Resource Type

8 Matching Results

Results open in a new window/tab.

Development of the Hanford Slave Manipulator for Use in the Multicurie Cells at Hanford (open access)

Development of the Hanford Slave Manipulator for Use in the Multicurie Cells at Hanford

Introduction: "During the early planning of the multicurie cells at Hanford it was decided that a slave type manipulator would be necessary to perform the experiments for which the cells were being designed. The design required steel roofs for installation through a port hole in the face. Technical Services Equipment Development began developing the proposed manipulator in January 1951 by making a study of those existing at that tune. None met the requirements which had been established; therefore, the design of a special manipulator was started immediately."
Date: October 31, 1952
Creator: Field, Richard E. & Gifford, John F.
System: The UNT Digital Library
The study of redox-active inorganic substituents of cellulase enzymes. Quarterly report, 25 August--25 November 1993 (open access)

The study of redox-active inorganic substituents of cellulase enzymes. Quarterly report, 25 August--25 November 1993

Cellulase (CBHI) was modified by bis (2,2- bipyridine) ruthenium (II) and the modified enzyme was assayed for cellulase activity using p- nitrophenyl beta-D-cellobioside as substrate. Absorption spectroscopy of native and modified CBHI was also conducted.
Date: December 31, 1993
Creator: unknown
System: The UNT Digital Library
Launch vehicle integration requirements for SP-100 (open access)

Launch vehicle integration requirements for SP-100

SP-100 is the designation for a nuclear reactor-based power plant being developed for both civil and military missions beginning in the 1990s for such potential space applications as communication satellites, space radar, electric propulsion and space stations. Typically, a system using the SP-100 along with a selected upper stage system would be launched by the National Space Transportation System (NSTS) Space Shuttle System into a near-earth orbit, deployed, and through upper stage propulsion burn(s) be inserted/transferred to its mission orbit. The nature of the advanced design SP-100 gives rise to a set of issues that require special attention to assure that payloads using this power plant are physically and functionally compatible with the NSTS and meet the safety requirements thereof. The purpose of this document is to define and present the requirements and interface provisions that, when satisfied, will ensure technical compability between SP-100 systems and the NSTS.
Date: January 31, 1984
Creator: Shaw, L. T. Jr. & Womack, J. R.
System: The UNT Digital Library
Surfactant studies for bench-scale operation. Final technical progress report, July 1, 1992--March 31, 1994 (open access)

Surfactant studies for bench-scale operation. Final technical progress report, July 1, 1992--March 31, 1994

The present work effort relates to an investigation of surfactant-assisted coal liquefaction with the objective of quantifying the enhancement in overall coal conversions and the product quality. Based on the results of a Phase 1 preliminary study on the effect of several surfactants on coal liquefaction, sodium lignosulfonate was chosen as the surfactant for a detailed parametric study to be conducted at JPL using a batch autoclave reactor. These tests primarily related to thermal liquefaction of coal. The results of JPL autoclave test runs showed an increase in overall conversions from 5 to 15% due to surfactant addition over the base case of coal alone. A continuous-flow bench scale coal liquefaction process run was conducted over a 5-day period at Hydrocarbon Research Incorporated (HRI). This test showed that the surfactant is suitable for an industrial continuous recycle process, and does not interfere with the supported catalyst. After the bench scale test, a series of autoclave runs were conducted with coprocessing the surfactant and the Ni-Mo catalyst. These experiments showed that high conversions and product quality can be maintained at milder processing conditions. Based on results of the autoclave test runs, the overall product values were obtained for two stage reactors …
Date: March 31, 1994
Creator: Hickey, G. S. & Sharma, P. K.
System: The UNT Digital Library
Hydrogeochemical and Stream Sediment Detailed Geochemical Survey for Sonora Pass, California (open access)

Hydrogeochemical and Stream Sediment Detailed Geochemical Survey for Sonora Pass, California

The following report presents results of the Sonora Pass, California detailed geochemical survey. Field and laboratory data are presented for 15 groundwater and 701 stream sediment samples.
Date: July 31, 1980
Creator: Butz, T. R.; French, J. H.; Bard, C. S.; Leimer, H. W.; Helgerson, R. N.; Grimes, J. G. et al.
System: The UNT Digital Library
The Death Valley Expedition: A Biological Survey of Parts of California, Nevada, Arizona, and Utah, Part 2 (open access)

The Death Valley Expedition: A Biological Survey of Parts of California, Nevada, Arizona, and Utah, Part 2

Collection of reports on Death Valley, the bordering region of California, Nevada, Arizona, and Utah. Reports include birds, reptiles and Batrachians, fishes, insects, mollusks, trees and shrubs, cactuses and yuccas, and list of localities in the reports.
Date: May 31, 1893
Creator: Fisher, A. K.; Stejneger, Leonhard; Gilbert, Charles H.; Riley, C. V.; Stearns, R. E. C.; Merriam, C. Hart et al.
System: The UNT Digital Library
Final Report: Natural State Models of The Geysers Geothermal System, Sonoma County, California (open access)

Final Report: Natural State Models of The Geysers Geothermal System, Sonoma County, California

Final project report of natural state modeling effort for The Geysers geothermal field, California. Initial models examined the liquid-dominated state of the system, based on geologic constraints and calibrated to match observed whole rock delta-O18 isotope alteration. These models demonstrated that the early system was of generally low permeability (around 10{sup -12} m{sup 2}), with good hydraulic connectivity at depth (along the intrusive contact) and an intact caprock. Later effort in the project was directed at development of a two-phase, supercritical flow simulation package (EOS1sc) to accompany the Tough2 flow simulator. Geysers models made using this package show that ''simmering'', or the transient migration of vapor bubbles through the hydrothermal system, is the dominant transition state as the system progresses to vapor-dominated. Such a system is highly variable in space and time, making the rock record more difficult to interpret, since pressure-temperature indicators likely reflect only local, short duration conditions.
Date: December 31, 2001
Creator: Brikowski, T. H.; Norton, D. L. & Blackwell, D. D.
System: The UNT Digital Library
National Security Commission on Artificial Intelligence: Initial Report (open access)

National Security Commission on Artificial Intelligence: Initial Report

A brief report summarizing the National Security Commission on Artificial Intelligence's activities, meetings, relationships with the U.S. Government, industry, and academia, early substantive assessments, commission staff, and next steps.
Date: July 31, 2019
Creator: National Security Commission on Artificial Intelligence (U.S.)
System: The UNT Digital Library