Language
6 Matching Results
Results open in a new window/tab.
Results:
1 - 6 of
6
ENGINEERING B DATA PITCHBLENDE PROCESSING ENGINEERING . Progress Report II Covering the Period April 2 to May 11, 1945
None
Date:
May 15, 1945
Creator:
Miller, E.I.
System:
The UNT Digital Library
Interim report No. 2 on Production Test No. 105-17-P, Laboratory evaluation of proposed lubricants
The lubricant (Calel A-60) used to reduce pushing forces when discharging slugs from pile tubes forms a cloudy emulsion with water. During the initial period of operation at 100 B and D areas, spillage of lubricant during discharge produced so much cloudiness in the basin water that it interfered with sorting operations. An investigation was started to see if a lubricant could be found that would effectively lubricate tubes during discharge and which would form optically clear systems when mixed with water. This report presents the data on a number of lubricants which were suggested for test.
Date:
May 15, 1945
Creator:
Bankoff, S. G.
System:
The UNT Digital Library
PITCHBLENDE PROCESSING DEVELOPMENT. PRELIMINARY TESTS ON OLIVER FILTER, BATCHES S-104 INCLUSIVE
None
Date:
October 15, 1945
Creator:
Ritchie, C.F.
System:
The UNT Digital Library
Production of Finished Metal
None
Date:
August 15, 1945
Creator:
Thompson, Dr. J. G.
System:
The UNT Digital Library
The Solubility of Sodium Uranyl Carbonate
None
Date:
July 15, 1945
Creator:
Mundy, R. J. & Bunce, W. E.
System:
The UNT Digital Library
The Solvent Extraction of Pu(Iv) by Trifluoroacetylacetone
None
Date:
January 15, 1945
Creator:
Crandall, H. W.; Thomas, J. R. & Reid, J.C.
System:
The UNT Digital Library