Serial/Series Title

Criticality Conditions for 1.75 Per Cent Enriched Uranium Slugs (open access)

Criticality Conditions for 1.75 Per Cent Enriched Uranium Slugs

Abstract: "A batch of slugs is being prepared for which the U-235 content will be 1.75 per cent, and it is of interest to calculate the minimum number of such slugs required for a critical assembly in water. Using Handbook (CL-697) methods, a critical assembly of these slugs arranged in a lattice with a spacing of 5.5 cm."
Date: September 11, 1952
Creator: Erkman, John O.
System: The UNT Digital Library
Metallurgical Evaluation of the Uranium Rods Rolled for the Chalk River Pile Test (open access)

Metallurgical Evaluation of the Uranium Rods Rolled for the Chalk River Pile Test

Summary: "The laboratory data collected during the metallurgical evaluation of these rods indicate that lower rolling temperatures increased the ultimate and yield strength, the amount of cold work, and the degree of preferred orientation existing in these uranium rods."
Date: September 11, 1952
Creator: Sanderson, M. J. & Hueschen, R. E.
System: The UNT Digital Library
Functional Testing and Operating Manual for Consolidated Helium Leak Detector, Model 24-101A (open access)

Functional Testing and Operating Manual for Consolidated Helium Leak Detector, Model 24-101A

A pile gas leak detection system consisting of a purchased mass spectrographic type of helium detector, a long sampling line for use in remote or relatively inaccessable locations, a pump to pull a continuous sample of gas from the tip of the probe to the detector, and a rotameter to measure the gas flow rate in the sampling line has been developed, calibrated, operationally tested. The system is practical for use in locating all pile gas leaks larger than about 0.1 cubic foot per hour.
Date: September 11, 1953
Creator: Spencer, H. G.
System: The UNT Digital Library