Resource Type

[Stresses in Reinforced Nozzle-Cylinder Attachments Under External Moment Loadings Analyzed by the Finite-Element Method: A Parameter Study: Stress Values]

The following data presents stress value results from finite-element mesh studies described in its parent document, Stresses in Reinforced Nozzle-Cylinder Attachments Under External Moment Loadings Analyzed by the Finite-Element Method: A Parameter Study.
Date: 1979
Creator: Bryson, J. W.; Johnson, W. G. & Bass, B. R.
System: The UNT Digital Library

[Power Calibration and Preconditioning Data Plots]

Power calibration and preconditioning data plots for PBF/LOFT Lead Rod Test Series, indicating the time after start of power calibration in hours with each variable.
Date: October 1979
Creator: Buckland, Russell J. & Schwieder, David H.
System: The UNT Digital Library

[Power Calibration and Preconditioning Data Measurements for Reactivity Initiated Accident (RIA) Test Series 1, Test RIA 1-2]

Graphs showing power calibration and preconditioning data for the second of six planned tests in the Reactivity Initiated Accident (RIA) Test Series 1, Test RIA 1-2. Results are presented for the time after the start of power calibration in hours for each variable (see pages ix - xi of report).
Date: June 1979
Creator: EG & G Idaho
System: The UNT Digital Library