Accurate Nuclear Fuel Burnup Analyses; Eighth Quarterly Progress Report, (September - November 1963) (open access)

Accurate Nuclear Fuel Burnup Analyses; Eighth Quarterly Progress Report, (September - November 1963)

The objective of the Accurate Nuclear Fuel Burnup Analyses program is to develop more accurate methods for burnup analysis for general use than the current method of analysis of Ca-137 or Sr-90. The program will require from three to five years of effort.
Date: December 1, 1963
Creator: Rider, B. F.; Ruiz, C. P.; Luke, P. S., Jr.; Peterson, J. P., Jr. & Smith, F. R.
System: The UNT Digital Library
Accurate Nuclear Fuel Burnup Analyses: Fourth Quarterly Progress Report September-November, 1962 (open access)

Accurate Nuclear Fuel Burnup Analyses: Fourth Quarterly Progress Report September-November, 1962

Work has continued on the development of accurate nuclear fuel burnup analysis. Work performed during the fourth quarter is summarized here.
Date: December 1, 1962
Creator: Rider, B. F.; Ruiz, C. P. & Peterson, J. P.
System: The UNT Digital Library
Bounce III (open access)

Bounce III

BOUNCE III is a program which was written for the IBM-704 as part of a study of the parameters of the neutron distribution in a large thermal column. The program calculates the eigenvalues and corresponding eigenvectors of the matrix resulting from a diffusion-theory, multigroup description of the thermal neutron spectrum.
Date: December 15, 1960
Creator: Kerr, B. A.
System: The UNT Digital Library
EVESR Nuclear Superheat Fuel Development Project: Sixth Quarterly Report, September - November, 1963 (open access)

EVESR Nuclear Superheat Fuel Development Project: Sixth Quarterly Report, September - November, 1963

Quarterly report describing progress on the EVESR Nuclear Superheat Fuel Development Project.
Date: December 1963
Creator: Pennington, R. T.
System: The UNT Digital Library
Fabrication of Zirconium Alloys For Specific Zirconium Alloy Design Program (open access)

Fabrication of Zirconium Alloys For Specific Zirconium Alloy Design Program

The raw materials and fabrication procedures employed in preparing thirty two zirconium alloy compositions for evaluation as described in GEAP-3979 are reported. Considerations involved in the extension of reported laboratory procedures to larger scale production are discussed.
Date: December 5, 1962
Creator: Antony, K. C. & Jones, L. T.
System: The UNT Digital Library
The Fast Effect in a Beryllium Moderated Reactor (open access)

The Fast Effect in a Beryllium Moderated Reactor

The effect of the (n, 2n) and (n, o<) reactions on the neutron economy of a beryllium moderated reactor is investigated.
Date: December 7, 1959
Creator: Novak, P. E.
System: The UNT Digital Library
Final Report: 300 KWe Capsule Nuclear Power Plant Study (open access)

Final Report: 300 KWe Capsule Nuclear Power Plant Study

This document presents the results of investigations concerned with the conceptual design of a 300 KWe "Capsule" nuclear power plant.
Date: December 15, 1960
Creator: General Electric Company
System: The UNT Digital Library
Heavy Element Isotopic Analysis of UO2 Fuel Irradiated In The VBWR: Report #1 (open access)

Heavy Element Isotopic Analysis of UO2 Fuel Irradiated In The VBWR: Report #1

The primary objective of this program is to obtain improved data on the changes in nuclear characteristics with burnup of uranium oxide fuel in a boiling water reactor.
Date: December 28, 1962
Creator: Hackney, M. R. & Ruiz, C. P.
System: The UNT Digital Library
Maritime Loop Irradiation Program Savannah I Fuel Irradiation Quarterly Progress Report: July 1, 1961-September 30, 1961 (open access)

Maritime Loop Irradiation Program Savannah I Fuel Irradiation Quarterly Progress Report: July 1, 1961-September 30, 1961

This report covers the S-I-5-B-M fuel irradiation in the GETR Maritime Loop during the first quarter of fiscal year 1962. The data are summarized in Section II.
Date: December 21, 1961
Creator: Danielson, D. W. & Gilbert, R. S.
System: The UNT Digital Library
Nuclear Powered Tanker Design and Economic Analysis - Direct Cycle Boiling Water Reactor (open access)

