Construction, operation and use of KAPL uranium fluorimeters (open access)

Construction, operation and use of KAPL uranium fluorimeters

From introduction: "Two fluorimeters have been constructed for the determination of small amounts of uranium. There fluorimeters have been constructed after the basic plans for the Model V fluorimeter developed at the University of Rochester School of Medicine and Dentistry and described in the Journal of Biological Chemistry for March 1948.
Date: October 7, 1948
Creator: Rider, B. F.
System: The UNT Digital Library
Analysis of Errors to be Expected in Measuring the Neutron Absorption Cross Section of C-12 (open access)

Analysis of Errors to be Expected in Measuring the Neutron Absorption Cross Section of C-12

An experiment now in progress should give some accurate information about the thermal neutron absorption cross section of carbon 12. This report outlines and summarizes this experiment and analyzes it to determine the main sources of error and the probably error in the final result.
Date: October 7, 1953
Creator: Seppi, E. J.
System: The UNT Digital Library
Hazards Report for SM-1 Core II Without the SM-1 Core I High Burnup Elements and With the PM-1-M-2 Element (open access)

Hazards Report for SM-1 Core II Without the SM-1 Core I High Burnup Elements and With the PM-1-M-2 Element

Abstract: The removal of both SM-1 Core I high burnup elements from SM-1 Core II and the insertion of the PM-1-M-2 element and the SM-1 Core I spare element in SM-1 Core II is discussed. Nuclear and thermal characteristics of Core II with these changes are presented and conclusions related to the changes in the hazard potential are made. If the core change indicated by this report is made, local peaking factors will be decreased and burnout ratios will be increased. This, of course, in itself leads to a more conservative estimate of core safety. There is no conceivable reason why the perturbation may not be safely made in the SM-1 Core II.
Date: October 7, 1961
Creator: Coombe, J. R.; Lee, D. H. & Mathews, F. T.
System: The UNT Digital Library
Fuel Cycle Program Progress Report: Thirteenth Quarter, July-September 1963 (open access)

Fuel Cycle Program Progress Report: Thirteenth Quarter, July-September 1963

Quarterly progress report discussing activities related to the Vallecitos Boiling Water Reactor (VBWR) and related facilities
Date: October 7, 1963
Creator: Howard, C. L.
System: The UNT Digital Library