Language

Actinide chemistry research supporting the Waste Isolation Pilot Plant (WIPP): FY94 results (open access)

Actinide chemistry research supporting the Waste Isolation Pilot Plant (WIPP): FY94 results

This document contains six reports on actinide chemistry research supporting the Waste Isolation Pilot Plant (WIPP). These reports, completed in FY94, are relevant to the estimation of the potential dissolved actinide concentrations in WIPP brines under repository breach scenarios. Estimates of potential dissolved actinide concentrations are necessary for WIPP performance assessment calculations. The specific topics covered within this document are: the complexation of oxalate with Th(IV) and U(VI); the stability of Pu(VI) in one WIPP-specific brine environment both with and without carbonate present; the solubility of Nd(III) in a WIPP Salado brine surrogate as a function of hydrogen ion concentration; the steady-state dissolved plutonium concentrations in a synthetic WIPP Culebra brine surrogate; the development of a model for Nd(III) solubility and speciation in dilute to concentrated sodium carbonate and sodium bicarbonate solutions; and the development of a model for Np(V) solubility and speciation in dilute to concentrated sodium Perchlorate, sodium carbonate, and sodium chloride media.
Date: August 1995
Creator: Novak, C. F.
Object Type: Report
System: The UNT Digital Library
Active Sites Environmental Monitoring Program FY 1994 annual report (open access)

Active Sites Environmental Monitoring Program FY 1994 annual report

Chapter III of the US Department of Energy (DOE) Order 5820.2A (DOE 1988) specifies requirements for the management of facilities that were used for the disposal of radioactive solid low-level waste (LLW) on or after the date of the order (September 26, 1988). Activities in Solid Waste Storage Area (SWSA) 6 at Oak Ridge National Laboratory (ORNL) are governed by Chapter III. Chapter II of 5820.2A covers the transuranic (TRU) waste storage areas in SWSA 5 North at ORNL. Both chapters require environmental monitoring to provide early warning of leaks before such leaks pose a threat to human health or the environment. Chapter III also requires the monitoring of LLW disposal facilities so that their performance can be evaluated. In order to comply with this Order, the Environmental Sciences Division (ESD) at ORNL implements the Active Sites Environmental Monitoring Program (ASEMP) for the Radioactive Solid Waste Operations (RSWO) Department within the Waste Management and Remedial Action Division (WMRAD) at ORNL. The scope of the ASEMP includes all ORNL waste disposal sites that were active on or after the date of the Order and that are under the operational control of the RSWO Department of WMRAD. This report continues a series …
Date: April 1998
Creator: Morrissey, C. M. & Cunningham, G. R.
Object Type: Report
System: The UNT Digital Library
Annual report to Congress on Federal Government energy management and conservation programs, Fiscal year 1994 (open access)

Annual report to Congress on Federal Government energy management and conservation programs, Fiscal year 1994

This report provides sinformation on energy consumption in Federal buildings and operations and documents activities conducted by Federal agencies to meet statutory requirements of the National Energy Conservation Policy Act. It also describes energy conservation and management activities of the Federal Government under section 381 of the Energy Policy and Conservation Act. Implementation activities undertaken during FY94 by the Federal agencies under the Energy Policy Act of 1992 and Executive Orders 12759 and 12902 are also described. During FY94, total (gross) energy consumption of the US Government, including energy consued to produce, process, and transport energy, was 1.72 quadrillion Btu. This represents {similar_to}2.0% of the total 85.34 quads used in US.
Date: October 6, 1995
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Application of modern diagnostic methods to environmental improvement. Annual progress report, January--October 1994 (open access)

Application of modern diagnostic methods to environmental improvement. Annual progress report, January--October 1994

The Diagnostic Instrumentation and Analysis Laboratory (DIAL), a research department in the College of Engineering at Mississippi State University (MSU), is under contract with the US Department of Energy (DOE) to develop and apply advanced diagnostic instrumentation and analysis techniques to real world processes; measurements are made in hot, highly corrosive atmospheres in which conventional measurement devices are ineffective. Task 1 of this agreement is concerned with the development and application of various diagnostic methods to characterize the plasma properties, the melt properties and the downstream emissions from a plasma torch facility designed to vitrify mixed waste. Correlation of the measured properties with the operating parameters of the torch will be sought to improve, optimize and control the overall operation of the plasma treatment process. As part of this program, diagnostic methods will be developed and evaluated for characterization, monitoring and control purposes of treatment processes in general. Task 2 of this agreement is concerned with the development of a system to monitor and control the combustion stoichiometry in real time in order to minimize environmental impact and maximize process efficiency. Staged fuel injection is also being studied to minimize NO{sub x} formation.
Date: December 1, 1994
Creator: Shepard, W. S.
Object Type: Report
System: The UNT Digital Library
Computer Applications Group Inc., Final report FY93 and FY94. Volume 3 (open access)

