Language

0-2 kv Flash Tube Supplies (open access)

0-2 kv Flash Tube Supplies

In order to perform the various experiments with a bubble chamber, a high intensity flash tube is used. This report briefly describes the power supplies designed and constructed to power these lamps.
Date: March 15, 1962
Creator: Miller, D. M.
Object Type: Report
System: The UNT Digital Library
6 kv Capacitor Charging Supply (open access)

6 kv Capacitor Charging Supply

The power supplies designed and constructed to power high intensity flash tubes used in bubble chamber experiments are briefly described and are accompanied by a schematic diagram of the layout. (D.C.W.)
Date: March 15, 1962
Creator: Miller, D. M.
Object Type: Report
System: The UNT Digital Library
30 Megawatt Heat Exchanger and Steam Generator for Sodium Cooled Reactor System: Volume 4, Operation and Maintenance Procedures (open access)

30 Megawatt Heat Exchanger and Steam Generator for Sodium Cooled Reactor System: Volume 4, Operation and Maintenance Procedures

Operation and maintenance procedures for 30 megawatt heat exchanger and steam generator for sodium cooled reactor system.
Date: May 15, 1962
Creator: Alco Products (Firm)
Object Type: Report
System: The UNT Digital Library
100-Ton Test : Measurement of the Velocity of Sound (open access)

100-Ton Test : Measurement of the Velocity of Sound

Abstract: The velocity of sound at the time of 100-ton shot at Trinity was measured to be 1116.1 ft/sec. Values of blast pressure computed from the excess velocity are given, but are not considered as reliable.
Date: June 15, 1945
Creator: Barschall, H. H. & Martin, G.
Object Type: Report
System: The UNT Digital Library
Absorption by Soil of Strontium From 216-S Crib Waste (open access)

Absorption by Soil of Strontium From 216-S Crib Waste

A preliminary soil column experiment with a waste sample from the 207-S-11 well, which monitors the 216-S cribs, indicated that cesium was absorbed almost completely by the soil but that strontium breakthrough to ground water in the near future seemed likely. Accordingly, it was suggested that the 216-S wastes be discharged to a new disposal site, and that samples of the wastes which are currently being discharged to the 216-S cribs be obtained for soil absorption tests. The primary purpose of these tests was to obtain data which could be used to suggest ways and means of improving the absorption of strontium by soil from the process condensate stream (D-2_ and the cell drainage stream (D-1), both of which have been discharged to the 216-S cribs for the past several months.
Date: February 15, 1956
Creator: Rhodes, D. W.
Object Type: Report
System: The UNT Digital Library
ABWR: PL-2 Design Report (open access)

ABWR: PL-2 Design Report

From preface: This report satisfies the quarterly progress report requirements for PL-1 and PL-2 plant design work for the period ending September 30, 1960 At present time a SL-1 Core 2 is under construction. This is a replacement core for SL-1 (ALPR) and will be identical to a PL-2 core; a PL condenser is under test at the SL-1 facility; final construction plans for PL components and modules which are not site sensitive will be completed in March 1961.
Date: October 15, 1960
Creator: Combustion Engineering, inc. Nuclear Division.
Object Type: Report
System: The UNT Digital Library
ABWR Design and Development Quarterly Progress Report, January 1 Through March 31, 1962 (open access)

ABWR Design and Development Quarterly Progress Report, January 1 Through March 31, 1962

Quarterly design and development progress report on the activities of the Army Boiling Water Reactor (ABWR) Program.
Date: April 15, 1962
Creator: Combustion Engineering, inc. Nuclear Division.
Object Type: Report
System: The UNT Digital Library
Accumulation and Distribution of Radioactive Strontium, Barium-Lanthanum, Fission Mixture and Sodium in Goldfish (open access)

Accumulation and Distribution of Radioactive Strontium, Barium-Lanthanum, Fission Mixture and Sodium in Goldfish

This report details an experiment undergone to determine the amount of radioactive strontium, barium-lanthanum, fission mixture, and sodium accumulated by and distributed within non-feeding goldfish. The report includes tables detailing the findings.
Date: February 15, 1945
Creator: Prosser, C. Ladd (Clifford Ladd), 1907-2002; Pervinsek, William; Arnold, Jane; Svihla, George & Tompkins, P. C.
Object Type: Report
System: The UNT Digital Library
The Acute Radiotoxicity of Injected Na²⁴ for Mice and Rats (open access)

