Resource Type

6 Matching Results

Results open in a new window/tab.

Current results of the tandem mirror experiment (open access)

Current results of the tandem mirror experiment

The basic operating characteristics of the Tandem Mirror Experiment, (TMX) at the Lawrence Livermore Laboratory in the USA have been established. Tandem-mirror plasmas have been produced using neutral-beam-fueled end plugs and a gas-fueled center cell. An axial potential well between the end plugs has been measured. There is direct evidence that this potential well enhances the axial confinement of the center-cell ions. The observed densities and loss currents are consistent with preliminary studies of the particle sources and losses near the magnetic axis. The observed confinement is consistent with theory when plasma fluctuations are low. When the requirement of drift-cyclotron loss-cone mode stability is violated, the plasma fluctuations degrade the center-cell confinement.
Date: April 9, 1980
Creator: Drake, R. P.
System: The UNT Digital Library
Hybrid reactors. [Fuel cycle] (open access)

Hybrid reactors. [Fuel cycle]

The rationale for hybrid fusion-fission reactors is the production of fissile fuel for fission reactors. A new class of reactor, the fission-suppressed hybrid promises unusually good safety features as well as the ability to support 25 light-water reactors of the same nuclear power rating, or even more high-conversion-ratio reactors such as the heavy-water type. One 4000-MW nuclear hybrid can produce 7200 kg of /sup 233/U per year. To obtain good economics, injector efficiency times plasma gain (eta/sub i/Q) should be greater than 2, the wall load should be greater than 1 MW.m/sup -2/, and the hybrid should cost less than 6 times the cost of a light-water reactor. Introduction rates for the fission-suppressed hybrid are usually rapid.
Date: September 9, 1980
Creator: Moir, Ralph W.
System: The UNT Digital Library
Progress in direct heat applications projects (open access)

Progress in direct heat applications projects

The development of hydrothermal energy for direct heat applications is being aided by twenty-two demonstration projects that are funded on a cost-sharing basis by the US Department of Energy, Division of Geothermal Energy. These projects are designed to demonstrate the technical and economic feasibility of the direct use of geothermal heat in the United States. Twelve of these projects are administered by the DOE-Idaho Operations Office with technical support from EG and G Idaho, Inc. Engineering and economic data for these projects are summarized in this paper. The data and experience being generated by these projects will be an important basis for future geothermal direct use projects.
Date: September 9, 1980
Creator: Childs, F. W.; Jones, K. W.; Nelson, L. B.; Strawn, J. A. & Tucker, M. K.
System: The UNT Digital Library
Relationship between the DOE loan guaranty and California Environmental Quality Act environmental review processes (open access)

Relationship between the DOE loan guaranty and California Environmental Quality Act environmental review processes

The US Department of Energy (DOE) is involved in numerous geothermal research, development, demonstration, and loan guaranty projects in the State of California. These projects often require the preparation of both an Environmental Impact Report (EIR), as required by California Environmental Quality Act (CEQA), and an Environmental Assessment (EA) or Impact Statement (EIS) as required under NEPA. DOE adoption or utilization of information contained in EIR's to meet that agency's NEPA requirements and thereby reduce duplication of effort is dependent on four critical issues: (1) the scope of the proposed action analyzed, (2) the completeness of treatment of environmental issues, (3) the level of DOE involvement in EIR preparation, and (4) the timing of DOE involvement in EIR preparation. At this time, several constraints prevent the integration of the DOE Loan Guaranty and CEQA environmental review and documentation processes. First, the time required to complete an EIR (up to 2 years in some cases) is not compatible with DOE's goal of processing loan guaranty applications within a 4 month period. Second, the CEQA process is usually initiated and completed prior to DOE's involvement in the project. Therefore, DOE often has no role in document preparation and must verify the content …
Date: September 9, 1980
Creator: Mezga, L. J. & Brechbill, R. A.
System: The UNT Digital Library
Buildup studies of a tandem mirror reactor with inboard thermal barriers (open access)

Buildup studies of a tandem mirror reactor with inboard thermal barriers

The build-up and quasi-steady state phases of the operation of the tandem mirror experiment, TMX, and of a tandem mirror machine with inboard thermal barriers, MFTF-B, have been simulated using a fluid model of the central cell and plug plasmas. The fluid model incorporates classical radial transport, three-dimensional cold gas transport in cylindrical geometry, and neutral beam transport corrected for finite-Larmor-orbit effects in both the central cell and yin yang end plugs.
Date: October 9, 1980
Creator: Gryczkowski, G. E. & Gilmore, J. M.
System: The UNT Digital Library
Maintaining ideal body weight counseling sessions (open access)

Maintaining ideal body weight counseling sessions

The purpose of this program is to provide employees with the motivation, knowledge and skills necessary to maintain ideal body weight throughout life. The target audience for this program, which is conducted in an industrial setting, is the employee 40 years of age or younger who is at or near his/her ideal body weight.
Date: October 9, 1980
Creator: Brammer, S. H.
System: The UNT Digital Library