Computer Applications Group Inc., Final report FY93 and FY94. Volume 3

This report presents data pertaining to the geologic mapping of the Yucca Mountain Exploratory Studies facility. Topics discussed include; investigation plans, investigation controls, order of performing multiple investigations, and references to the design requirements of the exploratory studies facility.
Date: December 15, 1994
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Cryocycling of energetic materials: Status report for FY94 (open access)

Cryocycling of energetic materials: Status report for FY94

The Cryocycling of Energetic Materials Project is sponsored by the Memorandum of Understanding (MOU) on advanced munition technologies. This MOU is an agreement between the Department of Energy and the Department of Defense (Office of Munitions) that facilitates the development of technologies of mutual interest to the two Departments. The cryocycling project is one of several that focus on demilitarization aspects of conventional weapons and weapon systems. During FY94 the project pursued the development of analytical and numerical models that can be used to describe and optimize the cryocycling process for preparing energetic materials for recycle and reuse. In addition, the demilitarization stockpile of the Department of Defense was analyzed to identify candidate munitions for the process, and pilot scale cryocycling operations were begun at an industrial contractor. When a material is cryocycled, it is repeatedly subjected to cycles of rapid cooling in a liquid nitrogen bath at 77 K followed by warming to ambient temperature. In laboratory and pilot scale demonstrations, the authors have shown that cryocycling can dramatically reduce the size of a variety of propellant grains and a number of cast and plastic bonded explosives.
Date: July 1, 1995
Creator: Lipkin, J.; Kasberg, D.; Whinnery, L.; Handrock, J.; Revelli, V.; Weingarten, L. et al.
Object Type: Report
System: The UNT Digital Library
Department of Energy Information Technology Resources Long-Range Plan: Fiscal Years 1991-1995 (open access)

Department of Energy Information Technology Resources Long-Range Plan: Fiscal Years 1991-1995

The Department of Energy has consolidated its plans for Information Systems, Computing Resources, and Telecommunications into a single document, the Information Technology Resources Long-Range Plan. The consolidation was done as a joint effort by the Office of ADP Management and the Office of Computer Services and Telecommunications Management under the Deputy Assistant Secretary for Administration, Information, and Facilities Management. This Plan is the product of a long-range planning process used to project both future information technology requirements and the resources necessary to meet those requirements. It encompasses the plans of the various organizational components within the Department and its management and operating contractors over the next 5 fiscal years, 1991 through 1995.
Date: December 1, 1989
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Detection and Quantitative Analysis of Chemical Species in Hanford Tank Materials Using Raman Spectroscopy Technology: FY94, January 1, 1994--March 31, 1995 (open access)

Detection and Quantitative Analysis of Chemical Species in Hanford Tank Materials Using Raman Spectroscopy Technology: FY94, January 1, 1994--March 31, 1995

This report provides a summary of work completed in FY-94 by FSU to develop and investigate the feasibility of using Raman spectroscopy with Hanford tank waste materials. Raman performance impacts from sample morphology, including the effects of absorption, particle size, density, color and refractive index, are discussed. An algorithm for relative species concentration measurement from Raman data is presented. An Algorithm for applying Raman to tank waste core screening is presented and discussed. A library of absorption and Raman spectra are presented that support this work.
Date: September 12, 1995
Creator: Vickers, T.J. & Mann, C.
Object Type: Report
System: The UNT Digital Library
Detection and Quantitative Analysis of Chemical Species in Hanford Tank Materials Using Raman Spectroscopy Technology: FY94Florida State University Raman Spectroscopy Report (open access)

Detection and Quantitative Analysis of Chemical Species in Hanford Tank Materials Using Raman Spectroscopy Technology: FY94Florida State University Raman Spectroscopy Report

This report provides a summary of work completed in FY-94 by FSU to develop and investigate the feasibility of using Raman spectroscopy with Hanford tank waste materials. Raman performance impacts from sample morphology, including the effects of absorption, particle size, density, color and refractive index, are discussed. An algorithm for relative species concentration measurement from Raman data is presented. An Algorithm for applying Raman to tank waste core screening is presented and discussed. A library of absorption and Raman spectra are presented that support this work.
Date: August 11, 1997
Creator: Reich, F.R.
Object Type: Report
System: The UNT Digital Library
Economic Impact Study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado State Fiscal Year 1994 (open access)

