100 Areas technical activities report -- Engineering, June, 1948 (open access)

100 Areas technical activities report -- Engineering, June, 1948

This report covers work done by the Pile Engineering Groups and work done on special assignments. Topics covered include: slug blistering and corrosion; graphite allocation to DR pile; slug molding; segmental discharge; Van Stone corrosion; flow laboratory modifications; downcomer at B pile; downcomer at D pile; annealing of pile graphite; replacement of pile atmosphere with CO{sub 2}; unit motion; beta experiment; can opening; slug annealing; new technical building, 300 area; and ruptured slugs.
Date: July 19, 1948
Creator: Woods, W. K.
System: The UNT Digital Library
Drilling of 107-F Test Well (open access)

Drilling of 107-F Test Well

None
Date: October 19, 1948
Creator: Brown, R. E.
System: The UNT Digital Library
Electronic Structure of the heaviest Elements (open access)

Electronic Structure of the heaviest Elements

None
Date: April 19, 1948
Creator: Seaborg, G. T.
System: The UNT Digital Library
Final report on Production Test 105-58-P -- B Pile reactivity under shutdown conditions (open access)

Final report on Production Test 105-58-P -- B Pile reactivity under shutdown conditions

Following the shutdown of the B Pile in March 1946 a method was devised for monitoring the sub-critical reactivity such that any significant change in neutron flux would be detected. This report summarizes the status of the unit until its start up in July 1948.
Date: July 19, 1948
Creator: Kruesi, F. E.
System: The UNT Digital Library
REACTION RATE OF THE FLUORINATION OF URANIUM DIOXIDE AT A CONTINUOUSLY INCREASING TEMPERATURE (open access)

REACTION RATE OF THE FLUORINATION OF URANIUM DIOXIDE AT A CONTINUOUSLY INCREASING TEMPERATURE

Using an apparatus described in a preceeding paper the reaction rate of the fluorination of UO/sub 2/ by HF was measured under the condition of a gradually increasing temperature. UF/sub 4/ made in this way did not show caking although final reaction temperatures ranged as high as 700 deg C. The rate of reaction was found to be greater than the rate measured under isothermal conditions at the highest temperature attained during the continuous increase as long as this final temperature was above 550 deg C. (auth)
Date: July 19, 1948
Creator: Kuhlman, C.W.
System: The UNT Digital Library
Research Progress Meeting of February 19, 1948 (open access)

Research Progress Meeting of February 19, 1948

Much of the cloud chamber work has been directed toward obtaining the angular distribution of protons bombarded by deuterons from the 184-inch cyclotron. The observations have been restricted to those protons arising from neutrons of energy greater than 65 Mev. The cloud chamber used for this work is of 16-inch diruneter and employs a magnetic field of 14000 gauss. The chamber is filled with hydrogen at a pressure of 1/2 atmosphere; the vapor used is water and alchohol. Nearly 800 proton tracks were measured and calculated before analysis of the data indicated that the measuring procedure should be revised. They gave the angular and energy distributions shown in Figures 1 and 2. The discrepencies between the theoretical and experimental energy distribution of the neutrons shows that serious errors were being made. As a first check of possible sources of error, random parts of the data were remeasured. They indicated that errors in the measurements of the angles were being made that gave a mean deviation of about {+-} 2{sup o} in the beam angle and {+-} 4{sup o} in the dip angle. These errors were largest at large scatter angles. In addition, a more serious error occured in the measurements …
Date: February 19, 1948
Creator: Wakerling, R.K.
System: The UNT Digital Library