24,791 Matching Results

Results open in a new window/tab.

$D^0 \bar{D}^0$ Mixing at BaBar (open access)

$D^0 \bar{D}^0$ Mixing at BaBar

This article reviews the recent measurement of D{sup 0}-{bar D}{sup 0} mixing with the D{sup 0} {yields} K{pi} decay channel from the BABAR experiment at the PEP-II B-Factory. Averages from the Heavy Flavor Averaging Group between this result and a previous result from BELLE are also presented.
Date: October 26, 2011
Creator: Coleman, Jonathon
Object Type: Article
System: The UNT Digital Library
1.3 GHz superconducting RF cavity program at Fermilab (open access)

1.3 GHz superconducting RF cavity program at Fermilab

At Fermilab, 9-cell 1.3 GHz superconducting RF (SRF) cavities are prepared, qualified, and assembled into cryomodules (CMs) for Project X, an International Linear Collider (ILC), or other future projects. The 1.3 GHz SRF cavity program includes targeted R&D on 1-cell 1.3 GHz cavities for cavity performance improvement. Production cavity qualification includes cavity inspection, surface processing, clean assembly, and one or more cryogenic low-power CW qualification tests which typically include performance diagnostics. Qualified cavities are welded into helium vessels and are cryogenically tested with pulsed high-power. Well performing cavities are assembled into cryomodules for pulsed high-power testing in a cryomodule test facility, and possible installation into a beamline. The overall goals of the 1.3 GHz SRF cavity program, supporting facilities, and accomplishments are described.
Date: March 1, 2011
Creator: Ginsburg, C. M.; Arkan, T.; Barbanotti, S.; Carter, H.; Champion, M.; Cooley, L. et al.
Object Type: Article
System: The UNT Digital Library
1-Benzyl-3,5-bis(4-chlorobenzylidene)-piperidin-4-one (open access)

1-Benzyl-3,5-bis(4-chlorobenzylidene)-piperidin-4-one

The title compound, C₂₆H₂₁Cl₂NO, crystallizes with two symmetry-independent molecules in the asymmetric unit.
Date: May 16, 2011
Creator: Nesterov, Volodymyr V.; Sarkisov, Sergey S.; Shulaev, Vladimir & Nesterov, Vladimir N.
Object Type: Article
System: The UNT Digital Library

2,490 Feet

The work is a coiled piece of paper that measures 2,490 feet when unwound. Pieces of white string tie sections to hold it in place.
Date: 2011/2012
Creator: Lawrence, Annette
Object Type: Artwork
System: The UNT Digital Library
3,4,3-LI(1,2-HOPO): In Vitro Formation of Highly Stable Lanthanide Complexes Translates into Efficacious In Vivo Europium Decorporation (open access)

3,4,3-LI(1,2-HOPO): In Vitro Formation of Highly Stable Lanthanide Complexes Translates into Efficacious In Vivo Europium Decorporation

The spermine-based hydroxypyridonate octadentate chelator 3,4,3-LI(1,2-HOPO) was investigated for its ability to act as an antennae that sensitizes the emission of Sm{sup III}, Eu{sup III}, and Tb{sup III} in the Visible range (Φ{sub tot} = 0.2 - 7%) and the emission of Pr{sup III}, Nd{sup III}, Sm{sup III}, and Yb{sup III} in the Near Infra-Red range, with decay times varying from 1.78 μs to 805 μs at room temperature. The particular luminescence spectroscopic properties of these lanthanide complexes formed with 3,4,3-LI(1,2-HOPO) were used to characterize their respective solution thermodynamic stabilities as well as those of the corresponding La{sup III}, Gd{sup III}, Dy{sup III}, Ho{sup III}, Er{sup III}, Tm{sup III}, and Lu{sup III} complexes. The remarkably high affinity of 3,4,3-LI(1,2-HOPO) for lanthanide metal ions and the resulting high complex stabilities (pM values ranging from 17.2 for La{sup III} to 23.1 for Yb{sup III}) constitute a necessary but not sufficient criteria to consider this octadentate ligand an optimal candidate for in vivo metal decorporation. The in vivo lanthanide complex stability and decorporation capacity of the ligand were assessed, using the radioactive isotope {sup 152}Eu as a tracer in a rodent model, which provided a direct comparison with the in vitro thermodynamic results …
Date: July 13, 2011
Creator: Sturzbecher-Hoehne, Manuel; Ng Pak Leung, Clara; Daleo, Anthony; Kullgren, Birgitta; Prigent, Anne-Laure; Shuh, David K. et al.
Object Type: Article
System: The UNT Digital Library
3,5-Bis(4-chlorobenzylidene)-1-methyl-piperidin-4-one (open access)