The Acute Radiotoxicity of Injected Na²⁴ for Mice and Rats

The following report describes the results from studies based on the toxicity and metabolism of radioactive substances derived from uranium fission. Rats and mice were administered radioactive sodium and reactions and changes were studied.
Date: April 15, 1948
Creator: Finkle, R. D.; Snyder, R. H.; Kisieleski, Walter E.; Teresi, J.; Broido, A. & Tompkins, P. C.
Object Type: Report
System: The UNT Digital Library
Additional comparisons between computed and measured transonic drag-rise coefficients at zero lift for wing-body-tail configurations (open access)

Additional comparisons between computed and measured transonic drag-rise coefficients at zero lift for wing-body-tail configurations

From Introduction: "This report makes further comparisons of the theoretical computing method with available experimental results, showing effects of wing plan-form changes, and the effect of an airfoil-section change on a wing of given plan form."
Date: August 15, 1955
Creator: Holdaway, George H.
Object Type: Report
System: The UNT Digital Library
Adenosinetriphosphate Cleavage During the G-Actin to F-Actin Transformation and the Binding of Adenosinetriphosphate to F-Actin (open access)

Adenosinetriphosphate Cleavage During the G-Actin to F-Actin Transformation and the Binding of Adenosinetriphosphate to F-Actin

Since the discovery of the Straub and Feuer as well as Laki et al. that ATP bound to G-actin is transformed to ADP and inorganic phosphate during polymerization of actin (1, 2), it has become increasingly clear that the chemical changes in the nucleotide are related to the change in the physical state of the protein. Barany, Biro, Molnar and Straub have shown that highly purified actin preparation free of any enzyme which would use ATP, ADP or AMP as a substrate still catalyze the breakdown of ATP (3) thus supporting the original idea that the ATP to ADP transformation is related to the globular to fibrous transformation of the actin protein itself. Mommaerts was the first to show that the ADP formed during polymerization remains bound to F-actin and Ulbrecht et al. while extending Mommaert's finding on exhaustively purified actin preparations have shown that the P1 formed during polymerization is not bound to F-actin. The stoichiometry of the splitting and the tightness of binding of the ADP lead inevitably to questions in regard to the position of bond breaking during the hydrolysis and to the nature of the forces involved in the tight binding of ADP to F-actin. To …
Date: October 15, 1963
Creator: Barany, M.; Koshland, D. E., Jr.; Springhorn, S. S.; Finkleman, F. & Theratil-Anthony, T.
Object Type: Report
System: The UNT Digital Library
An Advanced Sodium-Graphite Reactor Nuclear Power Plant (open access)

An Advanced Sodium-Graphite Reactor Nuclear Power Plant

Abstract: This report describes an advanced sodium-cooled, graphite-moderated nuclear power plant which utilizes high-pressure, high-temperature steam to generate electricity at a high thermal efficiency.
Date: March 15, 1960
Creator: Churchill, J. R. & Renard, J.
Object Type: Report
System: The UNT Digital Library
Aerial Radiometric and Magnetic Survey: Baker National Topographic Map, Idaho and Oregon, Volume 1 (open access)

Aerial Radiometric and Magnetic Survey: Baker National Topographic Map, Idaho and Oregon, Volume 1

Final report documenting a high-sensitivity airborne gamma radiation and magnetic field survey of the Baker National Topographic Map segment (NL 11-11 quadrangle) including a description of the program and results.
Date: February 15, 1978
Creator: Geodata International
Object Type: Report
System: The UNT Digital Library
Aerial Radiometric and Magnetic Survey: Reno National Topographic Map, Nevada, Volume 1 (open access)

Aerial Radiometric and Magnetic Survey: Reno National Topographic Map, Nevada, Volume 1

The following report is the first of two volumes describing the program and results of the airborne gamma and total magnetic field surveys of the Reno quadrangle conducted between October 4-November 10, 1977.
Date: May 15, 1978
Creator: Geodata International
Object Type: Report
System: The UNT Digital Library
Aerial Radiometric and Magnetic Survey: Walker Lake National Topographic Map, Nevada and California, Volume 1 (open access)

