrades to be evaluated primAllily involve using additives in the FGD systems. The {open_quotes}base{close_quotes} project involved testing at the Tampa Electric Company Big Bend station. AR five potential options to the base program have been exercised by DOE, involving testing at the Hoosier Energy Merom Station (Option I), the Southwestern Electric Power Company Pirkey Station (Option II), the PSI Energy Gibson Station (Option III), the Duquesne Light Elrama Station (Option IV), and the New York State Electric and Gas Corporation (NYSEG) Kintigh Station (Option V). By the beginning of the fourth quarter of 1994, testing had been completed for the base project and for all options. The remainder of this document is divided into four sections. Section 2, Project Summary, provides a brief overview of the status of technical efforts on this project. Section 3, Results, summarizes …
Date: February 3, 1995
Creator: Blythe, G.
System: The UNT Digital Library
High SO{sub 2} removal efficiency testing. Quarterly status report, April-June 1995 (open access)

High SO{sub 2} removal efficiency testing. Quarterly status report, April-June 1995

This project involves testing at six full-scale utility flue gas desulfurization (FGD) systems to evaluate low capital cost upgrades that may allow these systems to achieve up to 98% SO{sub 2} removal efficiency. The upgrades being evaluated mostly involve using performance additives in the FGD systems. The {open_quotes}base{close_quotes} project involved testing at the Tampa Electric Company Big Bend station. All five potential options to the base program have been exercised by DOE, involving testing at Hoosier Energy`s Merom Station (Option I), Southwestern Electric Power Company`s Pirkey Station (Option II), PSI Energy`s Gibson Station (Option III), Duquesne Light`s Elrama Station (Option IV), and New York State Electric and Gas Corporation`s Kintigh Station (Option V). The originally planned testing has been completed for all six sites. The remainder of this document is divided into four sections. Section 2, Project Summary, provides a brief overview of the status of technical efforts on this project. Section 3, Results, summarizes the outcome from technical efforts during the quarter, or results from prior quarters that have not been previously reported. In Section 4, Plans for the Next Reporting Period, an overview is provided of the technical efforts that are anticipated for the third quarter of calendar …