Melt Rate Testing for the DWPF: Summary of FY02 Testing (open access)

Melt Rate Testing for the DWPF: Summary of FY02 Testing

A study performed in FY01 recommended that the Defense Waste Process Facility (DWPF) replace Frit 200 with Frit 320 for the processing of sludge batch 2 (SB2) to improve melt rate (Lambent et al., 2001) contingent upon additional testing which included slurry feeding. The FY02 melt rate program was developed to support this recommendation as well as to investigate alternative methods of improving melt rate above and beyond a change in frit composition. The integrated program was primarily based on a sound testing methodology from which the frit change was recommended. In addition, the program included the development of additional tools to provide further insight into melt rate enhancements. The overall strategy of the FY02 testing program was to design suites of melt rate tests based on recommendations from previous work that provided insight into other methods of improving melt rate for the DWPF. The objectives of the FY02 testing program included how melt rate might be influenced by increases in waste loading, differences in frit particle size, the use of batch chemicals rather than a pre-fabricated frit, and the impact of uranium. This report summarizes the equipment development and setup, procedures, and results of this testing, and includes recommendations …
Date: February 19, 2003
Creator: Lorier, T.H.
System: The UNT Digital Library