Aerial Radiometric and Magnetic Survey: Walker Lake National Topographic Map, Nevada and California, Volume 1

Final report documenting a high-sensitivity airborne gamma radiation and magnetic field survey of the Walker Lake National Topographic Map segment (NJ 11-4 quadrangle) including a description of the program and results.
Date: March 15, 1978
Creator: Geodata International
Object Type: Report
System: The UNT Digital Library
Aerodynamic characteristics at transonic speeds of a wing having a 45 degree sweep, aspect ratio 8, taper ratio 0.45, and airfoil sections varying from the NACA 63A010 section at the root to the NACA 63A006 section at the tip. (open access)

Aerodynamic characteristics at transonic speeds of a wing having a 45 degree sweep, aspect ratio 8, taper ratio 0.45, and airfoil sections varying from the NACA 63A010 section at the root to the NACA 63A006 section at the tip.

Report presenting an investigation in the 7- by 10-foot tunnel to determine the transonic aerodynamic characteristics of a wing with a spanwise variation in thickness ratio. The wings investigated had 45 degrees of sweepback, aspect ratio 8, taper ratio 0.45, and airfoil sections tapered from an NACA 63A010 section at the root chord to an NACA 63A006 section at the tip chord. Results regarding lift characteristics, drag characteristics, and pitching-moment characteristics are provided.
Date: January 15, 1952
Creator: Morrison, William D., Jr. & Fournier, Paul G.
Object Type: Report
System: The UNT Digital Library
Aerodynamic Loads on an External Store Adjacent to a 45 Degree Sweptback Wing at Mach Numbers From 0.70 to 1.96, Including an Evaluation of Techniques Used (open access)

Aerodynamic Loads on an External Store Adjacent to a 45 Degree Sweptback Wing at Mach Numbers From 0.70 to 1.96, Including an Evaluation of Techniques Used

"Aerodynamic forces and moments have been obtained in the Langley 9- by 12-inch blowdown tunnel on an external store and on a 45 degree swept-back wing-body combination measured separately at Mach numbers from 0.70 to 1.96. The wing was cantilevered and had an aspect ratio of 4.0; the store was independently sting-mounted and had a Douglas Aircraft Co. (DAC) store shape. The angle of attack range was from -3 degrees to 12 degrees and the Reynolds number (based on wing mean aerodynamic chord) varied from 1.2 x10(6) to 1.7 x 10(6)" (p. 1).
Date: November 15, 1955
Creator: Guy, Lawrence D. & Hadaway, William M.
Object Type: Report
System: The UNT Digital Library
Aerodynamic Study of a Wing-Fuselage Combination Employing a Wing Swept Back 63 Degrees: Characteristics Throughout the Subsonic Speed Range With the Wing Cambered and Twisted for a Uniform Load at a Lift Coefficient of 0.25 (open access)

Aerodynamic Study of a Wing-Fuselage Combination Employing a Wing Swept Back 63 Degrees: Characteristics Throughout the Subsonic Speed Range With the Wing Cambered and Twisted for a Uniform Load at a Lift Coefficient of 0.25

Report presenting wind-tunnel testing to determine the independent effects of Mach and Reynolds numbers on the aerodynamic characteristics of a wing-fuselage combination with a wing with the leading edge swept back 63 degrees and with camber and twist. Results regarding the fuselage alone and the effects of camber and twist are also provided.
Date: August 15, 1949
Creator: Jones, J. Lloyd & Demele, Fred A.
Object Type: Report
System: The UNT Digital Library
AGS Performance and Plans (open access)

AGS Performance and Plans

The scope of the AGS complex has expanded rapidly during the three years since an accelerated beam was first obtained. Demand for research time far exceeds the amount available although facilities have been much increased. At the same time, experiments are being designed which are more complicated than previous ones and which make more stringent demands on the accelerator and on its auxiliary equipment. There is a continuous trend of experiments to particle beams of greater momentum, as the experimental techniques are refined. This use of increased momentum means that larger areas are required for the apparatus and that more power is necessary for the magnetic optics. All beam-sharing at the AGS is done by multiple use of each accelerated pulse because our experience indicates that pulse-by-pulse beam-sharing is relatively inefficient. (Expansion chambers have seldom been used at the AGS.) The problems of scheduling experiments becomes increasingly complex since combinations must be found satisfying the criteria: maximum number of experiments to run simultaneously; minimum downtime to be taken for rearrangement between successive experimental arrays
Date: October 15, 1963
Creator: Green, G. K.
Object Type: Report
System: The UNT Digital Library
The Air-Launched Balloon System (ALBS) Development Program, Phase 2 (open access)