3,5-Bis(4-chlorobenzylidene)-1-methyl-piperidin-4-one

In the title molecule, C₂₀H₁₇Cl₂NO, the central heterocyclic ring adopts a flattened boat conformation.
Date: February 23, 2011
Creator: Nesterov, Volodymyr V.; Sarkisov, Sergey S.; Shulaev, Vladimir & Nesterov, Vladimir N.
Object Type: Article
System: The UNT Digital Library
N >= 4 Supergravity Amplitudes from Gauge Theory at One Loop (open access)

N >= 4 Supergravity Amplitudes from Gauge Theory at One Loop

We expose simple and practical relations between the integrated four- and five-point one-loop amplitudes of N {ge} 4 supergravity and the corresponding (super-)Yang-Mills amplitudes. The link between the amplitudes is simply understood using the recently uncovered duality between color and kinematics that leads to a double-copy structure for gravity. These examples provide additional direct confirmations of the duality and double-copy properties at loop level for a sample of different theories.
Date: August 19, 2011
Creator: Bern, Z.; Boucher-Veronneau, C. & Johansson, H.
Object Type: Article
System: The UNT Digital Library
8(a) Program: The Importance of Effective Fraud Prevention Controls (open access)

8(a) Program: The Importance of Effective Fraud Prevention Controls

Testimony issued by the Government Accountability Office with an abstract that begins "This testimony discusses the results of our prior investigation of the Small Business Administration's (SBA) 8(a) Business Development Program. SBA's 8(a) program, named for a section of the Small Business Act, is a development program created to help small, disadvantaged businesses compete in the American economy and access the federal procurement market. To participate in the program, a firm must be certified as meeting several criteria, including: be a small business as defined by SBA; be unconditionally owned and controlled by one or more socially and economically disadvantaged individuals who are of good character and citizens of the United States; and show potential for success. Upon certification, firms can obtain federal contracts without competing fully and openly for the work. For example, agencies are permitted to enter into sole-source contracts after soliciting and negotiating with only one 8(a) company. They also can participate in restricted competitions for federal contracts, known as set-asides, open to only 8(a) companies. In March 2010, GAO issued two companion reports on the 8(a) program, one focused on internal control procedures and processes that SBA has implemented to ensure that only eligible firms participate …
Date: March 3, 2011
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
08-ERD-071 Final Report: New Molecular Probes and Catalysts for Bioenergy Research (open access)

08-ERD-071 Final Report: New Molecular Probes and Catalysts for Bioenergy Research

A major thrust in bioenergy research is to develop innovative methods for deconstructing plant cell wall polymers, such as cellulose and lignin, into simple monomers that can be biologically converted to ethanol and other fuels. Current techniques for monitoring a broad array of cell wall materials and specific degradation products are expensive and time consuming. To monitor various polymers and assay their breakdown products, molecular probes for detecting specific carbohydrates and lignins are urgently needed. These new probes would extend the limited biochemical techniques available, and enable realtime imaging of ultrastructural changes in plant cells. Furthermore, degradation of plant biomass could be greatly accelerated by the development of catalysts that can hydrolyze key cell wall polysaccharides and lignin. The objective of this project was to develop cheap and efficient DNA reagents (aptamers) used to detect and quantify polysaccharides, lignin, and relevant products of their breakdown. A practical goal of the research was to develop electrochemical aptamer biosensors, which could be integrated into microfluidic devices and used for high-throughput screening of enzymes or biological systems that degrade biomass. Several important model plant cell wall polymers and compounds were targeted for specific binding and purification of aptamers, which were then tested by …
Date: March 7, 2011
Creator: Thelen, M. P.; Rowe, A. A.; Siebers, A. K. & Jiao, Y.
Object Type: Report
System: The UNT Digital Library
A 10,000 groove/mm multilayer coated grating for EUV spectroscopy (open access)