Economic Impact Study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado State Fiscal Year 1994

The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994. To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are summarized. This study assesses benefits associated with the Grand Junction, Gunnison, Naturita, and Rifle UMTRA Projects sites for the 1-year period under study. Work at the Naturita site was initiated in April 1994 and involved demolition of buildings at the processing site. Actual start-up of remediation of Naturita is planned to begin in the spring of 1995. Work at the Slick Rock and Maybell sites is expected to begin in 1995. The only current economic benefits associated with these sites are related to UMTRA Project support work.
Date: November 1994
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Economic Impact Study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado State Fiscal Year 1994. Revision 1 (open access)

Economic Impact Study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado State Fiscal Year 1994. Revision 1

The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994 (1 July 1993 through 30 June 1994). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. Information on wages, taxes, and subcontract expenditures in combination with estimates and economic multipliers is used to estimate the dollar economic benefits to Colorado during the state fiscal year. Finally, the fiscal year 1994 estimates are compared to fiscal year 1993 employment and economic information.
Date: December 1994
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Endangered species program Naval Petroleum Reserves in California. Annual report FY94 (open access)

Endangered species program Naval Petroleum Reserves in California. Annual report FY94

In FY94, EG and G Energy Measurements, Inc. (EG and G/EM) continued to support efforts to conserve endangered species and cultural resources at the Naval Petroleum Reserves in California (NPRC). These efforts are conducted to ensure NPRC compliance with regulations regarding the protection of listed species and cultural resources on Federal properties. Population monitoring activities are conducted annually for San Joaquin kit foxes, giant kangaroo rats, blunt-nosed leopard lizards, and Hoover`s wooly star. To mitigate impacts of oil field activities on listed species, 400 preactivity surveys covering approximately 315 acres were conducted in FY94. Mitigation measures implemented as a result of survey findings resulted in avoidance of incidental takes of listed species during construction activities. EG and G/EM also assisted with mitigating effects from third-party projects, primarily by conducting biological and cultural resource consultations with regulatory agencies. Third-party projects in FY94 included three pipeline projects and two well abandonment/clean-up projects. Cultural resource support provided to NPRC consisted primarily of conducting preliminary surveys for cultural resources, and preparing a Cultural Resource Management Plan and Programmatic Agreement for NPR-1. These two documents will be finalized in FY95. EG and G/EM has conducted an applied habitat reclamation program at NPRC since 1985. In …
Date: April 1, 1995
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Experimental results of calcine dissolution studies performed during FY-94,95 (open access)

Experimental results of calcine dissolution studies performed during FY-94,95

Calcine dissolution studies were performed in FY-94,95 in order to extend the knowledge of dissolution and to obtain information necessary for scale-up design and operation. Experiments reported in this document were performed with non-radioactive and actual calcines to generate qualitative data regarding: (a) calcine dissolution rates, (b) undissolved solids settling characteristics, (c) undissolved solids heel formation, and (d) chemical treatments for undissolved solids heel dissolution. The goal of this work was to achieve complete calcine dissolution, or to determine conditions that would result in the maximum calcine dissolution. Small scale laboratory experiments (test-tube dissolutions) and a bench scale dissolver set-up were used in the effort. Results from this work show the bulk of the undissolved solids to settle at a rate of >9 inches per second when the baseline dissolution parameters are used. Baseline dissolution parameters were 100 grams of calcine being dissolved in 1 L of 5 M HNO{sub 3} at > 90 C while the solution is being vigorously and constantly mixed. This work also verified that dissolution is most complete when performed with aggressive mixing. Sequential dissolutions performed with non-radioactive and actual calcine indicate that little undissolved solids heel build-up is expected, and this small heel can …
Date: September 1997
Creator: Brewer, K. N.; Olson, A. L.; Roesener, W. S. & Tonso, J. L.
Object Type: Report
System: The UNT Digital Library
Federal Geothermal Research Program Update Fiscal Year 1994 (open access)

Federal Geothermal Research Program Update Fiscal Year 1994

The DOE Geothermal Research Program Update reports contain a fair amount of technical detail and management information at the individual project level. (DJE 2005)
Date: March 1, 1995
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Ferrocyanide Safety Program cyanide speciation studies FY 1994 annual report (open access)