Nuclear Powered Tanker Design and Economic Analysis - Direct Cycle Boiling Water Reactor

A design and economic analysis is presented for a 44,000 DWT tanker utilizing a 27,300 shp direct cycle boiling water reactor propulsion system. Included are design descriptions and drawings, estimates of operating and capitol costs for the reference ship, estimates of long range potential, descriptions of required research and development programs, a preliminary safeguards analysis, an analysis of ship's motion on boiling water reactor performance, a summary reactor physics analysis, and a discussion of direct cycle accessibility considerations. Also included are summary descriptions for various design alternatives which were considered.
Date: December 15, 1959
Creator: General Electric Company
System: The UNT Digital Library
Prediction of Two-Phase Flow From Mixing Length Theory (open access)

Prediction of Two-Phase Flow From Mixing Length Theory

It is proposed in this report to describe a new two-phase flow mixing length model. It consists of treating the two-phase system as a continuous medium and applying to it the methods and assumptions so widely accepted in single-phase turbulent flow. Because it reduces a two-phase problem to an equivalent one in single-phase flow, the proposed model can be readily used to predict the effects of flow rate, channel geometry, and channel direction in two-phase flow.
Date: December 27, 1960
Creator: Levy, S.
System: The UNT Digital Library
Some Control Rod Applications and Operating Experience in Power Reactor Environments (open access)

Some Control Rod Applications and Operating Experience in Power Reactor Environments

Information obtained in a survey of control rod applications and operating experience is reported. This survey covered the Army Nuclear Power Program, the Organic Moderated Reactor Experiment, the Yankee Atomic Power Plant, the Shippingport Pressurized Water Reactor and the Argonne Experimental Boiling Water Reactor.
Date: December 14, 1960
Creator: Williamson, H.E.
System: The UNT Digital Library
Summary and Technical Specifications for the Dresden Nuclear Power Station (open access)

Summary and Technical Specifications for the Dresden Nuclear Power Station

This report supersedes the similarly titled report dated December 31, 1958. It describes briefly features of the Dresden plant and proposes technical specifications.
Date: December 31, 1958
Creator: General Electric Company
System: The UNT Digital Library
Two-Phase Pressure Losses Quarterly Progress Report: Seventh Quarter, August 12, 1963 - November 11, 1963 (open access)

Two-Phase Pressure Losses Quarterly Progress Report: Seventh Quarter, August 12, 1963 - November 11, 1963

Technical report describing that the pressure drop along an annular channel with dimensions D(1) = 0.375 inch; D(2) = 0.875 inch, L = 70 inches. Flow was vertical and upward, and only the internal surface was heated. Subcooled conditions existed at the inlet, with two-phase conditions at the exit. Groups of three radial spacer pins on 18-inch centers along the channel, held the inner surface concentric with the outer surface. The single phase loss coefficient for each spacer group is K(8) = 0.21. The single phase friction factor for the annual channel is given by f = 0.16 N(R)(-0.16). The two phase pressure drop increases as the quality increases for G [over] 10(6) = 0.5 ;b/hr ft(2). The effect of heat flux on the pressure drop is very is very slight over the range of fluxes tested (0.55 less than or equal to Q over 10(6).\ less than or equal to 0.8). The two-phase pressure drop gradient in the same annulus, with no heat addition is qualitatively the same as for a 1/4-inch by 1-3/4 inches rectangular channel but is quantitatively greater than for the rectangular channel.
Date: December 2, 1963
Creator: Janssen, E. (Engineer) & Kervinen, J. A.
System: The UNT Digital Library
Two-Phase Pressure Losses Third Quarterly Progress Report August 12-November 12, 1962 (open access)

Two-Phase Pressure Losses Third Quarterly Progress Report August 12-November 12, 1962

This is the third quarterly report on the work done under Contract AT(04-30-189, Project Agreement No.27, and covers the period August 12 to November 12, 1962.
Date: December 12, 1962
Creator: Janssen, E. (Engineer) & Kervinen, J. A.
System: The UNT Digital Library