A 10,000 groove/mm multilayer coated grating for EUV spectroscopy

Ultra-high spectral resolution in the EUV and soft x-ray energy ranges requires the use of very high line density gratings with optimal design resulting in use of a Blazed Multilayer Grating (BMG) structure. Here we demonstrate the production of near-atomically perfect Si blazed substrates with an ultra-high groove density (10,000 l/mm) together with the measured and theoretical performance of an Al/Zr multilayer coating on the grating. A 1st order absolute efficiency of 13percent and 24.6percent was achieved at incidence angles of 11o and 36o respectively. Cross-sectional TEM shows the effect of smoothing caused by the surface mobility of deposited atoms and we correlate this effect with a reduction in peak diffraction efficiency. This work shows the high performance that can be achieved with BMGs based on small-period anisotropic etched Si substrates, but also the constraints imposed by the surface mobility of deposited species.
Date: February 7, 2011
Creator: Voronov, Dmytro; Anderson, Erik; Cambie, Rossana; Cabrini, Stefano; Dhuey, Scott; Goray, Leonid et al.
Object Type: Article
System: The UNT Digital Library
10 CFR 830 Major Modification Determination for Emergency Firewater Injection System Replacement (open access)

10 CFR 830 Major Modification Determination for Emergency Firewater Injection System Replacement

The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent sub-projects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the fifty year old antiquated marine diesels with commercial power that is backed with safety-related emergency diesel generators (EDGs), switchgear, and uninterruptible power supply. The second project will replace the four, obsolete, original primary coolant pumps and motors. The third project, the subject of this major …
Date: May 1, 2011
Creator: Duckwitz, Noel
Object Type: Report
System: The UNT Digital Library
10 CFR 830 Major Modification Determination for Replacement of ATR Primary Coolant Pumps and Motors (open access)

10 CFR 830 Major Modification Determination for Replacement of ATR Primary Coolant Pumps and Motors

The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the 50-year-old obsolescent marine diesels with commercial power that is backed with safety related emergency diesel generators, switchgear, and uninterruptible power supply (UPS). The second project, the subject of this major modification determination, will replace the four, obsolete, original primary coolant pumps (PCPs) and motors. Completion …
Date: May 1, 2011
Creator: Duckwitz, Noel
Object Type: Report
System: The UNT Digital Library
10 CFR 830 Major Modification Determination for the ATR Diesel Bus (E-3) and Switchgear Replacement (open access)

10 CFR 830 Major Modification Determination for the ATR Diesel Bus (E-3) and Switchgear Replacement

Near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project, subject of this determination, will replace the existent diesel-electrical bus (E-3) and associated switchgear. More specifically, INL proposes transitioning ATR to 100% commercial power with appropriate emergency backup to include: • Provide commercial power as the normal source of power to the ATR loads currently supplied by diesel-electric power. • Provide backup power to the critical ATR loads in the event of a loss of commercial power. • Replace obsolescent critical ATR power distribution equipment, e.g., switchgear, transformers, motor control centers, distribution panels. Completion of this and two other age-related projects (primary coolant pump and motor replacement and emergency firewater injection system replacement) will resolve major age related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues make the project a major modification: 1. Evaluation Criteria #2 (Footprint change). The addition …
Date: May 1, 2011
Creator: Duckwtiz, Noel
Object Type: Report
System: The UNT Digital Library
10 Questions: About Pregnancy and HIV (open access)

10 Questions: About Pregnancy and HIV

This pamphlet provides information on why pregnant women need to get tested for HIV.
Date: June 2011
Creator: Texas Consortium for Perinatal HIV Prevention
Object Type: Pamphlet
System: The Portal to Texas History
A 12 GHZ 50 MW Klystron for Support of Accelerator Research (open access)

A 12 GHZ 50 MW Klystron for Support of Accelerator Research

A 12 GHz 50MW X-band klystron is under development at the SLAC National Accelerator Laboratory Klystron Department. The klystron will be fabricated to support programs currently underway at three European Labs; CERN, PSI, and INFN Trieste. The choice of frequency selection was due to the CLIC RF frequency changing from 30 GHz to the European X-band frequency of 11.99 GHz in 2008. Since the Klystron Department currently builds 50MW klystrons at 11.424 GHz known collectively as the XL4 klystrons, it was deemed cost-effective to utilize many XL4 components by leaving the gun, electron beam transport, solenoid magnet and collector unchanged. To realize the rf parameters required, the rf cavities and rf output hardware were necessarily altered. Some improvements to the rf design have been made to reduce operating gradients and increase reliability. Changes in the multi-cell output structure, waveguide components, and the window will be discussed along with testing of the devices. Five klystrons known as XL5 klystrons are scheduled for production over the next two years.
Date: May 31, 2011
Creator: Sprehn, Daryl; Haase, Andrew; Jensen, Aaron; Jongewaard, Erik; Nantista, Christopher & Vlieks, Arnold
Object Type: Article
System: The UNT Digital Library
50 MW X-BAND RF SYSTEM FOR A PHOTOINJECTOR TEST STATION AT LLNL (open access)