Ferrocyanide Safety Program cyanide speciation studies FY 1994 annual report

None
Date: September 1, 1994
Creator: Bryan, S. A.; Pool, K. H.; Bryan, S. L.; Sell, R. L.; Thomas, L. M. P. & Lerner, B. D.
Object Type: Report
System: The UNT Digital Library
Ferrocyanide safety project task 3 ferrocyanide aging studies FY 1994 annual report (open access)

Ferrocyanide safety project task 3 ferrocyanide aging studies FY 1994 annual report

None
Date: September 1, 1994
Creator: Lilga, M. A.; Alderson, E. V.; Kowalski, D. J.; Lumetta, M. R. & Schiefelbein, G. F.
Object Type: Report
System: The UNT Digital Library
Fiscal year 1994 well installation program summary report, Y-12 Plant, Oak Ridge, Tennessee (open access)

Fiscal year 1994 well installation program summary report, Y-12 Plant, Oak Ridge, Tennessee

This report summarizes the well installation activities conducted during the federal fiscal year (FY) 1994 drilling program at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Synopses of monitoring well construction/well development data, well location rationale, geological/hydrological observations, quality assurance/quality control methods, and health and safety monitoring are included. Two monitoring wells were installed and one piezometer installation was attempted, but not completed, during the FY 1994 drilling program. In addition, SAIC provided health and safety and geotechnical oversight for two soil borings in support of the Y-12 Underground Storage Tank (UST) Program. All new monitoring wells were developed by either a 2.0-in. diameter swab rig or by hand bailing until nonspecific indicator parameters (pH and specific conductance) attained steady-state levels. Turbidity levels were lowered, if required, to the extent practicable by continued development beyond a steady-state level of pH and conductance. All well installation was conducted following industry-standard methods and approved procedures in the Environment Surveillance Procedures Quality Control Program (Energy Systems 1988), the Resource Conservation and Recovery Act (RCRA) Groundwater Monitoring Technical Enforcement Guidance Document (EPA 1986), and Guidelines for Installation of Monitor Wells at the Y-12 Plant (Geraghty and Miller 1985). Health and safety monitoring and field …
Date: September 1, 1994
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Fiscal years 1994--1998 Information Technology Strategic Plan. Volume 1 (open access)

Fiscal years 1994--1998 Information Technology Strategic Plan. Volume 1

A team of senior managers from across the US Nuclear Regulatory Commission (NRC), working with the Office of Information Resources Management (IRM), has completed an NRC Strategic Information Technology (IT) Plan. The Plan addresses three major areas: (1) IT Program Management, (2) IT Infrastructure, and (3) Information and Applications Management. Key recommendations call for accelerating the replacement of Agency workstations, implementing a new document management system, applying business process reengineering to selected Agency work processes, and establishing an Information Technology Council to advise the Director of IRM.
Date: November 1, 1993
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Functional Design Criteria for Fy 1993-2000 Groundwater Monitoring Wells (open access)

Functional Design Criteria for Fy 1993-2000 Groundwater Monitoring Wells

The purpose of this revision is to update the Line Item Project, 93-L-GFW-152 Functional Design Criteria (FDC) to reflect changes approved in change control M-24-91-6, Engineering Change Notices (ECNs), and expand the scope to include subsurface investigations along with the borehole drilling. This revision improves the ability and effectiveness of maintaining RCRA and Operational groundwater compliance by combining borehole and well drilling with subsurface data gathering objectives. The total projected number of wells to be installed under this project has decreased from 200 and the scope has been broadened to include additional subsurface investigation activities that usually occur simultaneously with most traditional borehole drilling and monitoring well installations. This includes borehole hydrogeologic characterization activities, and vadose monitoring. These activities are required under RCRA 40 CFR 264 and 265 and WAC 173-303 for site characterization, groundwater and vadose assessment and well placement.
Date: January 1, 1996
Creator: Williams, B. A.
Object Type: Report
System: The UNT Digital Library
FY 1994 ambient air monitoring report for McMurdo Station, Antarctica (open access)