The Air-Launched Balloon System (ALBS) Development Program, Phase 2

Abstract: The circumstances leading to the second phase of the Air-Launched Balloon System Development Program are described, along with the governing design constraints. Individual component development efforts and system design modifications are described in turn: the procurement and testing of the new dewar, the qualification of the updated cryogenic unit recovery system. The complicated command, control, and telemetry subsystem is also described in detail. The results of component tests and a system dress rehearsal system tests are summarized. Preparations for two full-scale system tests conducted in 1981 are covered in considerable detail. The results of those tests are presented and the test data are analyzed. It is concluded that the system's air-launch and mid-air inflation techniques are acceptable. The balloon requires structural reinforcements, however, before the system can be said to be fully developed.
Date: December 15, 1981
Creator: Carten, Andrew S., Jr.
Object Type: Report
System: The UNT Digital Library
Aircraft Accidents: Method of Analysis (open access)

Aircraft Accidents: Method of Analysis

From Introduction Purpose and Organization: "This report on a method of analysis of aircraft accidents has been prepared by a special committee on the nomenclature, subdivision, and classification of aircraft accidents organized by the National Advisory Committee for Aeronautics in response to a request dated February 18, 1928, from the Air Coordination Committee consisting of the Assistant Secretaries for Aeronautics in the Departments of War, Navy, and Commerce."
Date: August 15, 1928
Creator: Special Committee on the Nomenclature, Subdivision, and Classification of Aircraft Accidents
Object Type: Report
System: The UNT Digital Library
An Algorithm for Construction Feasible Schedules and Computing Their Schedule Times (open access)

An Algorithm for Construction Feasible Schedules and Computing Their Schedule Times

"An algorithm for the generation of feasible schedules and the computation of the completion times of the job operations of feasible schedule is presented. Using this algorithm, the distribution of schedule times over the set of feasible schedule—or a subset of feasible schedules—was determined for technological orderings that could occur in a general machine shop. These distributions are found to be approximately normal. Biasing techniques corresponding to “first come first serve,” random choice of jobs ready at each machine and combinations of these two extremes were used to compute distributions of schedule times."
Date: November 15, 1960
Creator: Heller, Jack & Logemann, George
Object Type: Report
System: The UNT Digital Library
Alkali Metal Physical Properties Program at Pratt & Whitney Aircraft-CANEL (open access)

Alkali Metal Physical Properties Program at Pratt & Whitney Aircraft-CANEL

The favorable combination of physical properties such as heat capacity, viscosity, electrical resistivity, thermal conductivity and high temperature liquid range make alkali metals, in principle, among the best heat transfer fluids available for use in nuclear reactor and other esoteric powerplant systems. Unfortunately, many of these properties are not known with sufficient certainty in the high temperature region to permit optimization of design criteria for developing maximum efficiency coolant systems. For this reason, Pratt & Whitney Aircraft-CANEL, have been concerned for some time in extending the physical properties data of alkali liquid metals in the high temperature region. A supplemental program is being initiated to study some of the properties of alkali metals in the gas phase. This information is required for designing systems where the alkali vapor is the working fluid. In addition, programs are under way to study the solubility of noble gases in alkali liquid metals and wetting characteristics of these liquid metals with structural materials.
Date: June 15, 1962
Creator: Kapelner, S. M. & Cleary, Robert E., 1920-
Object Type: Report
System: The UNT Digital Library
The Alpha Half-Life of the Isotope Pu-241 (open access)

The Alpha Half-Life of the Isotope Pu-241

A plutonium solution of known Pu-241 content was purified by solvent extraction techniques to remove uranium and americium impurities. Portions of this purified solution were then analyzed for U-237 as a function of time. Since the growth of U-237 occurs directly by the alpha decay of Pu-241, these measurements provided sufficient data for calculation of the Pu-241 alpha half-life, which was found to be 2.91 ± 0.50 x 10⁵ years.
Date: February 15, 1955
Creator: Gift, M. W.
Object Type: Report
System: The UNT Digital Library