50 MW X-BAND RF SYSTEM FOR A PHOTOINJECTOR TEST STATION AT LLNL

In support of X-band photoinjector development efforts at LLNL, a 50 MW test station is being constructed to investigate structure and photocathode optimization for future upgrades. A SLAC XL-4 klystron capable of generating 50 MW, 1.5 microsecond pulses will be the high power RF source for the system. Timing of the laser pulse on the photocathode with the applied RF field places very stringent requirements on phase jitter and drift. To achieve these requirements, the klystron will be powered by a state of the art, solid-state, high voltage modulator. The 50 MW will be divided between the photoinjector and a traveling wave accelerator section. A high power phase shifter is located between the photoinjector and accelerator section to adjust the phasing of the electron bunches with respect to the accelerating field. A variable attenuator is included on the input of the photoinjector. The distribution system including the various x-band components is being designed and constructed. In this paper, we will present the design, layout, and status of the RF system.
Date: March 11, 2011
Creator: Marsh, R A; Anderson, S G; Barty, C J; Beer, G K; Cross, R R; Ebbers, C A et al.
Object Type: Article
System: The UNT Digital Library
100-BC-5 Operable Unit, Batch Leach Analyses and Report for Sediments at RI/FS Wells C7508, C7783, C7784, C7785, and C7787 (open access)

100-BC-5 Operable Unit, Batch Leach Analyses and Report for Sediments at RI/FS Wells C7508, C7783, C7784, C7785, and C7787

This is an analytical data report for sediment samples from the 100 BC Operable unit. This report contains the updated dates for samples associated with Hexavalent Chromium/Soil analysis. Between August 24, 2010 and March 3, 2011 sediment samples were received from 100-BC Decision Unit Soil for geochemical studies. The analyses for this project were performed at the 331 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL.
Date: April 2011
Creator: Lindberg, Michael J.
Object Type: Report
System: The UNT Digital Library
100% DD Energy Model Update (open access)

100% DD Energy Model Update

The Miami Science Museum energy model has been used during DD to test the building’s potential for energy savings as measured by ASHRAE 90.1-2007 Appendix G. This standard compares the designed building’s yearly energy cost with that of a code-compliant building. The building is currently on track show 20% or better improvement over the ASHRAE 90.1-2007 Appendix G baseline; this performance would ensure minimum compliance with both LEED 2.2 and current Florida Energy Code, which both reference a less strict version of ASHRAE 90.1. In addition to being an exercise in energy code compliance, the energy model has been used as a design tool to show the relative performance benefit of individual energy conservation measures (ECMs). These ECMs are areas where the design team has improved upon code-minimum design paths to improve the energy performance of the building. By adding ECMs one a time to a code-compliant baseline building, the current analysis identifies which ECMs are most effective in helping the building meet its energy performance goals.
Date: June 30, 2011
Creator: unknown
Object Type: Report
System: The UNT Digital Library
100-NR-2 Apatite Treatability Test: An update on Barrier Performance (open access)

100-NR-2 Apatite Treatability Test: An update on Barrier Performance

This report updates a previous report covering the performance of a permeable reactive barrier installed at 100N. In this report we re-evaluate the results after having an additional year of performance monitoring data to incorporate.
Date: May 1, 2011
Creator: Fritz, Brad G.; Vermeul, Vincent R.; Fruchter, Jonathan S.; Szecsody, James E. & Williams, Mark D.
Object Type: Report
System: The UNT Digital Library
100-NR-2 Apatite Treatability Test: Fall 2010 Tracer Infiltration Test (White Paper) (open access)

100-NR-2 Apatite Treatability Test: Fall 2010 Tracer Infiltration Test (White Paper)

