100 Areas, January 1 through January 7, 1946
During this period the B Pile operated at its assigned power level of 25 MW below rated level, except for 10 hours on January 5. The operating level of the D Pile remained at 25 MW below rating. The rate gain in excess reactivity during equilibrium operation has been about 1.8 inhours/day. On January 1, the power level of the F Pile was dropped to 25 MW below rating from its previous rated level. Rod A was in a favorable position to make a determination of the reactivity coefficients at the time. The data does indicate an upper limit of {minus}0.21 ih/MW for the metal coefficient. An overall coefficient of 0.20 ih/MW was obtained. The unit was shut down on January 3 for discharge of 129 tubes of metal. A summary of the present reactivity states of the B, D, and F Piles are given. Iron content of process water for the three piles is also given.
Date:
January 11, 1946
Creator:
Jordan, W. E.
System:
The UNT Digital Library
The Control of the HF Concentration of Electrolyte by Electrical Conductance Measurements. Problem Report for Period February 23, 1944 to November 27, 1944
None
Date:
January 11, 1945
Creator:
Turnbull, S. G., Jr.
System:
The UNT Digital Library
METALLURGY DIVISION PROGRESS REPORT FOR THE PERIOD DECEMBER 30 1944 TO JANUARY 6, 1945
None
Date:
January 11, 1945
Creator:
unknown
System:
The UNT Digital Library
Rough notes, coefficient tests, original data
This report provides the original data in the form of rough notes for production reactor coefficient tests.
Date:
January 11, 1945
Creator:
Menegus, R. L.
System:
The UNT Digital Library