VTE Pilot Plant Annual Report for the Period Ending July 1, 1968 (open access)

VTE Pilot Plant Annual Report for the Period Ending July 1, 1968

From Summary and Conclusions: "After a period of tests at the Oak Ridge National Laboratory in 1966 and 1967, the Vertical Tube Evaporator (VTE) Pilot Plant was moved to the OSW's East Coast Test Station at Wrightsville Beach, N.C. In the summer of 1967 it was installed and was started in upflow operation with seawater feed, using stem and other services provided by the station. The operation of the Pilot Plant at Wrightsville Beach was performed by Stearns-Roger Corporation under subcontract to ORNL. Operation was in the upflow mode during the entire reporting period."
Date: December 1970
Creator: Hill, John W. & Hise, Eugene C.
System: The UNT Digital Library
Oak Ridge National Laboratory Vertical Tube Evaporator Pilot Plant Annual Report for Fiscal Year 1970 (open access)

Oak Ridge National Laboratory Vertical Tube Evaporator Pilot Plant Annual Report for Fiscal Year 1970

From Introduction: "This report covers the work done in fiscal 1970 and the small amount of work done in the early part of fiscal 1971; the inclusive dates covered are July 1, 1969 through July 10, 1970. A four effect VTE train operating in the downflow mode. A single effect VTE unit operating in the downflow mode. A mixed phase high pressure water and steam jet compression unit complete with a boiler to supply high pressure motive steam."
Date: October 1970
Creator: Stearns-Roger Corporation
System: The UNT Digital Library
Oak Ridge National Laboratory Vertical Tube Evaporator Pilot Plant Annual Report for Fiscal Year 1969 (open access)

Oak Ridge National Laboratory Vertical Tube Evaporator Pilot Plant Annual Report for Fiscal Year 1969

From Summary: "This report summarizes the down-flow heat transfer performance of enhanced surface tubes and operations at the four-effect Vertical Tube Evaporator Pilot Plant at the Office of Saline Water East Coast Test Station, Wrightsville Beach, North Carolina. The period from July 1, 1968 to June 30, 1969 is covered in this report."
Date: August 1970
Creator: Stearns-Roger Corporation
System: The UNT Digital Library
Third Report on Horizontal-Tube Multiple-Effect Process Pilot Plant Tests (open access)

Third Report on Horizontal-Tube Multiple-Effect Process Pilot Plant Tests

From Summary: "This report describes the continuing work on HTME distillation plants, the first portions of which were reported in References 1 and 2. A major purpose in the testing of the three-effect pilot plant was to demonstrate mutiple-effect operability of the the horizontal tube method, when utilizing basically the same construction methods and materials as those proposed for commercial HTME plants."
Date: October 1971
Creator: Matta, G. A.; Karpf, J. Z.; Pascale, A. S. & Cardello, J. A.
System: The UNT Digital Library