The primary objectives of the tracer infiltration test were to 1) determine whether field-scale hydraulic properties for the compacted roadbed materials and underlying Hanford fm. sediments comprising the zone of water table fluctuation beneath the site are consistent with estimates based laboratory-scale measurements on core samples and 2) characterize wetting front advancement and distribution of soil moisture achieved for the selected application rate. These primary objectives were met. The test successfully demonstrated that 1) the remaining 2 to 3 ft of compacted roadbed material below the infiltration gallery does not limit infiltration rates to levels that would be expected to eliminate near surface application as a viable amendment delivery approach and 2) the combined aqueous and geophysical monitoring approaches employed at this site, with some operational adjustments based on lessons learned, provides an effective means of assessing wetting front advancement and the distribution of soil moisture achieved for a given solution application. Reasonably good agreement between predicted and observed tracer and moisture front advancement rates was observed. During the first tracer infiltration test, which used a solution application rate of 0.7 cm/hr, tracer arrivals were observed at the water table (10 to 12 ft below the bottom of the infiltration …
Date: April 14, 2011
Creator: Vermeul, Vincent R.; Fritz, Brad G.; Fruchter, Jonathan S.; Greenwood, William J.; Johnson, Timothy C.; Horner, Jacob A. et al.
Object Type: Report
System: The UNT Digital Library
200-BP-1 Prototype Hanford Barrier -- 15 Years of Performance Monitoring (open access)

200-BP-1 Prototype Hanford Barrier -- 15 Years of Performance Monitoring

Monitoring is an essential component of engineered barrier system design and operation. A composite capacitive cover, including a capillary break and an evapotranspiration (ET) barrier at the Hanford Site, is generating data that can be used to help resolve these issues. The prototype Hanford barrier was constructed over the 216-B-57 Crib in 1994 to evaluate surface-barrier constructability, construction costs, and physical and hydrologic performance at the field scale. The barrier has been routinely monitored between November 1994 and September 1998 as part of a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) treatability test of barrier performance for the 200 BP 1 Operable Unit. Since FY 1998, monitoring has focused on a more limited set of key water balance, stability, and biotic parameters. In FY 2009, data collection was focused on: (1) water-balance monitoring, consisting of precipitation, runoff, soil moisture storage, and drainage measurements with evapotranspiration calculated by difference; (2) stability monitoring, consisting of asphalt-layer-settlement, basalt-side-slope-stability, and surface-elevation measurements; (3) vegetation dynamics; and (4) animal use. September 2009 marked 15 years since the start of monitoring and the collection of performance data. This report describes the results of monitoring activities during the period October 1, 2008, through September …
Date: September 30, 2011
Creator: Ward, Anderson L.; Draper, Kathryn E.; Link, Steven O. & Clayton, Ray E.
Object Type: Report
System: The UNT Digital Library
200-DV-1OU Sediment and Pore Water Analysis and Report for Samples at Borehole C8096 (open access)

200-DV-1OU Sediment and Pore Water Analysis and Report for Samples at Borehole C8096

This is an analytical data report for sediment samples received at 200-DV-1 OU. On August 30, 2011 sediment samples were received from 200-DV-1 OU Borehole C8096 for geochemical studies. The analyses for this project were performed at the 331 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL.
Date: October 1, 2011
Creator: Lindberg, Michael J.
Object Type: Report
System: The UNT Digital Library
200% Efficient Singlet Fission Observed (Fact Sheet) (open access)

200% Efficient Singlet Fission Observed (Fact Sheet)

NREL scientists confirm the first molecular compound designed specifically to exhibit exciton multiplication.
Date: June 1, 2011
Creator: unknown
Object Type: Report
System: The UNT Digital Library
A 200 MHz 35 MW Multiple Beam Klystron for Accelerator Applications Final Report (open access)

A 200 MHz 35 MW Multiple Beam Klystron for Accelerator Applications Final Report

Calabazas Creek Research, Inc. (CCR) performed initial development of a compact and reliable 35 MW, multiple beam klystron (MBK) at 200 MHz with a pulse length of 0.125 ms and a 30 Hz repetition rate. The device was targeted for acceleration and ionization cooling of a muon collider, but there are several other potential applications in this frequency range. The klystron uses multiple beams propagating in individual beam tunnels to reduce space charge and allow reduction in the accelerating voltage. This allows a significant reduction in length over a single beam source. More importantly this allows more efficient and less expensive power supplies. At 200 MHz, the interaction circuit for a single beam klystron would be more than six meters long to obtain 50% efficiency and 50 dB gain. This would require a beam voltage of approximately 400 kV and current of 251 A for a microperveance of 1.0. For an eight beam MBK with the same beam perveance, a three meter long interaction circuit achieves the same power and gain. Each beam operates at 142 kV and 70A. The Phase I demonstrated that this device could be fabricated with funding available in a Phase II program and could achieve …
Date: November 28, 2011
Creator: Ives, R. Lawrence; Read, Michael; Ferguson, Patrick & Marsden, David
Object Type: Report
System: The UNT Digital Library