North Central Corridor LRT Extension: Final Environmental Impact Statement (open access)

North Central Corridor LRT Extension: Final Environmental Impact Statement

This report describes the potential environmental impacts and proposed mitigating measures associated with the construction and operation of an extension of the North Central Corridor light rail transit (LRT) system north of Park Lane. It compares the consequences associated with the locally preferred alternative (LRT) against those of a baseline "no-build alternative." This Final Environmental Impact Statement (EIS) for the Northwest Corridor was written following the completion of a Draft EIS and subsequent 45-day public review and comment period and it includes responses to concerns raised during that period.
Date: April 1997
Creator: Dallas Area Rapid Transit
System: The Portal to Texas History
Final Local Environmental Assessment: DART Rail to Rowlett: Appendices (open access)

Final Local Environmental Assessment: DART Rail to Rowlett: Appendices

Appendices for the Final Local Environmental Assessment for the proposed DART Light Rail Transit line from Downtown Garland Station to the planned station in Downtown Rowlett. These include meeting minutes and transcripts, public notices, correspondence with relevant agencies, routine wetland determination forms, noise and vibrations impact assessments, a list of reference plans and guidelines, a list of personnel responsible for preparation, and agency contact information.
Date: April 2007
Creator: Dallas Area Rapid Transit
System: The Portal to Texas History
Re-evaluation of DART Orange Line DFW Airport Extension Irving-3 Environmental Assessment: Final (open access)

Re-evaluation of DART Orange Line DFW Airport Extension Irving-3 Environmental Assessment: Final

This report represents a re-evaluation of the environmental impact of DART's Orange Line DFW Airport Extension following modifications made to the proposed project after both the FAA and FTA had issued a Finding of No Significant Impact (FONSI). The purpose of this report was to determine if the modifications might result in environmental impacts not previously not documented in the earlier environmental assessment, in which case the FONSIs would remain valid. Some modifications to the rail alignments were made to avoid the need to relocate FAA infrastructure, to eliminate bridge structers that could impact flight safety, and to provide enough space for future roadway expansions.
Date: April 2012
Creator: Dallas Area Rapid Transit
System: The Portal to Texas History