FY 1994 ambient air monitoring report for McMurdo Station, Antarctica

This report presents the results of ambient air monitoring performed during the 1994 fiscal year (FY 1994) in the vicinity of McMurdo Station, Antarctica. Routine monitoring was performed during the 1993-1994 austral summer at three locations for airborne particulate matter less than 10 micrometers (PM-10) and at two locations for carbon monoxide (CO), sulfur dioxide (SO{sub 2}), and nitrogen oxides (NO, NO{sub 2}, and NO{sub x}). Selected PM-10 filters were analyzed for arsenic, beryllium, cadmium, chromium, lead, mercury, and nickel. Additional air samples were collected at three McMurdo area locations and at Black Island for determination of the airborne concentration of polychlorinated dibenzo-p-dioxins (PCDDs) and polychlorinated dibenzofurans (PCDFs). Sampling site selection, sampling procedures, and quality assurance procedures used were consistent with US Environmental Protection Agency guidance for local ambient air quality networks.
Date: December 1, 1994
Creator: Lugar, R.M.
Object Type: Report
System: The UNT Digital Library
FY94 and FY95 thermal stabilization campaign report (open access)

FY94 and FY95 thermal stabilization campaign report

The report provides a synopsis of the FY94/95 Thermal Stabilization Campaign. The FY94 Thermal Stabilization Campaign ran from November 1, 1994 to June 13, 1995 and stabilized 236 items (22 kg) of reactive plutonium bearing material. A total of 49 cans of stabilized material was moved to the vaults for interim storage. While the initial downtime was high, with an Operating Efficiency (OE) of 27% over the first 3 months, the OE improved to 78% during the last 5 months for an overall DE of 58%. The campaign was completed 85 days ahead of schedule thus exceeding the ``Excellent``date for the Performance Base Incentive (PBI) for this campaign by 25 business days.
Date: January 10, 1996
Creator: Lewis, W.S.
Object Type: Report
System: The UNT Digital Library
FY94 CAG trip reports, CAG memos and other products: Volume 2. Final report (open access)

FY94 CAG trip reports, CAG memos and other products: Volume 2. Final report

The Yucca Mountain Site Characterization Project (YMP) of the US DOE is tasked with designing, constructing, and operating an Exploratory Studies Facility (ESF) at Yucca Mountain, Nevada. The purpose of the YMP is to provide detailed characterization of the Yucca Mountain site for the potential mined geologic repository for permanent disposal of high-level radioactive waste. Detailed characterization of properties of the site are to be conducted through a wide variety of short-term and long-term in-situ tests. Testing methods require the installation of a large number of test instruments and sensors with a variety of functions. These instruments produce analog and digital data that must be collected, processed, stored, and evaluated in an attempt to predict performance of the repository. The Integrated Data and Control System (IDCS) is envisioned as a distributed data acquisition that electronically acquires and stores data from these test instruments. IDCS designers are responsible for designing and overseeing the procurement of the system, IDCS Operation and Maintenance operates and maintains the installed system, and the IDCS Data Manager is responsible for distribution of IDCS data to participants. This report is a compilation of trip reports, interoffice memos, and other memos relevant to Computer Applications Group, Inc., work …
Date: December 15, 1994
Creator: unknown
Object Type: Report
System: The UNT Digital Library
FY94 site characterization and multilevel well installation at a west Bear Creek Valley research site on the Oak Ridge Reservation (open access)

FY94 site characterization and multilevel well installation at a west Bear Creek Valley research site on the Oak Ridge Reservation

The goals of this project are to collect data that will assist in determining what constitutes a representative groundwater sample in fractured shale typical of much of the geology underlying the ORR waste disposal sites, and to determine how monitoring-well construction and sampling methods impact the representativeness of the sample. This report details the FY94 field activities at a research site in west Bear Creek Valley on the Oak Ridge Reservation (ORR). These activities funded by the Energy Systems Groundwater Program Office through the Oak Ridge Reservation Hydrologic and Geologic Studies (ORRHAGS) task, focus on developing appropriate sampling protocols for the type of fractured media that underlies many of the ORR waste disposal sites. Currently accepted protocols were developed for porous media and are likely to result in nonrepresentative samples in fractured systems.
Date: March 1, 1996
Creator: Moline, G.R. & Schreiber, M.E.
Object Type: Report
System: The UNT Digital Library
Geothermal Division Multiyear Plan FY 1992-1996 (open access)

Geothermal Division Multiyear Plan FY 1992-1996

This administrative report of the Department of Energy is dated December 21, 1990. It is marked ''DRAFT'' as were many of this type of report, most of which were never made ''Final''. It provides contextual elements for program planning, and covers research on Hydrothermal, Geopressured Geothermal, Hot Dry Rock, and Magma Energy systems. (DJE 2005)
Date: December 21, 1990
Creator: unknown
Object Type: Report
System: The UNT Digital Library